Why head times flow is not enough
Falling water gives up energy in proportion to its mass and the height of the drop, so a quick estimate looks easy. That is exactly why simple calculators overshoot: they leave out penstock friction, seasonal flow and part-load turbine behaviour. This calculator accounts for all three.
| Step | What the tool does |
|---|---|
| 1. Flow | Takes your measured mean flow, or derives one from catchment area × rainfall × runoff coefficient. A residual (environmental) flow stays in the stream; the rest is shaped month by month by a seasonal pattern (rain-fed, snow-melt, monsoon, Mediterranean or spring-fed). |
| 2. Net head | Computes penstock friction with the Darcy–Weisbach equation and a Colebrook friction factor for your pipe’s material and diameter, then adds minor losses at the intake, bends and valves. |
| 3. Turbine | Rates Pelton, Turgo, cross-flow, Francis, Kaplan, propeller and Archimedes-screw machines against net head and design flow, and chooses the best fit unless you pick another. Each family has its own peak efficiency, part-load curve and minimum flow: a propeller turbine stops below about 70% of design flow, a Pelton runs on down to 10%. |
| 4. Energy and money | Multiplies monthly power × hours × availability, then goes on to payback, LCOE and IRR. |
Formulas
H_net = H_gross − f × (L / D) × v² / 2g − ΣK × v² / 2g Q_turbine,month = min(Q_design, Q_stream,month − Q_residual) E_year = Σ_months P_month × hours × availability
In these equations ρ is 1,000 kg/m³ and g is 9.81 m/s². At micro scale, turbines typically achieve 72–88%, generators 85–92% and the drive plus controls 95–97%, which leaves a water-to-wire efficiency of 55–75%.
Sample site: a farm stream
The presets model a stream averaging 60 L/s over 30 m of gross head, carried by 150 m of 200 mm HDPE pipe, with a temperate (winter-high) flow pattern and 10% of the flow left as residual.
| Result | Value |
|---|---|
| Pipe velocity | 1.9 m/s |
| Head lost to friction and minor losses | 2.5 m (8.5%), leaving 27.5 m |
| Best-rated turbine | cross-flow (Turgo also suitable), peaking near 72% at micro scale |
| Power at 60 L/s design flow | about 10 kW electrical, 57% water-to-wire |
| Yearly energy | about 64,600 kWh (capacity factor 73%) |
| Cost at 4,500 €/kW | about €45,000 |
| Payback and LCOE at €0.15/kWh | about five years; close to €0.06/kWh |
Seasons shape output. In winter the turbine gets full flow, yet in late summer the stream carries under 30 L/s and power falls to about a third.
Reading the results
| Output | How to use it |
|---|---|
| Electrical power at design flow | The nameplate rating to specify. |
| Annual energy and capacity factor | The real worth of the site once seasons, residual flow and downtime are included. |
| Net head and penstock velocity | If losses pass 10–15% or velocity goes above about 3 m/s, test a larger pipe in the penstock calculator. |
| Turbine suitability chart and table | Show each family’s head and flow range; a tick means your site is inside it. |
| Monthly table | Shows which months run at part load, and which fall below the turbine’s minimum flow so that it stops. |
Turbine families at a glance
| Part-load behaviour | Peak efficiency (micro → large) | Flow | Net head | Turbine |
|---|---|---|---|---|
| excellent, down to 10% flow | 80–92% | 1 L/s – 50 m³/s | 10–1,800 m (best > 50 m) | Pelton |
| very good | 78–88% | 2 L/s – 10 m³/s | 10–300 m | Turgo |
| flat curve, simple and rugged | 72–85% | 10 L/s – 10 m³/s | 2–200 m | Cross-flow |
| poor below ~40% flow | 84–94% | 0.1–1,000 m³/s | 10–700 m | Francis |
| good (double-regulated) | 84–93% | 0.3–1,000 m³/s | 1.5–40 m | Kaplan |
| needs > 70% flow | 78–90% | 0.05–500 m³/s | 1.5–30 m | Propeller |
| good, fish-friendly | 75–85% | 0.1–15 m³/s | 1–10 m | Archimedes screw |
Tips for a better site
- Survey at the driest time. Measuring in August with a bucket and stopwatch, a float or salt dilution tells you more than rainfall figures do.
- Look for head, not length. Relocating the intake uphill often gains more head than the extra pipe loses to friction. Confirm it with the penstock calculator.
- Pick the design flow deliberately. Design at the mean flow and utilisation stays high. Design at 1.3–1.5× the mean and winter energy rises, but more months run at part load.
- Consider two units (or a multi-jet Pelton) if flow swings widely, so the dry months still get an efficient machine.
- Keep the trash rack clean. Overnight, a clogged one can cost you several metres of head.
Limitations
The seasonal flow shapes are templates, not measurements. Gauged data, or the flow-duration curve of a similar gauged catchment, will be much more accurate. Daily variation also means that a monthly model overstates output slightly. If you estimate flow from the catchment, expect only about ±50%. Turbine ranges and efficiencies are published typicals, not a manufacturer’s hill chart. On cost, civil works, permits, fish passage and grid connection often dominate, and they reach the model only via your cost per kW.
Method & assumptions
Power: multiply the three efficiencies ηturbine · ηgenerator · ηdrive by ρ · g · Q · Hnet, with water density ρ = 1,000 kg/m³ and g = 9.81 m/s². Net head starts at the gross head and loses pipe friction (Darcy–Weisbach with a Colebrook friction factor from the pipe roughness) and minor losses (ΣK·v²/2g). For each turbine family, peak efficiency uses typical published values, lower for micro units (<100 kW), and part-load efficiency follows its own curve: Pelton and cross-flow hold steady, Francis drops quickly and propeller machines need >70% of design flow. No turbine runs below its minimum flow. Monthly flow is the mean flow × seasonal factor minus the residual flow, capped at the design flow, and yearly energy = Σ over months of monthly power × hours × availability.
Frequently asked questions
What is the hydro power formula?
How much electricity can a small stream give?
What type of hydro turbine suits my site?
Gross head or net head: which one do I use?
What should I budget for micro hydro?
Is a permit needed for micro hydro?
What yearly energy does a micro hydro plant deliver?
Sources & references
- ESHA — Guide on How to Develop a Small Hydropower Plant (European Small Hydropower Association)
- IRENA — Renewable Power Generation Costs in 2023 (hydropower chapter)
- Paish, O. (2002). Small hydro power: technology and current status. Renewable and Sustainable Energy Reviews 6(6)
- US Department of Energy — Planning a Microhydropower System
Embed this calculator
Free for bloggers, installers, schools and NGOs. Copy the snippet below and it stays current by itself.