Few power sources provoke as much disagreement. Fans point to almost no emissions, a small footprint and output that never stops. Opponents point to overruns, accident risk and waste that outlives civilisations. Each camp has real evidence, and the best answer depends on the country. This page lays out what is known about climate, safety, waste, cost, build time and grid fit.
Where nuclear stands today
In 2025 the fleet produced about 2,810 TWh, or 8.8% of the electricity used worldwide (Ember / Our World in Data); around 2000 the share was 16–17%. Output has stayed between 2,500 and 2,800 TWh for two decades, so the fall in share reflects rising demand and a shortage of new units outside China. Roughly 410–440 reactors run in about 30 countries (IAEA PRIS) and 60–70 are being built, about half in China.
| Country | Nuclear share of electricity (2025) | Grid carbon intensity (g CO₂/kWh) |
|---|---|---|
| France | ~69% | ~41 |
| Sweden | ~28% | ~35 |
| Spain | ~19% | ~154 |
| Romania | ~20% | ~251 |
| United States | ~17% | ~384 |
| United Kingdom | ~12% | ~217 |
| Japan | ~9% | ~477 |
| China | ~5% | ~525 |
| Germany | 0% (last plants closed April 2023) | ~330 |
Figures come from the latest year of Ember and Our World in Data. Look up any nation on the country pages and find reactor sites on the power plants map.
For: very low lifecycle emissions
Lifecycle accounting counts everything from the uranium mine to decommissioning and waste handling.
| Source | Life-cycle emissions (g CO₂e/kWh) |
|---|---|
| Coal | 740–1,000 (IPCC median ~820) |
| Natural gas (CCGT) | 410–650 (median ~490) |
| Solar PV (utility) | 20–50 (median ~48 in AR5; lower in newer studies) |
| Hydropower | 1–2,200 (median ~24; reservoir-dependent) |
| Onshore wind | 7–56 (median ~11) |
| Nuclear | 4–110 (median ~12) |
Table source: IPCC AR5 Annex III. UNECE 2021 gives nuclear 5.1–6.4 g CO₂e/kWh. Thanks to nuclear (about 70%) and hydro and renewables, French electricity carries only about a tenth of the world-average carbon intensity; see Carbon Intensity of Electricity.
For: steady output on little land
- Capacity factor: reactors usually operate 80–93% of the year, and US plants average above 90%. Solar gets 10–25% and wind 25–50%.
- Land: about 0.3–1 m² per MWh/yr over the life cycle according to UNECE, ten times less than ground-mounted solar.
- Supply security: a plant keeps 1–2 years of compact fuel on site. Uranium comes from Kazakhstan, Canada, Australia, Namibia and others, though enrichment and fabrication are more concentrated, with Russia holding a large part of enrichment capacity.
- Grid support: big turbines add inertia and voltage control.
Against: cost overruns and build risk
In Western countries, this is the strongest argument against building new reactors. Recent projects:
| Project | Capacity | Original estimate / start | Outcome |
|---|---|---|---|
| Olkiluoto 3 (Finland) | 1.6 GW | €3 bn, online 2009 | Grid operation 2023; cost ~€11 bn |
| Flamanville 3 (France) | 1.65 GW | €3.3 bn, online 2012 | Grid connection Dec 2024; cost estimated ~€13 bn+ (Cour des comptes higher with financing) |
| Vogtle 3 & 4 (USA) | 2.2 GW | ~$14 bn, online 2016–17 | Online 2023–24; total over $30 bn |
| Hinkley Point C (UK) | 3.2 GW | £18 bn, online 2025 | Now expected ~2030–31; £31–35 bn (2015 prices) |
Korea’s APR-1400 plants (Barakah in the UAE among them), China’s Hualong One and earlier French and Japanese fleets cost far less and took 5–8 years per unit. Analysts mostly agree on why: affordability comes from serial building of one standard design, a kept-together workforce and stable regulation.
Levelised cost
CRF = r(1+r)^n / ((1+r)^n − 1)
Years of spending come before the first sale of power, so financing terms matter most. Take a $9,000/kW plant, 90% capacity factor, 60-year life:
- 4% real WACC: CRF ≈ 0.044, capital ≈ $50/MWh; adding O&M and fuel (
$25–30/MWh) gives **$75–80/MWh**. - 9% WACC: CRF ≈ 0.091, capital ≈ $104/MWh, total ~$130–135/MWh.
Lazard (2025) estimates unsubsidised new US nuclear at about $140–220/MWh and utility solar or onshore wind at roughly $40–80/MWh before firming. Government-backed loans or a regulated asset base can cut financing costs in half. The LCOE calculator lets you try other inputs.
Plants already built are another story. They typically generate at about $30–45/MWh, and licences stretched to 60 or 80 years rank among the cheapest low-carbon options available.
Safety and the big accidents
Public opinion rests on three events:
- In 1979 at Three Mile Island (USA) the core partly melted; no deaths have been traced to it.
- At Chernobyl in 1986 (USSR) an explosion and fire killed ~30 people within weeks. WHO/UNSCEAR estimates put later cancer deaths at several thousand, with wide uncertainty, and 2,600 km² were closed off.
- The 2011 tsunami in Japan killed ~18,000 and caused meltdowns at Fukushima Daiichi. Authorities confirmed one death from radiation; over 2,000 more were attributed to the stress and upheaval of evacuation.
