Hydropower supplied 5.29 TWh of electricity in Bosnia and Herzegovina in 2025, which is 69th globally and 0.1% of worldwide generation.
Analysis
Hydropower accounted for 36.6% of the power mix, while the global average is 14%. A decade earlier the figure was 33.7%. Measured by share of generation, it comes 38th among 115 countries producing at least 5 TWh of electricity per year.
Output is 4.5% lower than in 2015. The peak came in 2010, at 8.03 TWh. Per head, this is about 1,685 kWh annually, against a global average of 539 kWh.
The series begins in 2000 with 5.09 TWh. The most recent year saw a 2.9% decrease from 2024. Cameroon (5.23 TWh) is the next country down the world ranking, and Cambodia (5.31 TWh) the one above. For comparison, nearby values: Montenegro 1.44 TWh, Croatia 5.77 TWh, Serbia 8.14 TWh, Slovenia 4.04 TWh, and Hungary 230 GWh. In 2025, electricity generation in Bosnia and Herzegovina totalled 14.4 TWh.
Of 6 neighbouring countries with data, Bosnia and Herzegovina is 4th for hydroelectricity, and Serbia heads the group at 8.14 TWh. Bosnia and Herzegovina makes up 0.7% of the total for Europe. The Global Power Plant Database counts 16 hydro plants in Bosnia and Herzegovina, with 2.21 GW of combined capacity. The biggest is Capljina Pumped Storage Power Plant Bosnia and Herzegovina (420 MW). Electricity values are generation in TWh, where 1 TWh equals a billion kWh.
Trends since 2000
Compared with neighbours
Neighbouring countries with hydropower figures for the latest year, shown with Europe and world totals for scale.
Where it stands in the global ranking
Hydroelectricity for the latest year, showing the countries immediately ahead of and behind Bosnia and Herzegovina.
| # | Country | TWh | World share | Year |
|---|---|---|---|---|
| 67 | Taiwan | 5.51 | 0.1% | 2025 |
| 68 | Cambodia | 5.31 | 0.1% | 2025 |
| 69 | Bosnia and Herzegovina | 5.29 | 0.1% | 2025 |
| 70 | Cameroon | 5.23 | — | 2024 |
| 71 | Uganda | 5 | — | 2024 |
Hydropower power plants
The WRI Global Power Plant Database (2021 edition) lists 16 plants here, adding up to 2.21 GW.
| # | Plant | Fuel | MW | Commissioned |
|---|---|---|---|---|
| 1 | Capljina Pumped Storage Power Plant Bosnia and Herzegovina | Hydro | 420 | — |
| 2 | Visegrad Hydroelectric Power Plant Bosnia and Herzegovina | Hydro | 315 | — |
| 3 | Dubrovnik Hydroelectric Power Plant Bosnia and Herzegovina | Hydro | 216 | — |
| 4 | Salakovac Hydroelectric Power Plant Bosnia and Herzegovina | Hydro | 210 | — |
| 5 | Jablanica Hydroelectric Power Plant Bosnia and Herzegovina | Hydro | 180 | — |
| 6 | Trebinje I Hydroelectric Power Plant Bosnia and Herzegovina | Hydro | 180 | — |
| 7 | Rama Hydroelectric Power Plant Bosnia and Herzegovina | Hydro | 160 | — |
| 8 | Grabovica Hydroelectric Power Plant Bosnia and Herzegovina | Hydro | 115 | — |
More energy data
Bosnia and Herzegovina
Calculators
Guides
Frequently asked questions
How much of Bosnia and Herzegovina's electricity is generated from hydropower?
What portion of electricity in Bosnia and Herzegovina is supplied by hydropower?
What is the origin of these numbers?
Sources & references
For Bosnia and Herzegovina, each number is the newest year the relevant dataset holds. TWh figures for output and consumption measure energy content; reserves are from the U.S. EIA and capacity is from IRENA.