Glossary · Economics

Contract for Difference (CfD)

A contract or support scheme that pays a generator the gap between an agreed strike price and a market reference price, and takes money back from it when the market price is higher.

A contract for difference (CfD) fixes a generator's revenue around an agreed strike price while the plant still sells its power on the market. If the reference price falls short of the strike, the counterparty tops up the gap; if it is higher, the generator repays the excess. Because money flows both ways, consumers do not fund windfall gains during price spikes.

Payment to generator = (Strike price − Reference price) × Output

The UK began CfD auctions in 2014. Offshore wind strike prices dropped from about 140 GBP/MWh (2012 prices) in Allocation Round 1 (2015) to roughly 37 to 40 GBP/MWh in AR3 (2019). Cost inflation then left AR5 (2023) without a single offshore wind bid, and AR6 (2024) cleared offshore wind at about 59 GBP/MWh (2012 prices). The nuclear CfD for Hinkley Point C is 92.50 GBP/MWh (2012 prices) over 35 years.

Under the 2024 EU electricity market reform, new public support for wind, solar, geothermal, hydro without reservoirs and nuclear must take the form of two-sided CfDs from 2027. France, Poland, Ireland, Italy and Spain already run CfD auctions.

A feed-in tariff pays out whatever the market does, whereas a CfD leaves generators responsive to dispatch signals; one-sided premiums, by contrast, let excess revenue stay with the generator. Lower revenue risk can cut the WACC by 1 to 3 percentage points, which reduces LCOE noticeably for capital-intensive technologies.

Related terms

All terms →
  • PPA (Power Purchase Agreement)

    A long-term deal in which a buyer agrees to take electricity from a named generator at a fixed price or according to a price formula.

  • Feed-in tariff

    A policy promising renewable generators a fixed payment for every kWh they supply, normally for 15 to 20 years, whatever the market price does.

  • LCOE (Levelized Cost of Electricity)

    The flat price per MWh that would repay every lifetime cost of a power plant, once costs and output are both discounted to present value.

  • WACC

    Weighted average cost of capital: the mix of returns lenders and shareholders require, used as the discount rate when valuing energy projects.

  • Offshore wind

    Wind turbines standing in the sea or a large lake, mostly on fixed foundations in water as deep as about 60 m, where winds blow harder and more evenly than on land.

  • Capacity market

    A scheme that pays resources for standing ready to supply power or cut demand during system stress, on top of payments for energy.