Results

Running 10 MW for 4,818 h/yr gives 884 t of hydrogen annually. The levelized cost is 4.52 €/kg (largest component: Electricity), lower than your sale price of 6 €/kg, so you keep a margin.
Hydrogen production
884t/yr
2,422 kg/day on average · 183 kg/h at full load
Levelized cost (LCOH)
4.52€/kg
136 €/MWh (LHV)
Electricity used
48.2GWh/yr
54.5 kWh/kg with degradation counted
Efficiency
61.2%
LHV · 72.3% HHV
Water consumption
13,262m³/yr
15 L/kg (stoichiometric 8.9)
Oxygen by-product
7,020t/yr
Stack replacements
1
every 16.6 years (80,000 h)
Total capex
€16,000,000
1,600 €/kW
Project NPV at your sale price
€15,247,042
6 €/kg, 7% WACC
CO₂ avoided vs grey H₂
8,841t/yr
≈10 kg CO₂ per kg from SMR without capture
Equivalent uses
7,368 FCEVs
equal to 5,013 t of ammonia · 2,959 m³ of diesel
LCOH breakdown
LCOH by capacity factor

Electrolyzer types (typical 2023–2025 figures)

TechnologySystem kWh/kgEfficiency (LHV)Stack life (h)Installed capex (€/kW)Notes
Alkaline (AEL)50–5561–67%60,000–90,0001,400–2,000proven and cheapest, ramps up more slowly
PEM52–5857–64%50,000–80,0001,700–2,500small footprint, quick response, needs iridium/platinum
SOEC37–42 + heat75–85%20,000–40,0002,500–4,000+runs hot, works best with waste heat or steam
AEM50–5758–66%<30,000early marketno PGMs, small units
  • Total up O&M, electricity, water, heat, capex × CRF and PV of stack replacements × CRF, then divide by the kg produced per year to get LCOH. The calculation leaves out taxes, grid fees, storage, transport and subsidies.
  • A real plant seldom holds one flat capacity factor. Variable renewables bring minimum-load limits and ramp rates that trim output; buffer storage or a top-up from the grid lifts utilisation again.
  • Capex figures span a wide band and shift fast. Alkaline systems from China are quoted far below installed costs in the West. For current numbers, see the latest IEA Global Hydrogen Review.