One number for plant utilisation
How hard does a plant actually work? Capacity factor answers in one figure. Technology comparisons and every levelized-cost calculation rest on it, and it quickly exposes suspect production data. Three modes are available:
- Find the capacity factor by entering nameplate capacity and the energy generated in a period.
- Find the energy a planned plant should deliver in a year, starting from an assumed capacity factor.
- Find the capacity (in MW) needed for a target amount of energy at a given capacity factor, such as the solar needed for 1 TWh.
The period can be a year, leap year, quarter, month, week, day or any hours you type in. kW, MW and GW, as well as kWh, MWh, GWh and TWh, are converted for you, and the answer is placed beside the typical ranges of 14 technologies.
Formulas
E = P × T × CF (energy from capacity factor) P = E / (T × CF) (capacity for an energy target) Full-load hours = CF × T Average power = E / T
Here T counts the hours in the period, 8,760 in an ordinary year. The energy should be net, as delivered to the grid, and capacity must be on a matching basis; for solar that normally means AC inverter capacity.
Example: 50 MW wind farm
The preset is a 50 MW wind farm that sent out 140,000 MWh over one year.
- CF = 140,000 / (50 × 8,760) = 140,000 / 438,000 = 32.0%
- Full-load hours: 0.32 × 8,760 ≈ 2,800
- Mean output: 140,000 / 8,760 ≈ 16 MW
A figure of 32% falls well within the 20–45% usual for onshore wind. Try the other presets to see how wide the spread is: a 6 kW rooftop PV system with 7,300 kWh a year comes to about 14%, and a 1 GW nuclear unit at 92% produces roughly 8.1 TWh annually. For 1 TWh from fixed-tilt solar at a 20% capacity factor the answer is about 570 MW.
Interpreting the results
- Capacity factor: set it against the range given for your technology. A result under the range hints at curtailment, outages, poor resource or an oversized plant, and one over it at a superb site or bad data.
- Full-load hours say the same thing differently and are the usual currency in Germany and in wind-industry reports.
- Average power is handy for pairing a generator with a steady load.
- Output while available is optional: capacity factor divided by availability, which keeps downtime apart from resource and dispatch effects.
Ranges by technology
- Nuclear: 80–93%, limited by refuelling outages.
- Geothermal: 70–90%, resource is constant.
- Biomass / biogas: 50–85%, fuel supply and dispatch.
- Gas combined cycle: 45–65%, dispatched on price.
- Coal: 35–65%, falling dispatch.
- Offshore wind: 38–55%, wind resource.
- Hydropower: 30–60%, water availability.
- Onshore wind: 20–45%, wind resource and rotor size.
- Concentrated solar with storage: 30–55%, set by storage hours.
- Utility PV with tracking: 20–32%; fixed: 12–25%. Both depend on sunlight and latitude.
- Rooftop PV: 9–20%, orientation and shading.
- Gas/oil peakers: 2–15%, running only at peaks.
- Battery storage: 8–20%, cycles × duration.
These ranges blend US fleet statistics from the EIA with global new-build averages from IRENA. Single plants and years vary widely.
Practical notes
- Keep units consistent. Mixing kW with MWh is the commonest mistake and gives results 1,000 times too large or small.
- Name the basis for solar. Capacity factors on DC (panel) capacity come out 10–30% lower than on AC (inverter) capacity.
- Compare like years. Wind and hydro capacity factors swing ±10–15% between good and poor years.
- Feed it into cost models. It is the denominator of every LCOE (see the LCOE calculator) and the main output of the wind turbine and solar panel calculators.
What it leaves out
A capacity factor sums up output, not value: a peaker that runs 5% of the time can be worth more to the grid than a baseload plant. Ranges are broad and differ by country, year and plant age. Gross and net generation are not told apart and degradation is ignored, so enter the net energy delivered for the period you care about.
Method & assumptions
The capacity factor is CF = E ÷ (Pnameplate × T): net delivered energy E over a period of T hours, relative to what the nameplate could produce. Solving for the other unknowns, energy = P × T × CF and required capacity = E ÷ (T × CF). Full-load hours = CF × T and average power = E ÷ T. Inputs are normalised to kW and kWh internally.
Frequently asked questions
What does capacity factor mean?
What is the capacity factor formula?
Which generation type has the top capacity factor?
What counts as a good solar capacity factor?
Are capacity factor and efficiency the same thing?
What do full-load hours mean?
Why is the capacity factor of a gas peaker so small?
Sources & references
Embed this calculator
Free for bloggers, installers, schools and NGOs. Copy the snippet below and it stays current by itself.