Glossary · Nuclear

Thorium fuel cycle

Nuclear fuel cycle based on thorium-232, a fertile material that absorbs a neutron and becomes fissile uranium-233; it is the alternative to uranium and plutonium fuel.

About three to four times as much thorium as uranium exists in the Earth's crust, chiefly as Th-232 in monazite sands. India, Brazil, Australia, Türkiye and the United States have the largest resources. Because Th-232 cannot fission by itself, it has to be bred first:

Th-232 + n → Th-233 →(β, 22 min) Pa-233 →(β, 27 days) U-233

For every thermal neutron it absorbs, U-233 releases about 2.3 neutrons, ahead of U-235 and Pu-239, so even thermal reactors can breed. A starting charge of fissile material (LEU or plutonium) is needed to get the cycle going.

The case in favour: far less plutonium and minor actinide production, thorium dioxide fuel with a high melting point and good chemical stability, and the prospect of high burnup. The case against: U-232 contamination creates strong gamma emitters that make fabricating fuel harder; Pa-233 must be handled to avoid neutron losses; the reprocessing route (the THOREX process) is less advanced; and separated U-233 could serve in weapons.

Experience so far includes the Shippingport reactor's light-water breeder core (1977–1982), high-temperature reactors in Germany and the US, and the Molten-Salt Reactor Experiment at Oak Ridge (1965–1969). In India, a three-stage programme plans to use thorium in the Advanced Heavy Water Reactor. China put a 2 MWth thorium molten salt reactor into operation at Wuwei in 2023, and in 2025 it was reported to have been refuelled while running.

Related terms

All terms →
  • Nuclear fission

    A heavy nucleus, such as uranium-235 or plutonium-239, absorbs a neutron and breaks into lighter nuclei, giving off about 200 MeV and more neutrons.

  • Uranium enrichment

    Lifting the fraction of fissile U-235 in uranium from the natural 0.711% to a level suitable for reactor fuel, or at the extreme end, for weapons.

  • Burnup

    Thermal energy taken out of nuclear fuel for each unit of initial heavy-metal mass, typically given as gigawatt-days per tonne (GWd/tHM).

  • Spent nuclear fuel

    Fuel assemblies taken out of a reactor after use. They are intensely radioactive and hot, and hold uranium, plutonium, fission products and minor actinides.

  • SMR (Small Modular Reactor)

    A nuclear reactor of up to roughly 300 MWe per module, built in a factory and deployed in modules to shorten construction and reduce financing risk.