Results

Stored energy: 2.4 GWh, deliverable at 300 MW for 7.9 hours, with 75.7% round-trip efficiency. That duration suits daily charge-discharge cycling. Head counts as much as volume, since each cubic metre stores 0.95 kWh. Selling the spread alone does not recover the levelized cost (119 against 110 €/MWh), though actual plants also collect capacity and grid-service income.
Energy returned per complete cycle
2.4GWh
3,147 MWh needed to pump it up
Round-trip efficiency
75.7%
generating 87.5% · pumping 86.6%
Discharge time
7.9h
at 300 MW, flow 87 m³/s
Charge time
10.5h
at 300 MW pumping
Gravitational energy (ideal)
2,725MWh
ρ·g·V·H, before losses
Reservoir drawdown
6.3m
1.6% of head; output holds steady below about 15%
Olympic pools
1,000
0.95 kWh per m³ of water
Arbitrage margin / yr
€36,164,992
300 cycles · spread 65 €/MWh
LCOS (incl. charging)
119€/MWh
capital + O&M alone 60 €/MWh
Simple payback
18 yr 11 mo
capex 600 M€
Equivalent battery containers
611
≈3.9 MWh in one utility-scale battery container
Breakdown of the pumping energy
Deliverable energy of your volume at different heads

Existing pumped-storage plants for reference (approximate)

PlantPower (MW)Storage (GWh)Head (m)Hours
Your design3002.384007.9
Dinorwig, UK1,728~9~500~5
Goldisthal, Germany1,060~8.5~300~8
Bath County, USA~3,000~24~380~8–11
Cruachan, UK440~7~365~16
  • Head changes as the reservoirs fill and drain, and this model works with the mean head. A big drawdown relative to head cuts power and efficiency toward the end of discharge.
  • The model ignores evaporation, seepage and environmental-flow limits. Only energy arbitrage counts as revenue, whereas ancillary services (frequency response, inertia, reserve) can often bring in as much again.

Free calculator by Energy.com.info