A PUE of 1.48 means every kWh the IT gear consumes comes with a total facility draw of 1.48 kWh. Over a year the site uses 12,970 MWh, and 4,210 MWh of that is overhead worth 505,247 €. If the PUE fell to 1.3, the same IT load would save 189,887 € and 725 t CO₂ annually.
PUE
1.48
DCiE 67.5%
Facility power
1,481kW
Annual energy
12,970MWh
8,760 MWh for IT
Annual electricity cost
1.6million €
Cost of overhead
€505,247
cooling, electrical losses and the building
Yearly cost per kW of IT load
€1,556
Saving at target PUE
€189,887
1,582 MWh per year
CO₂ per year
5,940t
Water per year
15,768m³
WUE 1.8 L/kWh
Energy balance
| Component | kW | MWh/yr | Share |
|---|---|---|---|
| IT equipment | 1,000 | 8,760 | 67.5% |
| Cooling | 375.5 | 3,290 | 25.4% |
| UPS losses | 65.1 | 570 | 4.4% |
| Transformers & PDUs | 20 | 175 | 1.4% |
| Lighting & other | 20 | 175 | 1.4% |
- ISO/IEC 30134-2 defines PUE as measured over a whole year at the facility meter, while this tool works with average power. When you know the PUE, the overhead split shown is only illustrative (70% cooling).
- Water use depends strongly on cooling design and climate, so enter your own WUE (ISO/IEC 30134-9). Emissions rely on the average grid intensity of the chosen country.