Demand charge (maximum demand)
A line item on commercial and industrial bills that charges for the single highest kW draw recorded in the billing period.
Because grids and power stations are built to meet peaks, many tariffs add a charge for the month's highest 15- or 30-minute average demand, priced per kW, on top of the per-kWh energy charge. For factories and offices this can amount to 20–50% of the bill. Malaysian commercial and industrial tariffs call it the maximum demand (MD) charge.
It can be reduced by staggering motor starts, managing EV charging and peak shaving with batteries. See how to read your electricity bill.
Related terms
All terms →- Time-of-use (ToU) tariff
A power tariff with different prices at set times of day, such as peak and off-peak, meant to move use to the hours when electricity is cheaper to supply.
- Peak load
The highest electricity demand a grid records over a given period; it fixes the capacity the system has to be able to deliver.
- Power vs energy (kW vs kWh)
Power in kW is the flow of energy at one moment, while energy in kWh is power added up over time. Capacity is stated in power, and output in energy.
- Demand response
Changes in end users' electricity use, prompted by price signals or operator requests, that help balance the grid.