Few energy technologies attract as much attention as SMRs, and the IAEA counts more than 80 designs in development around the world. The appeal is easy to grasp. Rather than a single 1,600 MW megaproject that takes 10–15 years, you build compact reactors in a factory, deliver them to a site and add more as demand rises. In 2026 the picture is less tidy: only a handful of small reactors are running, some Western projects have firm construction dates, and the real price tag is unknown. The sections below separate working hardware from slideware and help you weigh the claims.
What the words mean
For the IAEA, a small reactor delivers up to about 300 MWe and a medium one up to about 700 MWe. An EPR, by contrast, produces about 1,650 MWe. Modular describes how it is built: big components, or complete reactor modules, are made in a factory and then moved to the site by truck, rail or ship. At the bottom end, below roughly 20 MWe, the label is microreactor. The glossary entry for SMR gives a short definition.
Compact reactors are nothing new. Naval submarines and icebreakers have used them since the 1950s, and a lot of early civilian stations produced less than 300 MW. The novelty lies in the sales pitch: standard designs, passive safety and serial production, aimed at bringing costs down the way mass manufacturing did for solar panels and batteries.
Types of SMR
| Family | Coolant | Example designs | Size (MWe) | Typical fuel |
|---|---|---|---|---|
| Light-water SMRs | Water | GE-Hitachi BWRX-300, NuScale VOYGR, Rolls-Royce SMR (~470), Holtec SMR-300, CNNC Linglong One | 50–470 | Standard 3–5% LEU |
| High-temperature gas | Helium | China HTR-PM, X-energy Xe-100 | 80–210 | TRISO, HALEU for Xe-100 |
| Sodium-cooled fast | Liquid sodium | TerraPower Natrium (345, with salt storage) | 300–500 | HALEU |
| Molten salt | Fluoride or chloride salts | Kairos Hermes (test), Terrestrial IMSR | 15–200 | Various |
| Microreactors | Heat pipes, gas | Westinghouse eVinci, Oklo Aurora, BWXT BANR | 1–20 | HALEU / TRISO |
Designs cooled by ordinary water are closest to market. They inherit fuel, materials and regulatory experience from the existing fleet (see how a nuclear reactor works). The exotic ones offer higher temperatures for industry and better use of fuel, but they depend on HALEU, a scarce fuel; the fuel cycle guide tells that story.
Projects that exist today
Russia. The Akademik Lomonosov is a barge fitted with a pair of 35 MWe KLT-40S reactors derived from icebreaker designs. It went into commercial service in May 2020 at Pevek, Chukotka, where it supplies electricity and heat to a cut-off Arctic grid. The newest Russian icebreakers run on RITM-200 reactors.
China. The HTR-PM at Shidaowan pairs two helium-cooled modules with one 210 MWe turbine and has been commercial since December 2023. Its output is modest for its size, though it demonstrated the pebble-bed concept at grid scale. On Hainan Island, at Changjiang, the Linglong One (ACP100) is a pressurised water SMR rated 125 MWe. Work started in July 2021, and with start-up near in 2026 it is set to be the first commercial land-based light-water SMR.
Canada. Ontario Power Generation obtained a construction licence for the first Darlington BWRX-300 from the Canadian Nuclear Safety Commission in April 2025. One month on, the province approved four units with an overall budget near C$20.9 billion. Roughly 2030 is the target for unit one, priced at about C$6.1 billion plus another C$1.6 billion or so of shared infrastructure. Elsewhere the same design is planned by the Tennessee Valley Authority at Clinch River and has been selected by OSGE in Poland.
United States. NuScale’s 50 MWe module won US design certification in 2023, a first for an SMR, and an uprated 77 MWe version received NRC standard design approval in May 2025. Its six-module flagship for Utah Associated Municipal Power Systems did not survive: the estimate reached about $9.3 billion for 462 MWe and the project ended in November 2023. TerraPower began non-nuclear work on Natrium in Wyoming in 2024, while Kairos Power is putting up its Hermes test reactor in Tennessee.
Britain and continental Europe. For its first fleet, Britain’s state developer Great British Nuclear selected Rolls-Royce SMR in 2025. Utilities in several Central European states have signed agreements with GE-Hitachi, NuScale or Rolls-Royce, but nuclear construction has not begun at any site.
