As machines, finished reactors are mature and very dependable. The obstacles lie elsewhere: capital, construction risk, waste politics and fear of accidents.
| Snapshot | Figure |
|---|---|
| Output in 2025 | roughly 2,800 TWh, nearly 9% of global electricity |
| Rank among low-carbon sources | second, behind only hydropower |
| Biggest producers | United States, China, France: well over half combined |
| Operable units (IAEA Power Reactor Information System) | roughly 410–440, around 375–400 GWe net, depending on how mothballed Japanese reactors are counted |
How a reactor works
Take a steam power station and swap the boiler for a reactor core. That is the whole idea.
| Step | Process |
|---|---|
| Fission | A uranium-235 nucleus (or plutonium-239, formed as fuel burns) absorbs a slow neutron and splits. This is nuclear fission. |
| Energy | Each split releases about 200 MeV, mostly as kinetic energy of the fragments, which turns into heat in the fuel; two or three more neutrons are freed. |
| Moderation | A moderator (ordinary water, heavy water or graphite) slows the neutrons so the chain reaction can go on. |
| Control | Control rods and boron dissolved in the coolant absorb the excess and keep the reactor exactly critical. |
| Power | Coolant carries heat to a steam supply, the turbine spins, and a condenser passes the leftover heat to a river, the sea or a cooling tower. |
Because light-water reactors produce steam at just 280–330 °C, their thermal efficiency trails modern coal or gas plants:
Example: a 3,400 MWth PWR delivering 1,150 MWe net → η = 1,150 / 3,400 ≈ 34%
Equivalent heat rate = 3,412 Btu/kWh ÷ η ≈ 10,000 Btu/kWh
Nuclear stands out on fuel density: about 4 million MJ per kilogram from low-enriched uranium burned to 50 GWd/t, against 25–30 MJ per kilogram for hard coal. Swap in other fuels and rerun the numbers with the fuel energy content calculator.
Fuel cycle
| Stage | What happens |
|---|---|
| Mining | Natural uranium holds 0.7% U-235 |
| Milling, conversion, enrichment | Conversion to UF₆, then gas centrifuges enrich it to 3–5% for most reactors; some advanced designs need HALEU at up to 20% |
| Fabrication and irradiation | Fuel stays 4–6 years in the core and reaches a burnup of about 45–60 GWd/t |
| After use | The spent fuel goes to storage. France, Russia and Japan recover plutonium from part of it for MOX fuel; the US and most others use a once-through cycle |
Reactor types
| Reactor type | Moderator / coolant | Share of world fleet (approx.) | Typical net efficiency | Examples |
|---|---|---|---|---|
| PWR (incl. Russian VVER) | Light water / pressurised light water | ~70% | 33–37% | Vogtle, Flamanville, Barakah (APR-1400) |
| BWR | Light water / boiling light water | ~15% | 33–34% | Japan, US, Sweden, Finland |
| PHWR (CANDU) | Heavy water / heavy water | ~10% | ~30–33% | Canada, India, Romania |
| AGR | Graphite / CO₂ gas | small, retiring | ~40% | UK |
| RBMK / LWGR | Graphite / boiling light water | small | ~31% | Russia (Leningrad, Kursk, Smolensk) |
| Fast reactors | None / liquid sodium | very small | ~40% | BN-600, BN-800 (Russia) |
| Type | Key points |
|---|---|
| PWR | Primary loop at about 15.5 MPa, so the water never boils; steam generators hand the heat to a separate secondary circuit. Naval propulsion gave it a head start and the longest licensing record. |
| BWR | Simpler layout: water boils in the core and steam goes directly to the turbine. |
| CANDU-type PHWR | Heavy-water moderation allows natural uranium fuel and refuelling at full power, the reason Canada, India and Romania (Cernavodă) adopted it. |
| AGR | CO₂ coolant delivers hotter steam in the UK, but cracking graphite will close the fleet in the late 2020s. |
| RBMK | Chernobyl’s design has a positive void coefficient at low power. Modifications after 1986 reduced it; Russia is retiring the remaining units. |
| Fast reactor | Runs without a moderator and can breed plutonium from U-238, extracting much more energy from uranium. Russia’s BN-800 is the largest operating; China is erecting CFR-600 units. |
SMRs: factory-built units
SMRs are reactors up to about 300 MWe. Instead of a few mega-projects built on site, the plan is many repeated units made in a factory.
