Batteries & storage calculator

Pumped hydro storage calculator for energy, power and efficiency

Reservoir volume, head and machine efficiencies go in. You read off stored MWh, round-trip efficiency, discharge time, drawdown, arbitrage revenue and levelized storage cost.

Editable share link Branded PDF report Free · no sign-up

Results

Stored energy: 2.4 GWh, deliverable at 300 MW for 7.9 hours, with 75.7% round-trip efficiency. That duration suits daily charge-discharge cycling. Head counts as much as volume, since each cubic metre stores 0.95 kWh. Selling the spread alone does not recover the levelized cost (119 against 110 €/MWh), though actual plants also collect capacity and grid-service income.
Energy returned per complete cycle
2.4GWh
3,147 MWh needed to pump it up
Round-trip efficiency
75.7%
generating 87.5% · pumping 86.6%
Discharge time
7.9h
at 300 MW, flow 87 m³/s
Charge time
10.5h
at 300 MW pumping
Gravitational energy (ideal)
2,725MWh
ρ·g·V·H, before losses
Reservoir drawdown
6.3m
1.6% of head; output holds steady below about 15%
Olympic pools
1,000
0.95 kWh per m³ of water
Arbitrage margin / yr
€36,164,992
300 cycles · spread 65 €/MWh
LCOS (incl. charging)
119€/MWh
capital + O&M alone 60 €/MWh
Simple payback
18 yr 11 mo
capex 600 M€
Equivalent battery containers
611
≈3.9 MWh in one utility-scale battery container
Breakdown of the pumping energy
Deliverable energy of your volume at different heads

Existing pumped-storage plants for reference (approximate)

PlantPower (MW)Storage (GWh)Head (m)Hours
Your design3002.384007.9
Dinorwig, UK1,728~9~500~5
Goldisthal, Germany1,060~8.5~300~8
Bath County, USA~3,000~24~380~8–11
Cruachan, UK440~7~365~16
  • Head changes as the reservoirs fill and drain, and this model works with the mean head. A big drawdown relative to head cuts power and efficiency toward the end of discharge.
  • The model ignores evaporation, seepage and environmental-flow limits. Only energy arbitrage counts as revenue, whereas ancillary services (frequency response, inertia, reserve) can often bring in as much again.

Water on a hill as a battery

Think of pumped storage hydropower (PSH) as two lakes at different heights acting like one big rechargeable cell. With spare or cheap power, pumps push water to the top lake. When the grid needs energy, that water runs down through turbines. What is stored is gravitational potential energy, so how much water and how far it falls (the head) count equally.

Give the tool the usable volume, the gross head and the machine ratings. It reports:

  • ideal gravitational energy versus the output left after hydraulic, turbine, generator and transformer losses;
  • pumping energy for a refill, which yields the round-trip efficiency;
  • charge and discharge hours at pump and turbine power, with the flow rate;
  • reservoir drawdown, also as Olympic pools;
  • arbitrage income, simple payback and levelized cost of storage (LCOS), with yearly cycles held to what the hours allow.

Formulas

E_ideal (MWh) = ρ × g × V × H / 3.6×10⁹ E_out = E_ideal × (1 − h_loss) × η_turbine × η_generator × η_transformer E_in = E_ideal × (1 + h_loss) / (η_pump × η_motor × η_transformer) Round-trip efficiency = E_out / E_in Discharge hours = E_out / P_turbine Charge hours = E_in / P_pump LCOS = (Capex × CRF + fixed O&M + cost of charging energy) / annual MWh delivered

Constants and units: ρ = 1,000 kg/m³, g = 9.81 m/s², V in m³, H in m; h_loss means hydraulic loss, as a share of head, applied on the way up and again on the way down.

Example: 300 MW and 8 hours

The preset has 300 MW of reversible machines and an upper basin of 2.5 million m³ usable water (the volume of 1,000 Olympic pools) perched 400 m over the lower basin.

Start with the physics: 1,000 × 9.81 × 2.5×10⁶ × 400 / 3.6×10⁹ ≈ 2,725 MWh ideal. Then apply losses of 3% of head each way, 92% for the turbine, 91% for the pump, 98.5% for the motor-generator and 99.5% for the transformer. The grid receives 2,380 MWh, and 3,150 MWh must be bought to refill, so about 76% comes back. Running flat out the plant discharges for 7.9 hours and pumps for 10.5 hours. Over 40 hectares the water level moves about 6 m, which is minor next to 400 m of head. One cubic metre ends up worth roughly 0.95 kWh at the meter.

Money next: buy at €45/MWh, sell at €110/MWh, 300 cycles a year, and the arbitrage margin comes to about €36 million. With capex at €2,000/kW (€600 million), simple payback is around 19 years. LCOS including charging energy (about €119/MWh) lands a bit above the sale price. That is typical, since real stations also earn capacity payments and grid-service income (reserves, frequency response, inertia, black start) that pure arbitrage ignores.

