Energy finance calculator

NPV and IRR of an energy project with debt, tax and DSCR

A compact finance model for a power plant of any kind. It projects revenue, opex, the loan, tax and depreciation for each year and returns project and equity IRR, NPV, payback and debt-service cover.

Editable share link Branded PDF report Free · no sign-up

Results

Equity IRR of 14.1% clears the 10% hurdle (equity NPV +1,752,354 €), and the project IRR is 9.2% with a minimum DSCR of 1.49. Lenders should accept this.
Equity IRR
14.1%
after tax, 70% debt
Project IRR
9.2%
unlevered, after tax
Equity NPV @ 10%
€1,752,354
Project NPV @ 6.5%
€3,462,999
Equity payback
8 yr 3 mo
Min / avg DSCR
1.49 / 1.51
lenders want ≥ 1.20–1.35
Annual energy (yr 1)
26,280MWh
1,314 full-load hours
Revenue (yr 1)
€1,708,200
EBITDA margin (yr 1)
84.8%
Debt / equity
9,100,000 / 3,900,000
annual debt service 936,961 €
LCOE
55.4€/MWh
at 6.5% WACC
Capex per MW
€650,000
Yearly cash flows (€)
Running equity cash and DSCR

Cash-flow statement

YearMWhRevenueOpexEBITDAInterestPrincipalTaxEquity CFDSCR
0-3,900,000
126,2801,708,200260,0001,448,200546,000390,96150,440460,7991.49
226,1491,725,154266,5001,458,654522,542414,41957,222464,4701.5
326,0181,742,276273,1631,469,114497,677439,28464,287467,8651.5
425,8881,759,568279,9921,479,577471,320465,64171,651470,9641.5
525,7581,777,032286,9911,490,040443,382493,57979,332473,7481.51
625,6301,794,669294,1661,500,503413,767523,19487,347476,1941.51
725,5011,812,481301,5201,510,961382,375554,58695,717478,2821.51
825,3741,830,470309,0581,521,412349,100587,861104,462479,9881.51
925,2471,848,637316,7851,531,853313,828623,133113,605481,2871.51
1025,1211,866,985324,7041,542,281276,441660,521123,168482,1511.51
1124,9951,885,515332,8221,552,693236,809700,152133,177482,5551.52
1224,8701,904,229341,1431,563,086194,800742,161143,657482,4681.51
1324,7461,923,128349,6711,573,457150,271786,691154,637481,8581.51
1424,6221,942,215358,4131,583,802103,069833,892166,147480,6941.51
1524,4991,961,492367,3731,594,11853,036883,926178,217478,9411.51
1624,3771,980,959376,5581,604,40200190,8801,413,521—
1724,2552,000,620385,9711,614,64900192,9301,421,719—
1824,1332,020,477395,6211,624,85600194,9711,429,885—
1924,0132,040,530405,5111,635,01800197,0041,438,015—
2023,8932,060,782415,6491,645,13300199,0271,446,106—
2123,7732,081,235426,0401,655,19500331,0391,324,156—
2223,6542,101,892436,6911,665,20000333,0401,332,160—
2323,5362,122,753447,6091,675,14400335,0291,340,115—
2423,4182,143,821458,7991,685,02200337,0041,348,018—
2523,3012,165,099470,2691,694,83000338,9661,355,864—
  • Yearly nominal model: capex falls in year 0, the loan is an annuity (mortgage style), depreciation is straight-line, tax losses carry forward, and there is no interest during construction and no reserve accounts.
  • Shareholder cash after loan repayments and tax drives the equity IRR. The project IRR instead takes cash flows before financing, taxed as though no interest were deductible.
  • DSCR is the cash available for debt service divided by the debt service itself. Lenders usually size debt so the lowest DSCR stays above ~1.2 for contracted revenue and ~1.4 for merchant revenue.

Beyond simple payback

Plenty of online tools give you one payback number and stop. People who fund plants look elsewhere: at yearly cash after opex, tax and loan repayments, and at the net present value, internal rate of return and debt service coverage ratio that come out of it. What you have here is a small-scale version of the project-finance spreadsheets used for solar parks, wind farms and thermal plants.

Inputs fall into three groups. The plant: capacity, capacity factor, degradation, life. The economics: capex, fixed and variable opex with escalation, the electricity price with its own escalation, residual value. The financing: gearing, interest rate, tenor, tax rate, depreciation period, cost of equity and WACC. From these the tool produces a cash-flow statement and then reports:

  • Equity IRR and equity NPV, measured at your cost of equity (the sponsor’s view);
  • Project IRR and project NPV, measured at the WACC (the asset’s view, before financing);
  • Minimum and average DSCR, to judge whether a bank would lend;
  • Equity payback and LCOE.

Calculation steps

Energy_t = MW × 8,760 × CF × (1 − deg)^(t−1) EBITDA_t = Energy_t × Price₁ × (1 + esc)^(t−1) − Opex₁ × (1 + opex esc)^(t−1) − VOM × Energy_t Interest_t = Debt balance_(t−1) × rate Debt service = annuity(Debt, rate, tenor) Tax_t = max(0, EBITDA_t − Depreciation_t − Interest_t − losses carried forward) × tax rate Equity CF = EBITDA_t − Tax_t − Debt service_t DSCR_t = (EBITDA_t − Tax_t) ÷ Debt service_t NPV = Σ CF_t / (1 + r)^t IRR: the r at which NPV = 0

Sample run: 20 MW of solar

Out of the box the calculator describes a 20 MW park with a 15% capacity factor, which is 26,280 MWh in year 1. It costs 13 million to build (650,000 per MW) and carries 260,000 of annual opex that grows 2.5% a year. Output sells at 65 per MWh, with the price climbing 1.5% yearly. The loan covers 70% of cost at 6% for 15 years; tax is 20% and depreciation is straight-line over 20 years.

