Glossary · Economics

LCOE (Levelized Cost of Electricity)

The flat price per MWh that would repay every lifetime cost of a power plant, once costs and output are both discounted to present value.

Technologies with different cost profiles are hard to compare directly, which is the job of the levelized cost of electricity (LCOE). You discount every cost over the plant's life, discount every unit of electricity it will produce, and divide the first total by the second.

LCOE = Σ [(It + O&Mt + Ft) / (1+r)t] ÷ Σ [Et / (1+r)t]

In the formula, I stands for investment (CAPEX), O&M for operating cost (OPEX), F for fuel and carbon, E for electricity generated and r for the discount rate. Three inputs drive LCOE for plants that need heavy capital: CAPEX, capacity factor and financing cost.

Published unsubsidised figures: according to Lazard LCOE+ (June 2025), utility-scale solar costs about 38 to 78 USD/MWh, onshore wind 37 to 86, gas combined cycle 48 to 109 and new nuclear 141 to 220. IRENA's global weighted averages for new 2024 projects are about 43 USD/MWh for solar PV (roughly 90% below 2010), 34 for onshore wind and 79 for offshore wind.

One weakness: LCOE is blind to timing and location of output. Integration cost, capacity value and price cannibalisation therefore go unseen. To fill the gap, analysts use value-adjusted LCOE (IEA VALCOE), system LCOE, or LCOS for storage.

Related terms

All terms →
  • CAPEX

    Short for capital expenditure: the money spent up front to build an energy asset, normally stated per kW (power plants) or per kWh (storage).

  • OPEX

    OPEX, or operating expenditure, is what it costs each year to operate and maintain an energy asset, from fixed charges per kW-year to variable ones per MWh.

  • Discount rate

    A yearly percentage that converts future costs and income into today's value, capturing both the time value of money and investment risk.

  • Capacity factor

    Actual energy a power plant generates in a period divided by what it would generate at full nameplate capacity throughout that period.

  • WACC

    Weighted average cost of capital: the mix of returns lenders and shareholders require, used as the discount rate when valuing energy projects.

  • LCOS (Levelized Cost of Storage)

    Lifetime average cost for each MWh a storage asset discharges, covering investment, operation, charging electricity and efficiency losses.