Today's value of every future cash flow a project will generate, less what it costs to build; a result above zero means the project creates value.
Discounted cash flow analysis rests on net present value (NPV). It tells you how much an investment adds once money's time value and the return investors demand are both counted.
In the formula, I0 is the money spent up front (CAPEX). CFt is the net cash in year t: revenues or savings after OPEX, taxes and replacements. The discount rate r is usually the WACC, and n is how long the project lasts.
The rule is simple: back a project when NPV is positive, and when options exclude each other, take the one with the largest NPV. A 100 MW solar farm that costs 65 million USD and nets 6.5 million USD a year for 30 years shows how much the discount rate matters. Its NPV is about +8 million USD at 8% and about +47 million USD at 4%.
For energy assets, a few extra items need attention: PV module or turbine degradation (0.3 to 0.8% a year for PV), replacing inverters or batteries (often around years 10 to 15), price cannibalisation on merchant revenue, decommissioning, subsidies and tax credits such as the US ITC and PTC, and using real or nominal figures consistently. Two related measures are IRR, the rate that brings NPV to zero, and LCOE, the fixed price at which NPV is zero.
Related terms
All terms →- IRR (Internal Rate of Return)
The discount rate that brings a project's net present value to zero; it expresses the project's effective yearly return.
- Discount rate
A yearly percentage that converts future costs and income into today's value, capturing both the time value of money and investment risk.
- WACC
Weighted average cost of capital: the mix of returns lenders and shareholders require, used as the discount rate when valuing energy projects.
- Payback period
How long it takes for an investment's accumulated savings or revenue to match what it cost.
- LCOE (Levelized Cost of Electricity)
The flat price per MWh that would repay every lifetime cost of a power plant, once costs and output are both discounted to present value.
- CAPEX
Short for capital expenditure: the money spent up front to build an energy asset, normally stated per kW (power plants) or per kWh (storage).