A lifetime price for any power plant
Whatever the technology, the calculator returns the average price per MWh a plant has to earn to break even over its life. The tool ships with 11 presets: utility and rooftop solar, onshore and offshore wind, gas combined cycle and peaker, coal, nuclear, hydro, geothermal and biomass. Overwrite any input to describe your own project.
Your real WACC brings costs and energy back to present value alike. A MWh generated in year 20 is therefore worth less than one generated in year 1, in the same way money spent in year 20 weighs less than money spent on construction. Five components are levelized separately and then added together:
| Component | Covers |
|---|---|
| Capital recovery | capex, interest during construction, optional decommissioning |
| Fixed O&M | yearly upkeep independent of output |
| Variable O&M | upkeep that scales with generation |
| Fuel | heat rate times fuel price |
| Carbon | emissions times carbon price |
| One chart ranks the inputs by how strongly they move the answer; a second sets all 11 technologies side by side at your carbon price. |
Formula
Capital = capex × IDC ÷ Σ [8.76 × CF × (1 − d)^(t−1) / (1 + r)^t] (per kW, MWh per kW-year) Fuel = heat rate (GJ/MWh) × fuel price (per GJ) Carbon = heat rate × fuel CO₂ factor (t/GJ) × carbon price IDC = average of (1 + r)^(k − 0.5) over the construction years k
If you ignore degradation and the build period, capital simplifies to the well-known capex × CRF ÷ (8.76 × CF). CRF here means the capital recovery factor, r(1+r)ⁿ / ((1+r)ⁿ − 1).
Worked example: a solar farm
The preset mirrors a typical 2024 utility-scale solar plant.
| Input | Value |
|---|---|
| Overnight capex | 750 per kW |
| Fixed O&M | 12 per kW-year |
| Capacity factor | 18% (1,577 kWh per kW a year) |
| Life | 30 years |
| Degradation | 0.5% a year |
| Construction | 1 year |
| Real WACC | 6% |
| Step | Value |
|---|---|
| Capital recovery factor (30 years, 6%) | 7.26% a year |
| Interest during construction (half a year at 6%) | +3.0% on capex |
| Capital cost | ≈ 37.4 per MWh, 82% of the total |
| Fixed O&M | ≈ 8.0 per MWh |
| LCOE | ≈ 45.4 per MWh (4.5 cents per kWh) |
That sits close to IRENA’s 2023 global solar average of 44 USD/MWh.
Load the gas CCGT preset instead and the proportions flip: capital drops to ~20 per MWh, while fuel at 8 per GJ adds ~53 and carbon at 70 per tonne another ~26.
Using the result
- LCOE is a break-even in real terms. Weigh it against the revenue the plant can really get, which for solar and wind means the capture price; where renewables are plentiful, that is often 10–40% under baseload averages.
- The breakdown shows where to push. Capital-heavy plants gain from cheaper finance, fuel-heavy ones depend on fuel and carbon prices.
- The sensitivity chart moves each input by ±20% and displays the effect.
Typical inputs, 2023–2024 (USD-like money)
| Technology | Capex per kW | Fixed O&M per kW-year | Capacity factor | Life (years) | LCOE per MWh |
|---|---|---|---|---|---|
| Utility-scale solar PV | 600–1,000 | 8–17 | 15–28% | 25–35 | 30–60 |
| Rooftop solar PV | 1,000–2,500 | 15–30 | 11–18% | 25 | 70–150 |
| Onshore wind | 1,000–1,700 | 25–45 | 25–45% | 25–30 | 30–70 |
| Offshore wind | 2,500–4,500 | 60–110 | 40–55% | 25–30 | 70–140 |
| Gas CCGT | 800–1,300 | 12–25 | 40–70% | 30 | 45–110 (fuel-driven) |
| Coal | 1,500–4,000 | 35–80 | 50–80% | 40 | 65–170 |
| New nuclear | 5,000–12,000 | 100–160 | 85–93% | 60 | 90–220 |
Ways to bring LCOE down
- Cheaper money. For renewables, financing outweighs hardware: each point of WACC moves LCOE by about 6–8%.
- More energy from the same plant. Think better sites, trackers, taller turbines and higher DC/AC ratios.
- A longer life. Good components and repowering that stretch a plant from 25 to 35 years take 10–15% off capital cost per MWh.
- Faster construction. Interest accumulates during a long build, above all for nuclear and large hydro.
- Thermal efficiency. On a CCGT with gas at 8 per GJ, each added point of efficiency is worth about 1 per MWh.
Limits of the metric
Treat the number as a pre-tax, real-terms value for one plant. It leaves out taxes, subsidies, inflation, the revenue profile and system costs. Capacity factor, fuel price and carbon price are held constant in real terms, though fossil plants often run fewer hours as renewables spread. Presets reflect global typicals, so one country may sit at half or double. Taxes and debt are covered by the NPV & IRR calculator.
Method & assumptions
Levelized cost: LCOE = [Σ (capext + O&Mt + fuelt + carbont) / (1 + r)t] ÷ [Σ Et / (1 + r)t]. Construction spending is divided equally across the build years and compounded forward to the commissioning date, so interest accrued while building is counted. Each kW yields 8.76 MWh × CF a year (CF = capacity factor), reduced yearly by degradation. Fuel adds heat rate × fuel price per MWh; carbon adds heat rate × carbon price × fuel CO₂ factor. A fixed O&M figure in kW-years is levelized using the discounted energy.
Frequently asked questions
What is LCOE, in plain terms?
How do solar and wind compare on LCOE right now?
How much does the WACC change the result?
How is fuel cost per MWh worked out?
Does LCOE give a fair solar-versus-gas-or-nuclear comparison?
What capacity factor goes into the calculator?
Sources & references
Embed this calculator
Free for bloggers, installers, schools and NGOs. Copy the snippet below and it stays current by itself.