Seen per unit of energy produced, the record is good:
| Source | Deaths per TWh (accidents + air pollution) |
|---|---|
| Coal | ~25 |
| Oil | ~18 |
| Gas | ~3 |
| Hydropower | ~1.3 (dominated by the 1975 Banqiao dam failure) |
| Wind | ~0.04 |
| Nuclear | ~0.03 |
| Solar | ~0.02 |
Source: Our World in Data, using Markandya & Wilkinson (2007) and Sovacool et al. (2016). The numbers leave out economic harm, displacement and the burden of a rare but catastrophic risk, which are real, and which societies rate differently.
Radioactive waste
A 1 GW reactor discharges about 20–30 tonnes of spent fuel each year. It is intensely radioactive for centuries and hazardous for tens of thousands of years, yet it is solid, compact and fully accounted for. The options are:
- Pools first, dry casks next: interim storage with decades of safe operation behind it.
- Reprocessing, practised in France, Russia and Japan, extracts uranium and plutonium for MOX and shrinks the volume of high-level waste.
- Deep burial: Onkalo in Finland (~430 m down, granite) leads; Sweden has licensed Forsmark and France is licensing Cigéo.
The obstacle is social and political, not technical: few communities volunteer to host one.
Slow to build, hard to flex
Going from decision to operation takes 10–15 years in the West and 5–8 in China and Korea; wind and solar need 1–5. So up to 2030 nuclear helps mainly via life extensions and restarts. A reactor can follow demand (French ones adjust daily), yet its fixed costs are so high that every hour at part load raises the cost per MWh.
SMRs and advanced reactors
Small modular reactors (up to ~300 MW) aim to lower cost through factory fabrication, modular assembly and simpler passive safety. Where things stand in 2026:
- In Hainan, Linglong One (ACP100, 125 MW) has been in construction since 2021 and is close to starting up.
- Darlington in Canada is the site of a GE-Hitachi BWRX-300 that Ontario Power Generation hopes to power up around 2030.
- The US approved NuScale’s design, but in 2023 the UAMPS project in Idaho was cancelled after estimated power costs climbed to about $89/MWh even with subsidies.
- Demonstration work continues on sodium-cooled, molten-salt and high-temperature gas designs, and technology companies have signed power purchase agreements for future SMR electricity for data centres.
SMRs reach promised prices only if order volumes allow learning, which has not happened outside China.
Life extensions, uprates and restarts
The least expensive new low-carbon nuclear energy usually comes from plants that already stand, by three routes:
- Licence extensions. US reactors were mostly licensed for 40 years; nearly all have won 20-year renewals and more are cleared for 80. France is assessing its 900 MW units for operation past 50 and 60 years. The IEA notes that a life extension generally costs a fraction of new capacity per MWh, and can compete with new wind and solar once grid and firming costs are included.
- Uprates. Replacing turbines, steam generators and instrumentation can lift an existing plant’s output by 5–20%; since the 1970s, American uprates have added what several large reactors would.
- Restarts. Palisades in Michigan, shut in 2022, has been getting ready to resume operation with federal loan support. Constellation intends to restart Three Mile Island Unit 1 (now the Crane Clean Energy Center) with a 20-year power purchase agreement from Microsoft. Japan, meanwhile, has gradually brought back part of the fleet it idled after Fukushima, once new safety reviews were passed.
Closing plants early usually pushes emissions up in the short run. Research on Germany’s phase-out (for example Jarvis, Deschenes and Jha, Journal of the European Economic Association, 2022) found that coal mostly replaced the lost nuclear generation during the 2010s, at a considerable air-pollution cost. Since then, expanding wind and solar has trimmed coal use substantially.
National choices
- Growing the fleet: China, India, Russia, South Korea, the UAE, Poland (first plant planned), Czechia, France (six EPR2 reactors), the UK, the US (restarts and uprates) and Japan (restarting reactors).
- Leaving nuclear, or already gone: Germany finished in 2023; Switzerland has banned new builds but is reviewing; Spain plans closures in 2027–2035 and the plan is debated; Taiwan shut its last reactor in 2025.
- Keeping old plants running: Belgium has softened parts of its phase-out, and many US licences now stretch to 80 years.
Verdict
Nuclear power emits little carbon, scores well on safety per unit of energy and needs very little land; keeping existing plants running is one of the cheapest ways to cut emissions. For new reactors in the West, the problems are price, schedule and financing risk rather than safety or emissions. Whether to build more hinges on local renewable resources, how projects are financed and whether a country can construct a series of identical units instead of one-off megaprojects. The rankings and the world energy map let you compare nuclear-heavy and renewable-heavy grids.
Calculators related to this topic
Frequently asked questions
Does nuclear energy emit little carbon?
How safe is nuclear energy?
What makes new reactors so costly?
Where does nuclear waste go?
What counts as a small modular reactor?
Can nuclear and renewables work together?
Sources & references
- IPCC AR5 WGIII Annex III — Technology-specific cost and performance parameters (life-cycle emissions)
- UNECE (2021). Life Cycle Assessment of Electricity Generation Options
- IEA (2025). The Path to a New Era for Nuclear Energy
- Lazard — Levelized Cost of Energy+ (2025)
- Our World in Data — What are the safest and cleanest sources of energy?
- IAEA — Power Reactor Information System (PRIS)
The figures in this guide are typical ranges taken from the listed sources, and your own values will vary with location, prices and equipment. For estimates specific to your site, use the linked calculators.