Solar & wind farms in Costa Rica
All the utility-scale solar parks and wind farms in Costa Rica followed by Global Energy Monitor, whether operating, being built or planned.
Solar PVOnshore windOffshore windCSPBuilding / planned
Costa Rica has 35 tracked facilities that together give 451 MW of utility-scale solar and wind in operation, good for rank #82 of 222 in this atlas.
Wind is ahead with 429 MW (95% of operating capacity), and solar parks contribute another 22 MW.
A large pipeline is on the way: 0 MW being built and 352 MW in pre-construction or announced, which equals 78% of the fleet operating today.
Roughly 44 MW (10%) of operating capacity began running in 2021 or after, and the peak year was 2015 with 71 MW brought online.
Most of them are in Guanacaste (416 MW), San José (15 MW), Cartago (13 MW).
Explore Costa Rica on the live map
For Costa Rica's electricity mix, carbon intensity and history, head to its energy profile.
Capacity brought online each year
Operating facilities grouped by the year they first started (MW). Projects whose start year is unknown are left out.
Biggest solar and wind farms operating in Costa Rica
Map →| Facility | Type | Capacity | Since | Region | Owner |
|---|---|---|---|---|---|
| Chiripa wind farm | Onshore wind | 50 MW | 2014 | Guanacaste | Acciona Energía SAU |
| Guanacaste wind farm | Onshore wind | 50 MW | 2010 | Mogote, Guanacaste | Grupo Argos SA |
| Orosi wind farm | Onshore wind | 50 MW | 2015 | Mayorga, Guanacaste | Corporación Multi Inversiones (CMI) |
| El Quijote wind farm | Onshore wind | 34 MW | 2025 | Guayabo, Guanacaste | Inversiones Eólicas de Costa Rica SA |
| Molinos Viento Del Arenal wind farm | Onshore wind | 24 MW | 1997 | Guanacaste | Molinos de Viento del Arenal SA |
| Tilaran wind farm | Onshore wind | 23 MW | 1996 | Santa Rosa, Guanacaste | Corporación Multi Inversiones (CMI) |
| Cacao wind farm | Onshore wind | 21 MW | 2019 | Guanacaste | Coopeguanacaste RL |
| Tilawind wind farm | Onshore wind | 21 MW | 2015 | Cañas, Guanacaste | MPC Capital |
| Altamira wind farm (Costa Rica) | Onshore wind | 20 MW | — | Tilaran, Guanacaste | Corporación Multi Inversiones (CMI) |
| Campos Azules wind farm | Onshore wind | 20 MW | — | Tilaran, Guanacaste | Corporación Multi Inversiones (CMI) |
| Mogote wind farm | Onshore wind | 20 MW | — | La Fortuna, Guanacaste | Hunt Energy Horizons LLC |
| Vientos De La Perla wind farm | Onshore wind | 20 MW | — | Tilaran, Guanacaste | Corporación Multi Inversiones (CMI) |
| Vientos Del Miramar wind farm | Onshore wind | 20 MW | — | Tilaran, Guanacaste | Corporación Multi Inversiones (CMI) |
| Valle Central wind farm | Onshore wind | 15 MW | 2012 | San José | Constructora MECO |
| Los Santos wind farm | Onshore wind | 13 MW | 2011 | Cartago | Coopesantos RL |
| Vientos Del Este wind farm | Onshore wind | 12 MW | 2016 | Tilarán, Guanacaste | Grupo Ecoenergia |
| Rio Naranjo wind farm | Onshore wind | 9 MW | 2019 | Guanacaste | Coopeguanacaste RL |
| Buenos Aires de Pocosol solar project | Solar PV | 7.1 MW | 2019 | Alajuela | — |
| Aeroenergía wind farm | Onshore wind | 6.8 MW | 1998 | Santa Rosa, Guanacaste | — |
| Cabo Velas Cantón De Santa Cruz solar project | Solar PV | 5.8 MW | 2022 | Cabo Velas, Guanacaste | — |
| Valle Escondido CR solar project | Solar PV | 4 MW | 2021 | Guanacaste | — |
| Cantón De Carrillo solar project | Solar PV | 3.2 MW | 2017 | Guanacaste | — |
| Cantón De Bagaces solar project | Solar PV | 1.7 MW | 2017 | Guanacaste | — |
Largest projects in the pipeline
| Project | Type | Status | Capacity | Expected | Region |
|---|---|---|---|---|---|
| Las Delicias solar farm | Solar PV | Announced | 78 MW | — | Puntarenas |
| ICE Colorado solar farm | Solar PV | Announced | 66 MW | 2027 | Colorado de Abangares, Guanacaste |
| Tejona wind farm | Onshore wind | Announced | 42 MW | 2002 | Santa Rosa, Guanacaste |
| Las Cañas solar farm | Solar PV | Announced | 20 MW | 2026 | Liberia, Guanacaste |
| Los Tecales solar farm | Solar PV | Announced | 20 MW | 2026 | Abangares, Guanacaste |
| Numu solar farm | Solar PV | Announced | 20 MW | 2026 | Carrillo, Guanacaste |
| La Montosa wind farm | Onshore wind | Pre-construction | 20 MW | 2027 | Guanacaste |
| Las Pavas wind farm | Onshore wind | Pre-construction | 20 MW | 2027 | Guanacaste |
| Movasa II wind farm | Onshore wind | Pre-construction | 20 MW | 2027 | Guanacaste |
| San Jorge (Costa Rica) wind farm | Onshore wind | Pre-construction | 20 MW | 2027 | Guanacaste |
| Energova Colorado solar farm | Solar PV | Announced | 16 MW | 2026 | Nandayure, Guanacaste |
| Los Mangos solar farm | Solar PV | Announced | 10 MW | 2026 | Carrillo, Guanacaste |
Top regions (operating)
Frequently asked questions
Where is the biggest solar farm in Costa Rica?
Where is the biggest wind farm in Costa Rica?
What is the solar capacity of Costa Rica?
What is the wind power capacity of Costa Rica?
What is the number of solar and wind farms in Costa Rica?
Nearby countries
Brazil 58.2 GWMexico 21.2 GWChile 19.1 GWArgentina 6.8 GWColombia 2.5 GWPeru 2.1 GWUruguay 1.9 GWDominican Republic 1.8 GWPanama 1 GWHonduras 936 MW