| Unit | Status |
|---|---|
| Akademik Lomonosov (Russia, floating, 2 × 35 MWe) | operating since 2020 |
| HTR-PM (China, high-temperature gas-cooled demonstrator) | commercial since late 2023 |
| BWRX-300 at Darlington, Ontario | under construction |
| ACP100 (Linglong One, China) | under construction |
| NuScale-UAMPS (Idaho) | dropped in 2023: estimated power price rose to about $89/MWh even after subsidies |
The Idaho case shows that small does not guarantee cheap.
Capacity factor and efficiency
Only a third of the heat becomes electricity, but reactors seldom stop. Refuelling takes a few weeks every 18–24 months.
| Item | Figure |
|---|---|
| US fleet capacity factor (EIA) | about 90–93% every year for twenty years, best of any technology |
| Global mean | nearer 80% |
| France | runs its fleet in load-following mode on purpose; a 2022 stress-corrosion crisis drove output to a 30-year low |
| Capacity uprates | 5–20% more output at many plants |
Compare with wind and solar using the capacity factor calculator.
Cost
The cost of nuclear power is mostly capital and financing. Fuel is only about 10–20% of generation cost, so uranium price jumps hardly matter. Estimates vary widely:
| Source | Estimate |
|---|---|
| IEA/NEA Projected Costs 2020 | median LCOE for new reactors about $69/MWh at 7% discount rate, rising steeply at 10% and falling to roughly $40/MWh at 3%; refurbished existing reactors running longer cost about $30–50/MWh, among the cheapest low-carbon options |
| Lazard LCOE+ 2024 (US, unsubsidised) | $142–222/MWh, reflecting Vogtle’s actual cost |
| NREL ATB and EIA AEO | in the middle, with overnight costs of roughly $7,000–9,000/kW for large US units |
Construction-site history explains the gap. Major recent projects:
| Project | Reactor | Construction start → operation | Cost outcome |
|---|---|---|---|
| Vogtle 3 & 4 (US) | AP1000 ×2 | 2013 → 2023/2024 | Initially ~$14bn; final over $30bn incl. financing |
| Flamanville 3 (France) | EPR | 2007 → grid 2024 | Budget €3.3bn; EDF estimate ~€13bn, more with financing |
| Olkiluoto 3 (Finland) | EPR | 2005 → 2023 | Roughly 14 years late, ~3× original price |
| Hinkley Point C (UK) | EPR ×2 | 2018 (first nuclear concrete) → ~2030+ | EDF estimates £31–35bn (2015 prices) |
| Barakah 1–4 (UAE) | APR-1400 ×4 | 2012 → 2021–2024 | ~5.6 GW built in about 8–12 years, roughly to plan |
| Shin Kori / Saeul (Korea) | APR-1400 | ~5–8 years per unit | Among the lowest overnight costs in OECD |
Four conditions keep costs down: building without pause, a single standard design, an experienced supplier network and a regulator who is predictable. Korea and China met all four, and France did in the 1980s. Countries that resume after decades without a reactor start have none of them. Because capital is tied up long before revenue, the LCOE swings with the discount rate and WACC. The LCOE calculator shows how far.
Footprint, cooling and spent fuel
| Topic | Details |
|---|---|
| Land | often below 1 km² per gigawatt at the site, a little more with mining and exclusion zones; no major source takes less |
| Water, cooling towers | roughly 600–800 US gallons consumed per MWh (NREL survey, Macknick et al., 2012), above coal or gas because efficiency is lower |
| Water, once-through | tens of thousands of gallons per MWh withdrawn, nearly all returned slightly warmer |
| Heatwaves | river-cooled plants in France and elsewhere have throttled down to meet discharge temperature limits |
| Materials | small per MWh over 60–80 years, despite plenty of concrete and steel |
| Spent fuel | about 20–30 tonnes per gigawatt-year, kept in pools and later dry casks |
Water, not land, is the tighter constraint. The US Department of Energy offers a picture: stack all commercial spent fuel the US has made since the 1950s on one football field and the pile stays under 10 yards high. Deep disposal is furthest along at Onkalo, by Olkiluoto in Finland, with Sweden’s Forsmark and France’s Cigéo behind it.
