Water on a hill as a battery
Think of pumped storage hydropower (PSH) as two lakes at different heights acting like one big rechargeable cell. With spare or cheap power, pumps push water to the top lake. When the grid needs energy, that water runs down through turbines. What is stored is gravitational potential energy, so how much water and how far it falls (the head) count equally.
Give the tool the usable volume, the gross head and the machine ratings. It reports:
- ideal gravitational energy versus the output left after hydraulic, turbine, generator and transformer losses;
- pumping energy for a refill, which yields the round-trip efficiency;
- charge and discharge hours at pump and turbine power, with the flow rate;
- reservoir drawdown, also as Olympic pools;
- arbitrage income, simple payback and levelized cost of storage (LCOS), with yearly cycles held to what the hours allow.
Formulas
Constants and units: ρ = 1,000 kg/m³, g = 9.81 m/s², V in m³, H in m; h_loss means hydraulic loss, as a share of head, applied on the way up and again on the way down.
Example: 300 MW and 8 hours
The preset has 300 MW of reversible machines and an upper basin of 2.5 million m³ usable water (the volume of 1,000 Olympic pools) perched 400 m over the lower basin.
Start with the physics: 1,000 × 9.81 × 2.5×10⁶ × 400 / 3.6×10⁹ ≈ 2,725 MWh ideal. Then apply losses of 3% of head each way, 92% for the turbine, 91% for the pump, 98.5% for the motor-generator and 99.5% for the transformer. The grid receives 2,380 MWh, and 3,150 MWh must be bought to refill, so about 76% comes back. Running flat out the plant discharges for 7.9 hours and pumps for 10.5 hours. Over 40 hectares the water level moves about 6 m, which is minor next to 400 m of head. One cubic metre ends up worth roughly 0.95 kWh at the meter.
Money next: buy at €45/MWh, sell at €110/MWh, 300 cycles a year, and the arbitrage margin comes to about €36 million. With capex at €2,000/kW (€600 million), simple payback is around 19 years. LCOS including charging energy (about €119/MWh) lands a bit above the sale price. That is typical, since real stations also earn capacity payments and grid-service income (reserves, frequency response, inertia, black start) that pure arbitrage ignores.
Interpreting what you see
- Energy per cycle: capacity you can actually use, measured at the grid connection.
- Round-trip efficiency: each delivered MWh requires 1/RTE MWh of purchased power. At 76%, the price spread has to exceed about 24% of the selling price before losses are even covered.
- Duration: this limits the services on offer. Cycling every day needs 4–10 hours, whereas weekly or seasonal shifting needs much more.
- Drawdown: a large level change relative to head means less head by the end of discharge, so power and efficiency sag.
- LCOS versus capital-only cost: the gap is the bill for charging energy.
Reference values
| Parameter | Typical range |
|---|---|
| Gross head | 100–800 m (best 300–700 m) |
| Round-trip efficiency | 70–82% |
| Discharge duration | 6–12 h (some > 20 h) |
| Unit size | 100–400 MW per reversible unit |
| Capex | 1,500–3,500 per kW |
| Design life | 50–100 years |
| Response time | ~1–2 minutes from standstill; seconds when spinning |
Three real stations for scale: Bath County in the USA (~3 GW, one of the biggest worldwide), Dinorwig in the UK (~1.7 GW, ~9 GWh, ~500 m head) and Goldisthal in Germany (~1.06 GW, ~8.5 GWh, ~300 m).
Design pointers
- Prefer height to volume. Double the head and the same dam, tunnel diameter and water store twice the energy, which is why steep sites are much cheaper per MWh.
- Start from what exists. An existing lake or disused mine pit plus one new basin saves money and eases environmental impact.
- Treat MW and MWh separately. Turbines decide power, reservoirs decide energy, and more water often costs less than more machines.
- Variable-speed units regulate power during pumping, which opens extra grid-service revenue.
- Weigh alternatives in the LCOE calculator and switch units via the energy unit converter.
Model limits
One average head is assumed, yet real head moves as basins fill and drain. Evaporation, seepage, environmental flow duties, ramp limits and outages are left out. Income is arbitrage at a constant spread, and the market, unlike charge and discharge time, does not cap the cycle count, so few plants truly manage a daily full cycle. Tunnels, dams and geology make capex site-specific.
Method & assumptions
Energy held in the upper reservoir is found as MWh = (ρ · g · V · H) ÷ 3.6×10⁹, taking ρ = 1,000 kg/m³ and g = 9.81 m/s² (E in joules). Output on the way down is reduced by head loss and by three machine stages: E · (1 − hloss) · ηturbine · ηgenerator · ηtransformer. On the way up, the grid must supply E · (1 + hloss) ÷ (ηpump · ηmotor · ηtransformer). Compare the two and you have round-trip efficiency, which usually lands between 70% and 82%. A full discharge lasts delivered MWh ÷ turbine MW hours. Storage cost: LCOS = (capex × CRF + fixed O&M + charging cost) ÷ annual MWh delivered.
Frequently asked questions
What is the storage capacity of a pumped hydro reservoir?
What round-trip efficiency does pumped hydro reach?
For how many hours can a pumped hydro plant produce power?
What is the capital cost of pumped hydro?
Are batteries or pumped hydro the better store?
How big is pumped hydro within global storage?
Sources & references
- IEA — Hydropower Special Market Report (2021)
- International Hydropower Association — Pumped storage hydropower
- Blakers, A., Stocks, M., Lu, B., Cheng, C. (2021). A review of pumped hydro energy storage. Progress in Energy 3(2)
- Mongird, K. et al. (2020). Energy Storage Grand Challenge Cost and Performance Assessment. PNNL / US DOE