Under-frequency load shedding (UFLS)
Automatic cut-off of blocks of consumers when grid frequency falls past preset thresholds, intended to stop a full system collapse.
Under-frequency load shedding (UFLS) relays act as the final safeguard. In Continental Europe the first step trips at 49.0 Hz, and further steps bring the total to about 45% of load by 48.0 Hz. Great Britain's scheme starts at 48.8 Hz. On the 60 Hz Texas grid, ERCOT's begins at 59.3 Hz.
A real case: on 9 August 2019 lightning hit a line in Britain, a wind farm and a gas plant then dropped out, and frequency sank to 48.8 Hz. About 1 million customers lost supply for less than an hour while the system itself stayed up. Related: blackout.
Related terms
All terms →- Grid frequency
How many times per second alternating current reverses on a power system, 50 Hz or 60 Hz; it mirrors the moment-to-moment balance between supply and demand.
- Rate of change of frequency (RoCoF)
The speed, in hertz per second, at which grid frequency climbs or drops after a sudden imbalance; the less system inertia, the faster it moves.
- Blackout
Total loss of electricity across an area, from one neighbourhood up to a whole country, frequently following a chain of failures.
- Frequency containment reserve (FCR)
Europe's quickest automatic balancing reserve, which reacts within seconds so that a frequency deviation stops growing.