Two technologies, two models
The calculator handles the two quite different routes from tide to electricity.
Tidal range plants (barrages and lagoons) close off a basin at high tide. Once the sea has dropped far enough, the stored water runs through low-head turbines. It is hydropower with the Moon as the pump. The energy on offer grows with basin area and with the square of the tidal range.
Tidal stream machines stand in fast currents, rather like wind turbines under water. Rotor area and the cube of current speed set their output. Because seawater is some 840 times denser than air, an 18 m rotor in a 3 m/s current produces what a 70–80 m wind rotor does in 12 m/s wind. The catch is that strong currents are needed.
A lunar semi-diurnal cycle of 12.42 hours drives the tides, and a 14.77-day spring–neap cycle swells and shrinks them. The model runs one whole year. Barrages are stepped tide by tide and stream turbines every 10 minutes, while range or peak current slides between your spring and neap inputs.
Equations
Tidal stream: P(t) = min(P_rated, ½ × ρ × A_rotor × Cp × |u(t)|³ × η) u(t) = U_peak(t) × sin(2π t / 12.42 h), U_peak varies between spring and neap over 14.77 days
Seawater density ρ is 1,025 kg/m³. Defaults for the extraction factor are 38% (ebb generation), 32% (flood) and 50% (two-way). It stands for turbine efficiency, the head required to start generating and the time spent waiting for it.
Example: four-turbine stream array
Presets: four 1.5 MW turbines, 18 m rotors, in a channel with depth-averaged peak currents of 3.5 m/s at springs and 1.8 m/s at neaps, close to phase one of MeyGen in Scotland’s Pentland Firth.
- Using Cp = 0.42 and a 90% drivetrain, a turbine reaches rated power near 3.1 m/s.
- Generation starts above 1 m/s, about 6,450 hours a year, but full power lasts only some 640 hours, mostly at spring tides.
- Allowing 92% availability, annual output is about 13.6 GWh. That is a capacity factor close to 26% and supplies roughly 3,800 average EU homes.
- At 7,500 €/kW and 3.5% O&M, LCOE is over €400/MWh, twice the assumed €200/MWh support price. This gap explains why tidal stream projects rely on dedicated contracts-for-difference and why cutting cost is the sector’s chief aim.
Loading the La Rance-type barrage preset (22 km², 11 m spring range, 5.5 m neap range, 240 MW, ebb generation) returns about 535 GWh a year. The real plant has delivered roughly 500 GWh over decades, so the model is in the right range.
Making sense of the output
- Tidal plants usually reach a capacity factor of 20–40%, shown next to annual energy.
- For stream sites, a lower rated current speed improves the capacity factor but wastes energy at springs, and developers balance this against cost.
- For barrages, the per-tide chart reveals the spring–neap swing: energy scales with R², so a spring tide can give four times a neap tide.
- A high share of tides limited by capacity means more turbines would harvest more.
Typical values
| Parameter | Tidal stream | Tidal range |
|---|---|---|
| Resource needed | spring peak current > 2.5 m/s | mean range > 5 m |
| Unit size | 0.1–2.5 MW | 10–26 MW bulb turbines |
| Capacity factor | 25–40% | 20–30% |
| Capex | 5,000–12,000 per kW | 3,000–8,000 per kW |
| Example | MeyGen (UK), 6 MW | La Rance (FR) 240 MW; Sihwa (KR) 254 MW |
Practical notes
- Take measurements at hub height. Current slows toward the seabed, so rely on ADCP readings at rotor depth, not surface speed.
- Watch both extremes of the cycle: strong springs paired with weak neaps yield less than the peak current implies.
- A two-way lagoon produces on both flood and ebb, and it can pump at high water to raise the head, so its output is steadier than an ebb-only barrage.
- Tidal output is predictable but arrives in four pulses daily, so it combines well with storage, wind and solar.
Limits of the model
The tide is represented by one sinusoidal constituent with spring–neap modulation. Real tides add diurnal inequality, equinoctial highs and flood/ebb asymmetry that varies by site. Each stream turbine is treated alone, with no wake or channel-blockage effects and no vertical velocity profile. For barrages, an empirical extraction factor replaces a full operating simulation, which limits accuracy to ±20–30%. Impacts on sediment, fish and intertidal habitats lie outside the model, although they are frequently what decides a barrage.
Method & assumptions
For tidal range plants (barrage or lagoon), a basin of area A that fills or empties through range R holds E = ½ ρ g A R² of potential energy, with ρ = 1,025 kg/m³. R varies from tide to tide, between neap and spring values, along a 14.77-day cycle, and a year's 706 tides are summed. An extraction factor converts this into delivered energy, and every tide is capped by installed power × generating hours. For tidal stream turbines, P = ½ ρ A Cp u³ η, held to rated power and set to zero below cut-in. The year is stepped through every 10 minutes using a sinusoidal M2 tide whose amplitude follows the spring–neap cycle. Finally LCOE = discounted costs ÷ discounted MWh.
Frequently asked questions
What formula calculates tidal energy?
What is the output of one tidal stream turbine?
Which current speeds make tidal stream worthwhile?
What does the La Rance tidal station generate?
Is tidal power predictable?
What makes tidal energy costly?
Sources & references
- Ocean Energy Systems (IEA Technology Collaboration Programme) — annual reports
- Charlier, R.H. (2007). Forty candles for the Rance River TPP tides provide renewable and sustainable power generation. Renewable and Sustainable Energy Reviews 11(9)
- Neill, S.P. & Hashemi, M.R. — Fundamentals of Ocean Renewable Energy, Academic Press, 2018
- IRENA — Tidal Energy Technology Brief (2014)