Power curve
How a turbine's electrical output depends on wind speed at hub height; with a wind speed distribution it yields an estimate of yearly energy production.
Read a power curve left to right and you pass through four regions. Under cut-in (about 3 m/s) the turbine produces nothing. From there output rises steeply, roughly as the cube of speed, up to rated speed at 10–13 m/s. Then it levels off at nameplate power. Finally, at cut-out (about 25 m/s), the machine stops or tapers off gently.
Warranted curves come from measurements to IEC 61400-12-1: a met mast 2–4 rotor diameters upwind, 10-minute averages, 0.5 m/s bins and normalisation to a reference air density, usually 1.225 kg/m³. Thinner air, as at high altitude or in hot climates, shifts the curve to the right.
The site's wind speed frequency distribution, usually a Weibull distribution, is combined with the curve to estimate annual energy production (AEP):
This is the gross figure. Subtracting wake losses (5–15%), availability (2–5%), electrical losses (1–3%), blade degradation, icing and curtailment gives net AEP, and total losses of 15–20% are normal in bankable studies.
On site, real performance drifts from the warranted curve. Causes include turbulence intensity, wind shear across the rotor, inflow angle and eroded leading edges. Turbulence tends to raise output near the knee and lower it near rated speed.
Related terms
All terms →- Cut-in wind speed
The minimum wind speed, taken at turbine hub height, for net power output; modern turbines start between about 2.5 and 4 m/s.
- Rated wind speed
Wind speed at which a turbine first produces its full rated (nameplate) power, usually 10 to 13 m/s on modern utility-scale machines.
- Cut-out wind speed
Wind speed above which a turbine halts or throttles back to avoid structural overload; for utility-scale machines usually 25 m/s as a 10-minute average.
- Weibull distribution
A probability distribution with two parameters, scale c and shape k, that shows how frequently each wind speed occurs at a location.
- Betz limit
The theoretical ceiling on the share of wind kinetic energy an open rotor can capture: 16/27, about 59.3%.
- Capacity factor
Actual energy a power plant generates in a period divided by what it would generate at full nameplate capacity throughout that period.