Glossary · Nuclear

Reprocessing (spent fuel)

Recovering uranium and plutonium from used nuclear fuel by chemical separation for reuse, with less high-level waste left over.

The common PUREX process starts by dissolving the used fuel in nitric acid, then solvents draw off uranium and plutonium. France's La Hague facility is the biggest, rated at about 1,700 tonnes a year. Russia, India and the UK (Sellafield, until 2022) reprocess too. Japan's Rokkasho plant, by contrast, has seen decades of delay.

The benefits are less high-level waste by volume and reuse of some 96% of what is in spent fuel. The drawbacks are cost and the separation of plutonium, which carries security risks. No commercial fuel has been reprocessed in the United States since the 1970s. Further reading: nuclear waste facts.

Related terms

All terms →
  • MOX fuel

    Nuclear fuel of mixed oxides: plutonium extracted by reprocessing, blended with depleted or natural uranium.

  • Spent nuclear fuel

    Fuel assemblies taken out of a reactor after use. They are intensely radioactive and hot, and hold uranium, plutonium, fission products and minor actinides.

  • High-level radioactive waste

    Used nuclear fuel plus the intensely radioactive by-products of reprocessing; roughly 3% of nuclear waste by volume, yet about 95% of its radioactivity.

  • Deep geological repository

    Purpose-built deep storage, often 300–700 m underground in stable rock or clay, meant to keep high-level radioactive waste out of the environment for hundreds of thousands of years.