Bermuda has 3 tracked facilities that together give 6 MW of utility-scale solar and wind in operation, good for rank #174 of 222 in this atlas.
Solar is the main source: solar parks supply 100% of operating capacity (6 MW), versus 0 MW from wind.
A large pipeline is on the way: 0 MW being built and 130 MW in pre-construction or announced, which equals 2,167% of the fleet operating today.
Roughly 6 MW (100%) of operating capacity began running in 2021 or after, and the peak year was 2021 with 6 MW brought online.
Explore Bermuda on the live map
For Bermuda's electricity mix, carbon intensity and history, head to its energy profile.
Biggest solar and wind farms operating in Bermuda
Map →| Facility | Type | Capacity | Since | Region | Owner |
|---|---|---|---|---|---|
| Airport Finger solar farm | Solar PV | 6 MW | 2021 | — | Saturn Power |
Largest projects in the pipeline
| Project | Type | Status | Capacity | Expected | Region |
|---|---|---|---|---|---|
| Bermuda Offshore Wind Project | Offshore wind | Pre-construction | 120 MW | 2030 | Dockyard |
| Bermuda Floating PV solar project | Solar PV | Announced | 10 MW | — | Castle Habrour, St. David's Island |
Frequently asked questions
Where is the biggest solar farm in Bermuda?
What is the solar capacity of Bermuda?
What is the wind power capacity of Bermuda?
What is the number of solar and wind farms in Bermuda?
Nearby countries
United States 304 GWCanada 21.2 GWGreenland 0 MW