Wind calculator

Wind farm model: energy, LCOE, IRR and debt sizing in one place

Model a whole utility-scale wind project on a single page. Inputs: turbines, capacity factor or wind speed, capex, opex, PPA price and debt. Outputs: yearly MWh, LCOE, IRRs, DSCR, land use and homes supplied.

Editable share link Branded PDF report Free · no sign-up

Results

Output of 54 MW is 173,887 MWh/yr (net CF 36.8%). Against a price of 68 €/MWh, the LCOE stands at 54 €/MWh. Bankable-looking: equity IRR 20.3%, minimum DSCR 1.75.
Annual energy (P50, year 1)
173.9GWh
48,302 average EU homes
Net capacity factor
36.8%
gross 43.2% · 3,220 full-load h
LCOE
54€/MWh
at 6.5% WACC over 30 years
Project IRR (unlevered)
12.6%
NPV 55 M€
Equity IRR
20.3%
70% debt at 5.5% over 15 years
Min / avg DSCR
1.75 / 1.85
debt service 5.27 M€/yr
Total capex
€75,600,000
435 € per annual MWh
Year-1 revenue
€11,824,328
opex 2,615,774 €
Simple payback
8 yrs
Wind farm area
6.4km²
rotor Ø 138 m · direct land use ≈ 22 ha
CO₂ avoided per year
69.6kt
Cash flow: revenue, opex and debt service
LCOE breakdown

Project cash flows

YearEnergy (MWh)Revenue (k€)Opex (k€)CFADS (k€)Debt service (k€)DSCREquity cash (k€)
1173,88711,8242,6169,2095,2721.753,936
2173,19211,9542,6679,2875,2721.764,015
3172,49912,0842,7199,3665,2721.784,094
4171,80912,2172,7719,4455,2721.794,173
5171,12212,3502,8259,5255,2721.814,253
6170,43712,4852,8809,6055,2721.824,333
7169,75512,6222,9369,6865,2721.844,413
8169,07612,7602,9949,7665,2721.854,494
9168,40012,9003,0529,8485,2721.874,576
10167,72613,0413,1119,9295,2721.884,657
11167,05613,1833,17210,0125,2721.94,739
12166,38713,3283,23410,0945,2721.914,822
13165,72213,4743,29710,1775,2721.934,905
14165,05913,6213,36110,2605,2721.954,988
15164,39913,7703,42610,3445,2721.965,071
16163,74113,9213,49310,427——10,427
17163,08614,0733,56110,512——10,512
18162,43414,2273,63110,596——10,596
19161,78414,3823,70110,681——10,681
20161,13714,5403,77410,766——10,766
21160,49214,6993,84710,852——10,852
22159,85014,8603,92210,938——10,938
23159,21115,0223,99911,024——11,024
24158,57415,1874,07711,110——11,110
25157,94015,3534,15611,197——11,197
26157,30815,5214,23711,284——11,284
27156,67915,6904,32011,371——11,371
28156,05215,8624,40411,458——11,458
29155,42816,0364,49011,546——11,546
30154,80616,2116,7379,474——9,474
  • A generic 4.5 MW power curve (rotor Ø 138 m, air density 1.188 kg/m³) is run over a Weibull distribution, and 15% of total losses come off the result. For a P50 a bank will accept, swap in the supplier's curve and add a wake model such as PyWake or WAsP.
  • The model is pre-tax. It leaves out corporate tax, depreciation, grid fees, balancing costs and curtailment. Debt is usually sized on P90, often 8–12% under P50, so run a lower capacity factor as a test.
  • Land: the array area covers the full layout, but only about 1–3% is actually occupied by pads, roads and the substation. Farming can carry on around the turbines.

Four building blocks

Wind needs no fuel, so nearly all the money goes in before the first kilowatt-hour and the payoff is a long, fairly steady income. The page reproduces the heart of a developer’s model in four blocks.

