Results

Annual output is 13.6 GWh from 6 MW, at a capacity factor of 25.9%. You can predict it years in advance, yet it rises and falls with every tide and follows the spring–neap cycle. LCOE ≈ 422 €/MWh.
Annual energy
13.6GWh
3,785 average EU homes
Capacity factor
25.9%
2,271 full-load hours
Installed capacity
6MW
Average power
1.6MW
Rated current speed
3.13m/s
rotor 18 m · Cp 0.42
Average kinetic power density
4.67kW/m²
time-averaged ½ρ|u|³
Operating hours
6,457h/yr
640 h at rated power
LCOE
422€/MWh
capex 45 M€
Project IRR
-7.6%
at 200 €/MWh
Output over two weeks, spring to neap
  • Flow speed is modelled as u = U_peak(t)·sin(2πt/12.42 h). The peak itself moves sinusoidally from your spring value to your neap value across 14.77 days. Turbulence, the vertical velocity profile and any difference between flood and ebb are not included.
  • Enter the current at hub depth rather than at the surface. Wakes and blockage matter in large arrays, but this model treats each turbine on its own.

Free calculator by Energy.com.info