Why cost is the crux
Big reactors make sense because many costs rise more slowly than output: a unit four times bigger needs far less than four times the concrete, crew or licensing effort. SMRs give that up and hope to win it back with factory production, quicker schedules and cheaper finance.
BWRX-300 at Darlington, unit 1 (incl. share of site works): ≈ C$7.7 billion ÷ 300,000 kW ≈ C$25,700/kW (first-of-a-kind) Four-unit average: C$20.9 billion ÷ 1,200,000 kW ≈ C$17,400/kW
NuScale UAMPS (2023 estimate): $9.3 billion ÷ 462,000 kW ≈ $20,100/kW Vogtle 3–4 (AP1000, final): > $30 billion ÷ 2,234,000 kW ≈ $13,500/kW or more
Handle these comparisons with care, because the numbers are early, first-of-a-kind and not like for like: several include financing, grid works and owner’s costs while others leave them out. The direction still shows. Per kW, an SMR has so far cost at least as much as a large reactor, and the learning effect only shows once dozens of identical units are built. In a levelised cost model, financing and construction time dominate for capital-heavy plants of this kind. Test other overnight costs and discount rates in the LCOE calculator.
Possible niches
- Coal-plant sites. When a coal unit of similar size retires, a 300 MW reactor could take over its grid connection, cooling water and land. Studies in the US and Poland have looked at this in detail.
- Off-grid sites such as mines, Arctic towns and islands, where diesel power costs $0.25–0.50/kWh.
- Process heat and hydrogen. Chemical plants can take 500–750 °C steam from high-temperature designs.
- Data centres. During 2024–2025, Google, Amazon and Microsoft agreed future nuclear supply with Kairos, X-energy and others, as well as with existing large plants.
- Small grids that cannot safely absorb a 1,100 MW unit as a share of the system. As a rule of thumb the largest unit stays below roughly 10% of peak demand.
Southeast Asia
None of the region’s countries runs a nuclear power plant today. Some are studying SMRs because they offer firm low-carbon capacity without huge single units.
- Philippines. Executive Order 164 (2022) brought nuclear into the energy mix, and the US–Philippines civil nuclear agreement (the “123 agreement”) took effect in 2024. Studies have been signed by Meralco and other utilities with NuScale and other vendors.
- Indonesia lists nuclear in its long-term plans, penciling in a first plant for the early 2030s, and has examined designs from ThorCon and NuScale.
- Vietnam reversed course in late 2024 and revived Ninh Thuan, a nuclear project it had cancelled in 2016.
- Malaysia shut its nuclear power agency in 2018; it now describes nuclear, SMRs among it, as an option being studied for after 2035. Public acceptance, regulation and siting remain open. See the Malaysia profile, Malaysia’s energy transition and energy in Southeast Asia.
Verdict
- SMRs now exist as hardware, but only Russia and China operate any, and the first Western units are due around 2029–2032.
- Early costs per kW are at least equal to large reactors, and savings need serial orders that have not been placed.
- The best cases are coal-site replacement, remote grids, industrial heat and small power systems.
- Counting on SMRs for large volumes before the mid-2030s is a bet, not a forecast.
Country figures are in the nuclear energy hub, the nuclear technology page and Nuclear Power: Pros and Cons.
Calculators related to this topic
Frequently asked questions
What exactly is an SMR?
Is any SMR generating electricity now?
Do SMRs cost less than big reactors?
Why did NuScale's Utah project fail?
Does Malaysia have an SMR project?
Do SMRs leave less nuclear waste?
Sources & references
- IAEA — Advances in Small Modular Reactor Technology Developments (2024 edition)
- Ontario Power Generation — Darlington New Nuclear Project
- U.S. NRC — NuScale US600 and US460 design certification and approval
- World Nuclear Association — Small Nuclear Power Reactors
- Krall, L., Macfarlane, A., Ewing, R. (2022). Nuclear waste from small modular reactors. PNAS 119(23)
The figures in this guide are typical ranges taken from the listed sources, and your own values will vary with location, prices and equipment. For estimates specific to your site, use the linked calculators.