Nodal pricing (LMP)
Electricity market design that prices power separately at each grid node: the energy price plus congestion and loss costs for delivery to that point.
PJM, ERCOT, CAISO, MISO, New Zealand and Singapore price power by location. The price at a node equals what it costs to supply one extra MWh there. Behind a transmission bottleneck it climbs; where output is stranded it drops. Developers read that as a hint on where to put plants, storage and lines.
European markets instead use bigger bidding zones and handle local limits through redispatch. Britain looked at locational pricing and turned it down in 2025. See how electricity markets work.
Related terms
All terms →- Redispatch and congestion management
Adjustments a grid operator orders to the generation schedule the market has settled on, so that transmission lines do not overload.
- Merit order
Plants lined up by rising marginal cost so the cheapest run first; the last one needed sets the market clearing price.
- Day-ahead market
Auction on the preceding day in which wholesale power is traded, producing hourly or 15-minute prices and the generation schedule for the next day.
- Transmission and distribution losses
Energy lost between generation and customers, partly as heat and partly from non-technical causes such as theft. It is generally stated as a share of energy supplied.