Carbon footprint over the lifecycle
Operation itself emits no CO₂. What counts are lifecycle emissions from four sources: mining, enrichment (centrifuges today, far less energy-hungry than gaseous diffusion), construction and dismantling.
| Source | Result |
|---|---|
| IPCC AR5 WGIII Annex III (2014) | median 12 gCO2e/kWh (range 3.7–110) |
| UNECE 2021, European PWR | 5.1–6.4 gCO2e/kWh, lowest of any option covered |
The range for onshore wind power is similar. Solar power comes out higher, and coal roughly 50 to 100 times higher.
Accidents and health effects
| Study | Deaths per TWh |
|---|---|
| Markandya & Wilkinson (Lancet, 2007), European nuclear, workers and public | about 0.07 |
| Updated Our World in Data synthesis, Chernobyl and Fukushima included | about 0.03 |
| Coal, oil, gas (same synthesis, mostly air pollution) | roughly 24.6, 18.4, 2.8 |
Per unit of electricity, then, nuclear sits among the safest sources. Two accidents nevertheless shape the debate.
| Accident | What happened |
|---|---|
| Chernobyl (1986) | An RBMK reactor and a badly run test. The explosion and acute radiation syndrome killed about 30 workers and firefighters. WHO and UNSCEAR projected as many as about 4,000 eventual cancer deaths among the most exposed groups; higher figures from linear no-threshold extrapolation remain disputed. Contaminated milk caused thousands of thyroid cancers in children, almost all treatable. |
| Fukushima Daiichi (2011) | The tsunami cut backup power and three BWR cores melted. Japan has tied one worker’s death to radiation, while over 2,000 elderly and ill residents died in connection with the evacuation. A poorly judged emergency response may do more harm than the radiation itself. |
Stress tests, portable backup equipment, filtered venting and flood defences were added across fleets. Passive cooling and core catchers feature in the newer Generation III+ models: AP1000, EPR, APR-1400, VVER-1200 and Hualong One.
Outlook
| Trend | Detail |
|---|---|
| Decline | about 17% of world electricity in the late 1990s, under 9% now; Germany closed its last reactors in 2023 and economics retired many older Western units |
| China | about 30 reactors under construction, more than the rest of the world together, built in about 5–7 years |
| Pledges | more than 20 countries at COP28 committed to triple nuclear capacity by 2050 |
| Extensions and new units | the US, Japan, the Netherlands, Sweden, Poland and Belgium |
| Demand | data-centre firms have signed long-term power purchase deals for existing reactors and future SMRs |
Obstacles remain in three areas: price and schedules outside China, Korea and Russia, HALEU supply for advanced designs, and waste repositories, unresolved except in Finland and Sweden. Firm, dispatchable low-carbon capacity is what a clean grid still needs beside variable renewables, and nuclear is one way to supply it. How much it is worth in a given place depends on what else is available, such as battery storage, interconnectors and hydro. Side-by-side trade-offs live on the technology comparison page. For reactor locations, open the power plant map.
Frequently asked questions
How does a nuclear power station make electricity?
Which capacity factor do nuclear reactors reach?
Why is building a new reactor so costly?
How much CO2 does nuclear power cause over its lifetime?
How safe is nuclear power compared with other sources?
What happens to spent nuclear fuel?
What is a small modular reactor?
Sources & references
- IAEA PRIS — Power Reactor Information System
- IEA/NEA — Projected Costs of Generating Electricity 2020
- Lazard — Levelized Cost of Energy+ (2024)
- UNECE (2021) — Life Cycle Assessment of Electricity Generation Options
- Our World in Data — What are the safest and cleanest sources of energy?
- EIA Electric Power Monthly — Capacity factors for utility-scale generators
- Electricity statistics by Ember and the Energy Institute, supplied through Our World in Data and used for this page's charts and tables