  1. Yield (P50). Either type in a net capacity factor, or give hub-height wind speed with a Weibull k and the turbine’s specific power. In the second case a generic power curve is integrated across the local speed distribution at the site’s air density, and total losses (wakes, availability, electrical, curtailment) come off the result.
  2. Cash flow. Income runs at your PPA or market price with yearly indexation. Costs are fixed O&M (land lease and insurance included), variable O&M, degradation of output and, in the last year, decommissioning.
  3. Financing. A level-annuity loan finances a share of capex and equity covers the rest. You receive the project (unlevered) IRR, equity IRR, NPV at your WACC, and each year’s debt service coverage ratio (DSCR).
  4. Impact. Land footprint (from rotor diameter and spacing), homes supplied and CO₂ saved.

Equations

Rotor diameter D = √(4 × P_rated / (π × specific power)) Net energy E = 8,760 × ∫ P(v) f(v) dv × N × (1 − losses) LCOE = (Capex + Σ O&M_t / (1+r)^t) / Σ E_t / (1+r)^t Debt service DS = Debt × i / (1 − (1+i)^−n) DSCR_t = (Revenue_t − O&M_t) / DS Equity cash flow = (Revenue_t − O&M_t − DS_t), year 0 = −Capex × (1 − debt share)

Case: a 54 MW onshore farm

Preset: 12 × 4.5 MW turbines (54 MW) with 300 W/m² specific power (138 m rotor), 120 m towers, 7.5 m/s mean wind at hub height and k = 2. Results:

  • Energy. Gross capacity factor 43%; losses of 15% bring net to about 36.8%, i.e. roughly 174 GWh yearly, or the consumption of 48,000 EU homes.
  • Costs. Capex at 1,400 €/kW totals €75.6 million. Fixed O&M, 42 €/kW/yr, takes €2.3 million a year before variable costs.
  • LCOE. About €54/MWh over 30 years at a 6.5% WACC.
  • Returns on a €68/MWh sale price (1.5% indexation): project IRR about 12.6%; unlevered NPV €55 million.
  • With 70% debt at 5.5% over 15 years: annual debt service €5.3 million, minimum DSCR around 1.75, equity IRR near 20% (pre-tax).

Now try 6.5 m/s. Capacity factor sinks to about 29%, LCOE rises to about the same level as the €68 PPA price, and minimum DSCR slides to a thin 1.28. Wind economics lean hard on the resource.

Interpreting the results

  • P50 is the median outcome. Lenders size debt on P90, the output exceeded in 90% of years, which for a single year is usually 8–12% lower. To mimic it, trim the capacity factor or increase the losses.
  • LCOE versus price. A price under LCOE destroys value at your discount rate, regardless of payback.
  • Project vs equity IRR. Borrowing lifts equity returns when project IRR beats the interest rate, but eats into the DSCR margin.
  • Cash-flow chart. Bars stack revenue against O&M and debt service. The right-hand line traces cumulative equity cash and crosses zero in the equity payback year.

Typical parameters

Parameter Onshore (Europe/US) Offshore
Turbine size 4–7 MW 12–15 MW
Specific power 230–330 W/m² 330–400 W/m²
Net capacity factor 28–42% 40–52%
Capex 1,100–1,800 per kW 2,500–4,500 per kW
Fixed O&M 30–55 per kW-yr 60–110 per kW-yr
Total losses 12–18% 10–15%
Debt share / tenor 60–80% / 15–18 yrs 60–75% / 15–20 yrs
Design life 25–30 yrs 25–30 yrs

Hints for better projects

  • Chase the wind data. An extra 1 m/s of mean speed shifts LCOE 20–30%, so a 12–24 month measurement campaign is cheap insurance.
  • Prefer low specific power where wind is moderate. A bigger rotor on the same generator raises capacity factor and revenue per MW and depends less on the strongest, often lowest-priced, hours.
  • Trade off layout density. Close spacing gets more MW onto a lease but costs wake loss; 4 × 7 rotor diameters is the usual start.
  • Run P90 and price-downside cases before choosing debt terms. On P50, a minimum DSCR below ~1.2 should raise concern.
  • Use the LCOE calculator to compare technologies and the wind turbine calculator to refine single-turbine yield.