Interpreting what you see

  • Energy per cycle: capacity you can actually use, measured at the grid connection.
  • Round-trip efficiency: each delivered MWh requires 1/RTE MWh of purchased power. At 76%, the price spread has to exceed about 24% of the selling price before losses are even covered.
  • Duration: this limits the services on offer. Cycling every day needs 4–10 hours, whereas weekly or seasonal shifting needs much more.
  • Drawdown: a large level change relative to head means less head by the end of discharge, so power and efficiency sag.
  • LCOS versus capital-only cost: the gap is the bill for charging energy.

Reference values

Parameter Typical range
Gross head 100–800 m (best 300–700 m)
Round-trip efficiency 70–82%
Discharge duration 6–12 h (some > 20 h)
Unit size 100–400 MW per reversible unit
Capex 1,500–3,500 per kW
Design life 50–100 years
Response time ~1–2 minutes from standstill; seconds when spinning

Three real stations for scale: Bath County in the USA (~3 GW, one of the biggest worldwide), Dinorwig in the UK (~1.7 GW, ~9 GWh, ~500 m head) and Goldisthal in Germany (~1.06 GW, ~8.5 GWh, ~300 m).

Design pointers

  • Prefer height to volume. Double the head and the same dam, tunnel diameter and water store twice the energy, which is why steep sites are much cheaper per MWh.
  • Start from what exists. An existing lake or disused mine pit plus one new basin saves money and eases environmental impact.
  • Treat MW and MWh separately. Turbines decide power, reservoirs decide energy, and more water often costs less than more machines.
  • Variable-speed units regulate power during pumping, which opens extra grid-service revenue.
  • Weigh alternatives in the LCOE calculator and switch units via the energy unit converter.

Model limits

One average head is assumed, yet real head moves as basins fill and drain. Evaporation, seepage, environmental flow duties, ramp limits and outages are left out. Income is arbitrage at a constant spread, and the market, unlike charge and discharge time, does not cap the cycle count, so few plants truly manage a daily full cycle. Tunnels, dams and geology make capex site-specific.

Method & assumptions

Energy held in the upper reservoir is found as MWh = (ρ · g · V · H) ÷ 3.6×10⁹, taking ρ = 1,000 kg/m³ and g = 9.81 m/s² (E in joules). Output on the way down is reduced by head loss and by three machine stages: E · (1 − hloss) · ηturbine · ηgenerator · ηtransformer. On the way up, the grid must supply E · (1 + hloss) ÷ (ηpump · ηmotor · ηtransformer). Compare the two and you have round-trip efficiency, which usually lands between 70% and 82%. A full discharge lasts delivered MWh ÷ turbine MW hours. Storage cost: LCOS = (capex × CRF + fixed O&M + charging cost) ÷ annual MWh delivered.

Frequently asked questions

What is the storage capacity of a pumped hydro reservoir?
Use E = ρ × g × V × H × η. Lift one cubic metre 100 m and you hold 0.27 kWh before losses. At 400 m that rises to about 1.1 kWh, and roughly 0.95 kWh returns as electricity. So 2.5 million m³ at 400 m of head gives around 2.4 GWh each cycle.
What round-trip efficiency does pumped hydro reach?
Recent stations built around reversible pump-turbines reach 70–82%; older ones sit closer to 65–75%. Where does the rest go? Pump plus motor take about 9–12%, turbine plus generator 8–10%, water friction in tunnels and penstocks 2–5% per direction, and transformers a little more.
For how many hours can a pumped hydro plant produce power?
Designs mostly aim at 6–12 hours of full output, and a few exceed 20. Duration equals stored energy divided by turbine power, so one reservoir can serve a short, strong plant or a long, gentler one.
What is the capital cost of pumped hydro?
Budget 1,500–3,500 per kW (EUR or USD) when the plant holds 6–12 hours, or roughly 150–400 per kWh of capacity. For long durations that is well under battery prices per kWh. The catches: you need the right geography and building takes years. Plants are expected to last 50–100 years.
Are batteries or pumped hydro the better store?
Pumped hydro is normally cheaper per kWh for storage of 6+ hours, for very large capacity and for decades of use, and cycling does not wear it out. Batteries are better for 1–4 hour needs, quick response, modular rollout and places without the right terrain.
How big is pumped hydro within global storage?
By energy capacity it remains the dominant form of grid storage, at roughly 180–200 GW of power capacity worldwide. Batteries, though, now add new capacity at a much faster pace.

Sources & references

  1. IEA — Hydropower Special Market Report (2021)
  2. International Hydropower Association — Pumped storage hydropower
  3. Blakers, A., Stocks, M., Lu, B., Cheng, C. (2021). A review of pumped hydro energy storage. Progress in Energy 3(2)
  4. Mongird, K. et al. (2020). Energy Storage Grand Challenge Cost and Performance Assessment. PNNL / US DOE

Embed this calculator

Free for bloggers, installers, schools and NGOs. Copy the snippet below and it stays current by itself.