Offshore wind
Wind turbines standing in the sea or a large lake, mostly on fixed foundations in water as deep as about 60 m, where winds blow harder and more evenly than on land.
The sea surface is smooth, so wind has little shear, and there are few limits on how large a turbine can be. In the North Sea, mean hub-height wind speeds of 9–10.5 m/s are normal. New projects reach capacity factors of 40–50%, compared with roughly 25–40% for ordinary onshore wind (IRENA, Ember).
Water depth decides the foundation:
- Monopiles are the most common, now 8–11 m across and used down to about 40–50 m.
- Jackets are lattice frames for 30–60 m depths or heavy turbines.
- Gravity bases and suction buckets suit particular sites.
- Floating designs take over beyond about 60 m; see floating offshore wind.
By 2024 installed capacity worldwide had passed roughly 75–80 GW (GWEC), with China, the United Kingdom and Germany ahead. European projects now use 12–15 MW turbines as standard, and China has built 18–26 MW prototypes.
Offshore costs more than onshore because of foundations, installation vessels, export cables and offshore substations, and distant sites connect through HVDC. IRENA put the global weighted LCOE of 2023 projects near USD 75–80/MWh, about twice onshore wind. Between 2022 and 2024, inflation, higher interest rates and supply-chain strain caused US and UK contracts to be cancelled, a sign of how sensitive the sector is to financing costs. Big arrays also suffer more and more wake effects from neighbouring projects.
Related terms
All terms →- Floating offshore wind
Offshore wind in which each turbine stands on a floating, anchored hull, making sites beyond roughly 60 m of depth usable where fixed foundations would cost too much.
- Wake effect
The region of slower, more turbulent air behind a wind turbine, which reduces the output of turbines downwind and adds to their fatigue loads.
- Capacity factor
Actual energy a power plant generates in a period divided by what it would generate at full nameplate capacity throughout that period.
- HVDC (High-Voltage Direct Current)
Bulk power transmission using direct current, which loses less energy over long distances and can join grids that are not synchronised.
- Contract for Difference (CfD)
A contract or support scheme that pays a generator the gap between an agreed strike price and a market reference price, and takes money back from it when the market price is higher.
- Hub height
Height of the rotor centre above ground or sea level on a wind turbine; taller hubs find stronger, steadier wind and are a main reason capacity factors keep rising.