What is left out

Treat the model as a first screen. Figures are pre-tax: corporate tax, depreciation and tax equity are absent. Connection charges, balancing costs, windy-hour price cannibalisation and curtailment appear only if you fold them into losses, and a single generic power curve with one loss factor stands in for a wake model. Debt is a simple annuity with no sculpting, reserve accounts or construction-period interest. Its job is to rank options and test sensitivities ahead of a bankable yield assessment and financial model.

Method & assumptions

Energy yield. First the rotor: D = √(4P/(π·SP)). For gross output at a given mean speed, integrate a generic power curve (peak Cp 0.46) against a Weibull density and multiply by 8,760 h, i.e. 8,760 h × ∫P(v)·f(v)dv, at the air density of the site's elevation. Net output is gross × (1 − losses). Money: income equals MWh × price (indexed). Costs split into fixed opex (+2%/yr) and variable opex, with decommissioning booked in the final year. LCOE = (capex + Σ opex_t/(1+r)^t) / Σ MWh_t/(1+r)^t. Financing: equity covers capex × (1 − debt share), the loan is a level annuity, and DSCR = cash flow available for debt service ÷ debt service. Land: turbines sit on a grid with spacing sx·D across and sy·D along the prevailing wind.

Frequently asked questions

What is the build cost of a wind farm?
Budget 1.1–1.8 million (EUR or USD) per MW for onshore, about two-thirds of it for the turbines themselves; the balance pays for foundations, roads, cabling, the substation and development. Offshore starts at 2.5 million and can reach 4.5 million per MW. For a 50 MW onshore site, that means 60–90 million in total.
What LCOE does onshore wind reach?
Globally, IRENA's weighted average for onshore plants commissioned in 2023 was about 0.03–0.04 USD/kWh. In Europe a typical project comes in at 40–70 EUR/MWh, moving with wind speed, capex and financing cost. Offshore generally falls between 70 and 120 EUR/MWh.
How much ground does a wind farm cover?
Its footprint, meaning the array, usually spans 15–60 hectares per MW when turbines stand 4–7 rotor diameters apart. Only about 1–3% of that (roughly 0.3–1 ha per MW) is built on: foundations, crane pads, roads, substation. Crops and livestock can stay between the turbines.
Which equity IRR is realistic for wind?
Mature markets typically see targets of 7–10% for unlevered project IRR and 10–15% for equity IRR on onshore schemes. Emerging markets and merchant (unhedged) revenue push targets up. The PPA price and permitted gearing weigh heavily on results.
What DSCR will a bank ask for?
On contracted onshore wind, lenders size debt to a minimum DSCR of about 1.25–1.35 against P50 energy, or 1.0–1.2 against P90. Merchant revenue demands a higher cushion. At a DSCR of 1.3, cash flow is 30% above the loan payment.
How many households can one wind farm supply?
Annual output divided by average household use gives the answer. A 50 MW onshore farm running at 35% capacity factor yields about 150 GWh a year. That serves roughly 40,000 EU homes at 3,600 kWh each, or 14,000 US homes at about 10,500 kWh each.
How many turbines does 100 MW take?
Using modern onshore units of 4–7 MW: about 15–25. Older 2 MW machines would have required 50. At sea, 12–15 MW turbines mean only 7–8 for 100 MW.

Sources & references

  1. IRENA — Renewable Power Generation Costs in 2023
  2. NREL Annual Technology Baseline — land-based and offshore wind costs
  3. Denholm, P., Hand, M., Jackson, M., Ong, S. (2009). Land-Use Requirements of Modern Wind Power Plants in the United States. NREL/TP-6A2-45834
  4. Short, W., Packey, D., Holt, T. (1995). A Manual for the Economic Evaluation of Energy Efficiency and Renewable Energy Technologies. NREL/TP-462-5173

Embed this calculator

Free for bloggers, installers, schools and NGOs. Copy the snippet below and it stays current by itself.