OPEX
OPEX, or operating expenditure, is what it costs each year to operate and maintain an energy asset, from fixed charges per kW-year to variable ones per MWh.
Everything an asset spends on running itself year after year counts as OPEX (operating expenditure). It normally has three components:
- Fixed O&M, in USD/kW-year, is the part that ignores output: crew, scheduled servicing, insurance, land lease, property tax, grid fees and asset management.
- Variable O&M, in USD/MWh, grows with generation and includes consumables, water, wear-driven repairs and start-up costs.
- Fuel and carbon are often tracked separately from O&M.
Fixed O&M benchmarks (NREL ATB, IRENA) run as follows: utility-scale PV about 15 to 25 USD/kW-year, onshore wind 30 to 45, offshore wind 80 to 120, combined-cycle gas 15 to 30 plus 2 to 5 USD/MWh variable, and nuclear 120 to 180. Lithium-ion storage usually carries fixed O&M of 1.5 to 2.5% of CAPEX annually.
Wind and solar spend only about 15 to 30% of their lifetime cost on OPEX. Gas plants are the reverse: fuel and carbon often make up 60 to 80% of LCOE. Bigger turbines, condition monitoring and longer full-service contracts have brought wind O&M per MWh down markedly since the late 2000s. When you compute LCOE or NPV, OPEX is discounted in step with energy output. A plant's variable costs also decide its rank in the merit order.
Related terms
All terms →- CAPEX
Short for capital expenditure: the money spent up front to build an energy asset, normally stated per kW (power plants) or per kWh (storage).
- LCOE (Levelized Cost of Electricity)
The flat price per MWh that would repay every lifetime cost of a power plant, once costs and output are both discounted to present value.
- NPV (Net Present Value)
Today's value of every future cash flow a project will generate, less what it costs to build; a result above zero means the project creates value.
- Merit order
Plants lined up by rising marginal cost so the cheapest run first; the last one needed sets the market clearing price.
- Heat rate
Fuel energy a thermal plant has to burn per kWh of electricity delivered; it is efficiency turned upside down, typically stated in BTU/kWh or kJ/kWh.
- Discount rate
A yearly percentage that converts future costs and income into today's value, capturing both the time value of money and investment risk.