A solar farm front-loads almost its whole budget and then draws on free sunshine for three decades. A gas turbine plant costs less to build yet pays for fuel every running hour. A nuclear unit needs ten years of construction and then operates for six decades. Putting such different profiles on one scale is the job of the levelised cost of electricity (LCOE), the lifetime average cost of one unit of energy, with later money discounted to present value. Read on for the formula, two calculations, the inputs that swing the result most, and what the figure leaves unsaid.

The idea behind the number

Put it as a question: which flat price per MWh, received every year, would exactly repay all of a plant’s costs plus the return its investors demand? That price is the LCOE. Selling above it beats the required return, and selling under it loses money.

Quote it in €/MWh, $/MWh or c/kWh, where 1 €/MWh = 0.1 c/kWh. Unsure about the units? Begin with kW vs kWh.

Formula

LCOE = Σ [ (I_t + O&M_t + F_t) / (1 + r)^t ] / Σ [ E_t / (1 + r)^t ] I_t = investment (capital) spent in year t O&M_t = operation & maintenance cost in year t F_t = fuel (and carbon) cost in year t E_t = electricity generated in year t (MWh) r = discount rate (real or nominal, consistently) t = year, 0 … N (lifetime)

Note that the denominator is discounted too: future energy is weighted down just like future cost. Nothing physical happens to a MWh over time; the weighting simply results from asking that a constant price, multiplied by discounted energy, matches discounted cost.

Shortcut with a capital recovery factor

When money goes out at the start and output and O&M barely change, the sums reduce to an annuity:

CRF = r × (1 + r)^N / ((1 + r)^N − 1) LCOE ≈ (CAPEX × CRF + fixed O&M) / annual MWh + variable O&M + fuel cost per MWh fuel cost per MWh = fuel price per MWh_thermal / efficiency (+ CO₂ price × emission factor)

In effect the CRF is a mortgage payment: the level annual amount that clears a lump sum plus interest within N years. At 25 years it equals about 0.0782 for 6% and 0.0937 for 8%.

Example 1: a solar farm

A 100 MWac plant in southern Europe:

Input Value
Installed cost (CAPEX) €70 million (€700/kW)
Fixed O&M €1.2 million per year (€12/kW-yr)
Capacity factor 20% (AC)
Annual energy 100 MW × 8,760 h × 0.20 = 175,200 MWh
Lifetime 25 years
Real discount rate 6% (CRF 0.0782)
Annual capital charge = 70,000,000 × 0.0782 ≈ €5.47 million Total annual cost = 5.47 + 1.20 = €6.67 million LCOE ≈ 6,670,000 / 175,200 ≈ €38/MWh (3.8 c/kWh)

Panel degradation of about 0.4% a year is ignored, so the result is slightly low; modelling every year would add roughly 1–2 €/MWh. Recent IRENA and Lazard reports give utility PV at good sites a range that contains this number.

Now vary one input at a time:

Change New LCOE Effect
Discount rate 6% → 9% (CRF 0.1018) ≈ €48/MWh +26%
Capacity factor 20% → 12% (northern Europe) ≈ €63/MWh +67%
CAPEX €700 → €500/kW ≈ €29/MWh −24%
Lifetime 25 → 35 years ≈ €34/MWh −11%

Equipment price differences of a few percent count for little next to capacity factor and financing cost when a technology is capital-heavy (capacity factor explained).

Example 2: a gas plant

A 500 MW combined-cycle unit (CCGT):

Input Value
CAPEX €450 million (€900/kW)
Fixed O&M €10 million/yr
Variable O&M €3/MWh
Efficiency 58% (LHV)
Capacity factor 55% → 2.41 TWh/yr
Lifetime / discount rate 30 years / 6% (CRF 0.0726)
Gas price €35/MWh thermal
CO₂ price €70/t, emissions ≈ 0.35 t/MWh electric
Capital + fixed O&M = (450 × 0.0726 + 10) M€ / 2,409,000 MWh ≈ €17.7/MWh Fuel = 35 / 0.58 ≈ €60.3/MWh CO₂ = 70 × 0.35 ≈ €24.5/MWh LCOE ≈ 17.7 + 3 + 60.3 + 24.5 ≈ €106/MWh

Fuel and carbon are about 80% of the total. If gas rises to €70/MWh, a level seen for long stretches of 2022 in Europe, LCOE climbs to about €166/MWh; doubling the discount rate changes little. That contrast sits at the heart of any renewables-against-fossil debate, with interest rates the risk for one and fuel markets the risk for the other, and it explains why electricity prices spike when gas does.

To rerun either case with other inputs, use the LCOE calculator.

Ranges by technology

Published ranges are wide, since inputs differ so much between countries. The table below shows how costs are structured, not exact values; for current figures in your currency consult the latest IRENA, Lazard or NREL edition.

Technology Main cost driver Sensitivity to interest rates Sensitivity to fuel price
Utility solar PV CAPEX, capacity factor High None
Onshore wind CAPEX, wind speed High None
Offshore wind CAPEX, O&M at sea Very high None
Hydro (new) Civil works, site Very high None
Nuclear (new) CAPEX, construction time Extreme Low
Combined-cycle gas Fuel, CO₂ price Low Very high
Coal Fuel, CO₂ price Medium High
Rooftop solar Installation labour, permits High None

Look at the trend rather than the decimals. IRENA’s Renewable Power Generation Costs in 2023 reports that newly commissioned utility-scale solar PV cost about 90% less on a global weighted-average LCOE basis in 2023 than in 2010, and that most of that year’s new solar and onshore wind was cheaper than fossil alternatives. In the US, Lazard’s yearly LCOE+ shows the same pattern: new nuclear and gas peakers at the expensive end, unsubsidised utility solar and onshore wind at the cheap one. After a steep fall during the 2010s, offshore wind became dearer again in 2022–2024 because of higher interest rates and supply-chain inflation (see offshore wind explained).

