Why the bank ends up bigger than the load
Your loads give a starting energy figure, but the capacity on the label must sit well above it, for four reasons: a battery must not be emptied, cold weakens it, heat takes a share, and age wears the cells down. Each reason is applied in turn (the bar chart shows the need rising), and the result becomes a wiring plan for the battery or cell you selected.
- For AC loads, divide daily energy by inverter efficiency to get the energy needed at the battery.
- Multiply by the days of autonomy the bank must deliver with no recharge.
- Allow for discharge losses inside the battery: about 3% with LFP, 10% with lead-acid.
- Respect depth of discharge. LFP can give 80–90% of its capacity, lead-acid about 50%.
- Correct for cold: roughly 1% lost per °C under 25 °C for lead-acid, 0.4% for lithium.
- Add the end-of-life margin (the IEEE 485 ageing factor), so the bank still copes when worn.
Amp-hours follow from dividing by system voltage. The tool builds the string in series to reach that voltage, parallels strings to reach the capacity, and finally compares the bank’s current rating with your peak load.
Equations
Example: 48 V off-grid home
In the preset, the battery supplies 5 kWh a day via an inverter that is 93% efficient. It must last 1.5 days, the LFP cells may go to 80% DoD, the lowest temperature is 10 °C, and the end-of-life design point sits at 80%.
Follow the chain. The terminals must deliver 5.38 kWh/day; over 1.5 days that is 8.06 kWh; discharge losses lift it to 8.31 kWh, the 80% DoD limit to 10.4 kWh and the 10 °C cold to 11.1 kWh. Dividing by the end-of-life factor gives 13.8 kWh nominal, or 288 Ah at 48 V. With 12.8 V 100 Ah LFP batteries the layout is 4S3P: 51.2 V from four in series, 300 Ah from three parallel strings, so twelve batteries and 15.36 kWh. A 3 kW peak draws just 63 A, nowhere near the 300 A the strings can supply, and 1.7 days of autonomy remain even at end of life.
At 12 V the same job would take eleven batteries in parallel and 252 A at peak, which is a strong case for 48 V.
Reading the results
- Configuration such as 4S3P describes the wiring: series units per string × parallel strings.
- Installed bank is generally slightly above the requirement, because batteries come whole.
- Actual autonomy (end of life) is the real reserve once the bank has been rounded up to whole units.
- Peak discharge current and C-rate: lead-acid prefers staying under about 0.2C, LFP under 0.5–1C (confirm with the BMS rating).
Bank sizes by use
- Van or small boat: 1–2 kWh a day, 1 day of autonomy. LFP bank 12 V 100–200 Ah, lead-acid 12 V 200–400 Ah.
- Weekend cabin: 1.5–3 kWh a day, 1.5–2 days. LFP 24 V 150–300 Ah, lead-acid 24 V 300–600 Ah.
- Off-grid home: 4–10 kWh a day, 1.5–3 days. LFP 48 V 200–600 Ah, lead-acid 48 V 500–1,500 Ah.
- Home backup for essentials: 3–6 kWh a day, 0.5–1 day. 5–10 kWh at 48 V in LFP; lead-acid is rarely used for this now.
Build advice
- Match the batteries: one model, one capacity, one age, and one chemistry only.
- Wire strings symmetrically with the positive lead from one end and the negative from the opposite end, or with busbars, so that every string sees the same cable resistance.
- Put a fuse on every parallel string, close to the battery. Without one, all the other strings feed a short in a single string.
- Choose a higher voltage rather than more strings. You save fuses, balance better and use thinner cable (see the cable size calculator).
- Check runtime at real loads with the battery backup time calculator, and the charging side with the off-grid solar calculator.
Boundaries of the model
Daily energy is treated as an average. When short, very high loads dominate, check the battery’s power rating and Peukert losses on their own. Temperature factors are simple linear approximations, and lithium charging limits below 0 °C are not modelled. Settings of the battery-management system, cell balancing and the manufacturer’s own parallel limits always override these general rules.
Method & assumptions
Nominal energy to install = daily energy ÷ inverter efficiency × days of autonomy ÷ battery discharge efficiency ÷ depth of discharge ÷ temperature factor ÷ end-of-life capacity, which is an ageing allowance in the spirit of IEEE 485. Ah to install = Wh ÷ system voltage.
The number of units in series is system voltage ÷ single-unit voltage, and the number of parallel strings is ⌈ required Wh ÷ (bank voltage × unit Ah) ⌉. For the peak current, divide peak load by inverter efficiency and by bank voltage, then compare it with parallel strings × the continuous current limit of one unit.
Frequently asked questions
Method for calculating the battery bank I need?
How many batteries make up a 48 V bank?
Series or parallel: what changes?
What is the limit on parallel battery strings?
Which voltage should the bank use, 12 V, 24 V or 48 V?
What does the ageing factor do in battery sizing?
Sources & references
- IEEE Std 485: Recommended Practice for Sizing Lead-Acid Batteries for Stationary Applications
- IEEE Std 1562: Guide for Array and Battery Sizing in Stand-Alone PV Systems
- Battery University: BU-302 Series and parallel battery configurations
- Sandia National Laboratories: Stand-Alone Photovoltaic Systems, A Handbook of Recommended Design Practices
Embed this calculator
Free for bloggers, installers, schools and NGOs. Copy the snippet below and it stays current by itself.