Results for year 1: 1.71 million revenue and 1.45 million EBITDA, an 85% margin. Debt comes to 9.1 million and costs about 937,000 a year to service, so the minimum DSCR is 1.49. The project IRR is about 9.2%, giving a project NPV near +3.5 million at a 6.5% WACC. Shareholders put in 3.9 million and earn an equity IRR of about 14.1%; at a 10% cost of equity the equity NPV is roughly +1.75 million. They get their money back after about 8.3 years, and LCOE is near 55 per MWh.

The verdict reads “bankable”: the equity return clears the 10% hurdle and DSCR stays far above the 1.20–1.35 range lenders look for. Lower the price to 55 per MWh, though, and minimum DSCR falls to 1.25 while equity IRR drops to about 9.3%. That misses the hurdle, so equity NPV turns negative while project NPV remains positive.

Interpreting the numbers

  • Compare equity IRR with your cost of equity. Higher means positive equity NPV.
  • Compare project IRR with WACC. A big equity IRR sitting on a weak project IRR will not hold up well.
  • A DSCR under 1.2 in any year hints that a lender would reduce the loan or lengthen the tenor.
  • In the cash-flow chart, each year’s revenue is split between opex, tax, the lender and shareholders.

Typical financing terms

Item Contracted (EU/US) Merchant or emerging
Gearing 65–80% 40–60%
Debt tenor 15–20 years 7–12 years
Interest rate (all-in) 4–7% 7–12%
Minimum DSCR 1.20–1.30 1.40–1.75
Cost of equity 7–10% 12–20%
Corporate tax 15–30% 15–35%

Hints for better runs

  1. Run the bad case. Lenders size debt on a P90 energy yield (−5 to −10% capacity factor) and a weaker price, so try both.
  2. Do not let the loan outlive the PPA. Any gap exposes repayments to merchant prices.
  3. Put everything in capex. That means grid connection, development fees and contingency. Equity absorbs overruns first.
  4. Model the tax shield. If accelerated depreciation applies where you build, shorten the depreciation period; equity IRR goes up.
  5. Sanity-check with LCOE. A price below LCOE at your WACC means a negative project NPV.

What is left out

Yearly steps, an annuity loan, a single price curve. No construction phase, no debt sizing or sculpting, no reserve accounts, VAT or working capital. Professional models work semi-annually, sculpt debt to a DSCR target and include P50/P90 cases, curtailment and balancing costs. Use this page to screen ideas and to learn, and get a full model built before any money is committed.

Method & assumptions

Each year is built up as follows. Energy: MW × 8,760 × CF × (1 − degradation)t−1 (CF being capacity factor). Revenue: energy times a price that rises with escalation. EBITDA: revenue less fixed opex (escalating) and variable opex. The loan accrues interest on its balance while an annuity amortises it over the tenor. Taxable income: EBITDA − depreciation − interest, with losses carried forward; cash to equity: EBITDA − tax − debt service.

Discount the flows with NPV = Σ CFt ÷ (1 + r)t; IRR is the rate r at which NPV = 0, solved by bisection. At the WACC, LCOE = PV(capex + opex) ÷ PV(energy).

Frequently asked questions

Project IRR vs equity IRR: how do they differ?
Think of project IRR as the asset's own yield, with no loan in the picture: money spent on capex, money earned after tax. Equity IRR is the yield left for owners once lenders take their share. Borrowing at a rate below what the asset earns lifts equity IRR over project IRR, though it adds risk.
Which IRR is considered healthy for solar and wind?
For contracted solar and wind in mature European and US markets, expect 6–8% unlevered project IRR (nominal, after tax) and 8–12% on equity. Where revenue is merchant, the country is an emerging market, or the project is still in development, owners demand 12–20% on equity.
What does DSCR mean and which level do lenders want?
It is the cash that can be spent on debt service in a given year, divided by the interest and principal due in that year. Contracted renewables usually need at least 1.20–1.30; merchant revenue needs 1.40–1.75. Banks size the loan so that even the P50 or P90 case does not fall under the minimum.
How is NPV calculated for an energy project?
Write down the net cash for every year: revenue minus opex and tax, and minus debt service when you are looking at equity. Year 0 holds the investment as a negative number. Each later year is divided by (1 + r)^t and the results are summed. A positive sum at your required return signals value creation.
Should the discount rate be real or nominal?
Match it to the cash flows. This model inflates prices and costs, which makes the flows nominal, so the discount rate and the IRR are nominal too. Set escalation to zero and the rates should be read as real.
Why do equity cash flows step up late in the project life?
Two things happen. Once the loan is repaid, cash that went to the bank reaches shareholders. Later, when depreciation ends, taxable income grows and tax takes a bigger bite, which can produce a second change.

Sources & references

  1. IRENA (2024). Renewable Power Generation Costs in 2023 — cost of capital and financing assumptions
  2. NREL — System Advisor Model (SAM): financial models documentation
  3. IEA (2024). Cost of Capital Observatory
  4. Yescombe, E.R. & Farquharson, E. (2018). Principles of Project Finance, 2nd ed. Academic Press

Embed this calculator

Free for bloggers, installers, schools and NGOs. Copy the snippet below and it stays current by itself.