Why site conditions matter
Nameplate ratings assume 15 °C, sea level, 60% relative humidity and 100% load, a combination plants rarely see. In a desert summer a peaking unit may give up 15% of its capacity; a CCGT that tracks demand at night can spend hours at 50–60% load. Both situations raise the gas bill per MWh.
From datasheet efficiency and rated output, the calculator applies two simple corrections. One is a hot-weather derate when ambient air exceeds 15 °C. The other is a part-load penalty, which increases as load falls. The adjusted heat rate then gives hourly gas flow (MMBtu, GJ, m³, scf, tonnes), annual totals, fuel cost per MWh and CO₂.
Equations
Available output: P_avail = P_ISO × (1 − d × (T_amb − 15)) Ambient heat rate: HR_T = HR × (1 + 0.25 × d × (T_amb − 15)) Part load: HR(L) = HR_T × (1 + k × (1/L − 1))
Gas flow (GJ/h, LHV) = HR(L) × P_avail × L ÷ 1,000 HHV = LHV × 1.108 1 MMBtu = 1.055 GJ m³ = GJ_HHV × 1,000 ÷ HHV (MJ/m³)
Built-in values of k: 0.28 for a heavy-duty open-cycle turbine, 0.22 aeroderivative, 0.12 F-class CCGT, 0.10 H/J class, 0.06 gas engine. Built-in values of d: 0.6–0.7%/°C if the unit is simple cycle, about 0.45%/°C for a CCGT. A gas engine hardly reacts to air temperature, so its d is set very small.
Sample run
Preset: 450 MW F-class CCGT, 57% LHV, 80% load, 25 °C air, 5,000 h/yr, gas priced at 8 per MMBtu.
- Output ceiling at 25 °C is 450 × (1 − 0.0045 × 10) = 429.8 MW, so 80% load means 343.8 MW delivered.
- Starting from 6,316 kJ/kWh (ISO), temperature adds 1.1% and part load another 3%, giving 6,578 kJ/kWh LHV. In efficiency terms that is 54.7%; on an HHV basis it is 6,909 Btu/kWh.
- 6,578 × 343.8 ÷ 1,000 = 2,262 GJ/h LHV, i.e. 2,506 GJ/h HHV or 2,375 MMBtu/h. In volume: about 64,900 m³ hourly.
- Per MWh, fuel costs 2,375 × 8 ÷ 343.8 = 55.3 and the plant emits 2,375 × 53.06 kg ÷ 343.8 = 367 kg of CO₂.
- Over the year: 1,719 GWh generated, 11.9 million MMBtu (0.33 billion m³) burned, 630 kt CO₂.
The “Peaker 100 MW, 600 h” preset shows the other end. At 35 °C the machine loses 12% of output and uses roughly 50% more gas per MWh than the CCGT above.
Benchmarks
| Plant category | Full-load LHV efficiency | Btu/kWh heat rate, HHV | Gas needed per MWh |
|---|---|---|---|
| Combined cycle, H/J class | 60–63% | 6,000–6,300 | 6.0–6.3 MMBtu, ≈ 165 m³ |
| Combined cycle, F class | 55–58% | 6,500–6,900 | 6.5–6.9 MMBtu, ≈ 180 m³ |
| Open cycle, aeroderivative | 38–42% | 9,000–9,900 | 9–10 MMBtu, ≈ 255 m³ |
| Open cycle, heavy-duty | 34–38% | 9,900–11,100 | 10–11 MMBtu, ≈ 285 m³ |
| Reciprocating gas engine (≥ 5 MW) | 44–49% | 7,700–8,600 | 7.7–8.6 MMBtu, ≈ 220 m³ |
| Microturbine | 25–30% | 12,600–15,100 | 12.6–15 MMBtu |
According to EIA, gas CCGTs in the US average close to 7,500 Btu/kWh and gas turbines about 11,000. Frequent starts, partial loading and ageing machines explain why fleets trail brand-new plants.
What each result tells you
- MMBtu/h of gas is the figure for a pipeline operator or supplier. Metric contracts use m³/h, US ones million scf per day.
- Efficiency at the chosen point shows how far you are from the datasheet; a gap above 10% hints that fewer units at higher load might do better.
- Fuel cost per MWh is the marginal fuel cost; weigh it against the power price to get the “spark spread”.
- Part-load table: a CCGT is happiest above 50–60% load, whereas a gas engine can follow demand with little penalty.
Caveats
These curves are generic and fit screening work. Real turbines behave in steps (inlet guide vanes, sequential combustion, one unit leaving a multi-shaft block), and humidity, altitude and inlet or exhaust losses add scatter. Fuel burned during start-up is not counted: a hot start of a large CCGT can use several hundred MMBtu before it reaches minimum load. For contract work, take the manufacturer’s correction curves. Other fuels and steam plants fit the heat rate calculator, and converting gas prices between units is the job of the energy price converter.
Method & assumptions
Heat rate under ISO full-load conditions is 3,600 ÷ efficiency, in kJ/kWh on an LHV basis. When ambient air exceeds 15 °C, each extra °C removes output according to the hot-weather coefficient and pushes heat rate up by one quarter of that loss. Under part load, HR(L) = HRfull × (1 + k × (1/L − 1)): k lies near 0.25–0.3 for simple-cycle turbines, 0.1–0.12 for combined cycles, and 0.05 for gas engines. Convert to fuel with HR × MW ÷ 1,000 for GJ/h (LHV); HHV = LHV × 1.108; 1 MMBtu = 1.055 GJ; and volume in m³ = GJ (HHV) ÷ heating value.
Frequently asked questions
How many MMBtu per hour does a turbine burn?
Gas needed per MWh of power generated?
Why does a combined cycle burn less gas than an open cycle?
How does ambient heat change turbine gas consumption?
Part-load efficiency of a gas turbine?
Converting MMBtu to m³ of natural gas?
Sources & references
- US EPA — GHG Emission Factors Hub (natural gas 53.06 kg CO₂/MMBtu)
- US EIA — Average operating heat rate by prime mover and energy source
- ISO 3977-2 — Gas turbines: standard reference conditions and ratings
- US DOE / NETL — Cost and Performance Baseline for Fossil Energy Plants, Vol. 1 (natural gas combined cycle)
Embed this calculator
Free for bloggers, installers, schools and NGOs. Copy the snippet below and it stays current by itself.