Stored energy: 2.4 GWh, deliverable at 300 MW for 7.9 hours, with 75.7% round-trip efficiency. That duration suits daily charge-discharge cycling. Head counts as much as volume, since each cubic metre stores 0.95 kWh. Selling the spread alone does not recover the levelized cost (119 against 110 €/MWh), though actual plants also collect capacity and grid-service income.
Energy returned per complete cycle
2.4GWh
3,147 MWh needed to pump it up
Round-trip efficiency
75.7%
generating 87.5% · pumping 86.6%
Discharge time
7.9h
at 300 MW, flow 87 m³/s
Charge time
10.5h
at 300 MW pumping
Gravitational energy (ideal)
2,725MWh
ρ·g·V·H, before losses
Reservoir drawdown
6.3m
1.6% of head; output holds steady below about 15%
Olympic pools
1,000
0.95 kWh per m³ of water
Arbitrage margin / yr
€36,164,992
300 cycles · spread 65 €/MWh
LCOS (incl. charging)
119€/MWh
capital + O&M alone 60 €/MWh
Simple payback
18 yr 11 mo
capex 600 M€
Equivalent battery containers
611
≈3.9 MWh in one utility-scale battery container
Existing pumped-storage plants for reference (approximate)
| Plant | Power (MW) | Storage (GWh) | Head (m) | Hours |
|---|---|---|---|---|
| Your design | 300 | 2.38 | 400 | 7.9 |
| Dinorwig, UK | 1,728 | ~9 | ~500 | ~5 |
| Goldisthal, Germany | 1,060 | ~8.5 | ~300 | ~8 |
| Bath County, USA | ~3,000 | ~24 | ~380 | ~8–11 |
| Cruachan, UK | 440 | ~7 | ~365 | ~16 |
- Head changes as the reservoirs fill and drain, and this model works with the mean head. A big drawdown relative to head cuts power and efficiency toward the end of discharge.
- The model ignores evaporation, seepage and environmental-flow limits. Only energy arbitrage counts as revenue, whereas ancillary services (frequency response, inertia, reserve) can often bring in as much again.