Which discount rate?

Nothing in the model sparks more debate, and the choice alone can reorder a ranking.

Concept Meaning and typical values
Real vs nominal Real rates exclude inflation and go with constant-money costs; nominal rates include it and go with escalating costs. Mixing the two is a classic mistake
WACC The blend of debt interest and equity return a commercial project must earn. Often about 4–8% real for renewables in OECD countries, around double in emerging economies; the IEA keeps naming financing cost as the top obstacle to cheap clean power in developing countries
Social rate 3–5% in some public studies, reflecting society’s time preference. The IEA/NEA Projected Costs of Generating Electricity 2020 reports 3%, 7% and 10% because the answer changes with the choice

Always print the rate beside the LCOE, and run at least two values.

Blind spots

LCOE stops at the plant boundary. Five system-level matters sit outside it:

Blind spot Why it matters
Timing and value A MWh at 7 pm on a winter evening beats one at 1 pm on a sunny Sunday in May. As solar fills the midday hours, the price it captures drops (cannibalisation). The IEA’s value-adjusted LCOE (VALCOE) adds energy, capacity and flexibility value
Integration High shares of variable renewables need balancing, reserves, storage or interconnection; dispatchable plants need less. A system cost, not a single-plant cost
Grid Some studies include transmission to remote wind and solar zones or offshore export cables; others do not
Externalities Air pollution and climate damage count only if a carbon price is added, and €70/t may still be under estimates of the social cost of carbon
Risk Fuel price swings, construction overruns and policy changes are only partly reflected in the discount rate

Batteries are judged by the levelised cost of storage (LCOS): total lifetime cost over the energy actually discharged, which means charging cost and round-trip losses belong in the numerator (home battery storage guide).

Applying it at home

Rooftop systems obey the same arithmetic: spread price and upkeep over lifetime output, discount, and set the result against the tariff you avoid and the export rate you get. For a 6 kWp system costing €6,600 and producing 7,300 kWh per year over 25 years at a 4% discount rate (CRF ≈ 0.064) with €60/yr maintenance: (6,600 × 0.064 + 60) / 7,300 ≈ €0.066/kWh. Against a €0.25/kWh retail price that is cheap; against a €0.06/kWh export rate it is not, so self-consumption drives payback. The solar panel calculator and net metering calculator model it year by year, and our country profiles and rankings show how nations’ generation mixes compare.

Calculators related to this topic

Frequently asked questions

What is LCOE?
The levelised cost of electricity (also written levelized cost of energy) is the flat price per MWh or kWh that lets a power plant pay back every cost it will ever have, from construction and financing through fuel, operation, maintenance and decommissioning, while earning the return its investors require.
Which technology is cheapest by LCOE?
Across most regions, the latest IRENA and Lazard editions find that unsubsidised new utility-scale solar PV, and onshore wind at good sites, come out cheapest and typically beat new fossil plants. Local resources, fuel and carbon prices and the cost of capital all shift the order, so there is no single worldwide ranking.
Why is the discount rate so influential?
It stands for the price of borrowed money. Solar, wind, nuclear and hydro spend nearly everything at the start, so higher interest raises their LCOE steeply. A gas plant pays most of its costs over time as fuel, which makes it less exposed to interest and more exposed to the gas price.
Is LCOE what I pay per kWh at home?
No. A retail tariff adds network charges, taxes, levies, supplier costs and margins, and it follows a wholesale price set by the costliest plant running in each hour. Generation often makes up just a third to a half of what a European household pays.
What is the LCOE of rooftop solar?
Usually higher per kWh than a utility solar farm, as small systems lose economies of scale. In sunny regions with installed costs near €1,000–1,500 per kWp, expect about €0.05–0.12/kWh; northern Europe is higher. Even so, that often sits below the retail price, hence the payoff from using your own output.
What is missing from LCOE?
It says nothing about when power is generated or what it is worth at that moment, the backup and storage that variable sources need, grid connection and transmission beyond the plant, or balancing effects. LCOS (for storage), system LCOE and the IEA's value-adjusted LCOE (VALCOE) were designed to cover these gaps.
How can I compute LCOE for my own project?
Collect installed cost, yearly operating cost, fuel cost if any, annual output, degradation, lifetime and a discount rate. Our LCOE calculator accepts those inputs and returns a cost per kWh broken into capital, O&M and fuel.

Sources & references

  1. IRENA — Renewable Power Generation Costs (annual report series)
  2. Lazard — Levelized Cost of Energy+ (annual)
  3. NREL — Annual Technology Baseline, LCOE definitions and data
  4. IEA & NEA (2020). Projected Costs of Generating Electricity 2020
  5. Short, W., Packey, D. & Holt, T. (1995). A Manual for the Economic Evaluation of Energy Efficiency and Renewable Energy Technologies. NREL/TP-462-5173