Grid planners used to sort power plants into three boxes. Baseload units never stopped. Mid-merit units rose and fell with the working day. Peakers waited for the worst heat or cold. The system only had one thing to forecast, which was demand. Then wind and solar arrived and made supply unpredictable too, so the boxes no longer fit. What follows covers the old vocabulary, what physically limits each plant and why planners now say “flexibility” where they once said “baseload”.
What a day of demand looks like
Consumption is lowest in the small hours, roughly 3–5 am in a temperate country. It then rises through the morning, holds steady while people work and peaks early in the evening, when lights, cooking and heating overlap. In a hot country such as Malaysia, air conditioning moves the peak to the afternoon. Weekends are quieter, and temperature drives seasonal swings.
Line up the 8,760 hours of a year from busiest to quietest and the result is a load duration curve. Reading it tells you how long each block of capacity is called on:
- Baseload (6,000–8,760 hours a year): nuclear, coal, lignite, run-of-river hydro. Building them costs a lot and fuel costs little, so you want them running all the time.
- Mid-merit, also called intermediate (2,000–6,000 hours): combined-cycle gas and newer coal. Costs are in between, and they cope with daily swings.
- Peaking (below 1,000–2,000 hours): open-cycle gas, gas engines, oil and reservoir hydro. They are inexpensive to build, expensive to operate and start fast.
The logic is financial. Heavy upfront spending needs many running hours to give a low cost per kWh, whereas a plant that was cheap to build can sit idle for months. That also explains each band’s capacity factor; the capacity factor calculator lets you check.
Physical limits of thermal plants
Three numbers matter: ramp rate (how quickly output moves), minimum stable load (the floor before shutdown) and start time. IEA and Agora Energiewende studies give these typical values, fastest first:
- Battery storage: goes from 0 to 100% in under 1 s, no minimum load, instant start.
- Reservoir hydro: reaches full output within minutes, low minimum, minutes to start.
- Gas engines: 15–20%+ of capacity per minute, ~10–30% per engine at minimum, start in under 5 min.
- Open-cycle gas turbine (OCGT): ramps 8–15% a minute, can drop to 20–50%, hot start 5–15 min.
- Combined-cycle gas (CCGT): 2–8% a minute, minimum 30–50%, hot start 30–90 min.
- Hard coal: 1.5–4% a minute, minimum 25–40%, hot start 2–4 h.
- Lignite: 1–2% a minute, minimum 40–60% in older units and ~35% once retrofitted, hot start 2–6 h.
- Nuclear in load-following service (e.g. French PWRs): 2–5% a minute inside a 50–100% band, floor ~50%, many hours to days from cold.
Plant age and design change these numbers a lot. Retrofits matter: in the 2010s Danish and German coal stations were modified to drop to 20–25% load as wind grew. France shows what design can do. Nuclear covers around two-thirds of its electricity, so its reactors were built to follow load and are throttled routinely. How a Nuclear Reactor Works explains the physics.
Net load and the duck
With wind and solar present, thermal plants no longer chase demand; they chase net load, which is demand minus variable renewable output. Take a sunny spring day in California. Net load collapses after sunrise, hits bottom near midday, then shoots up at sunset as people return home.
CAISO, the California Independent System Operator, first drew its “duck curve” in 2013 as a forecast. Reality went further. Spring midday net load ended up far under the early projections, and on some days the climb from the midday low to the evening peak passed 20 GW in about three hours. Batteries changed that after 2020. From almost nothing, California grid storage grew to well over 10 GW by 2024, charging at noon and emptying into the evening climb.
At 3% per minute, a 500 MW CCGT adds 15 MW/min, so the ramp alone needs about 6 such units ramping flat out, or batteries.
The decline of “baseload”
Wind and solar have almost no running cost, so grids use them first. In a bright or breezy hour there may be no space for a plant that must hold constant output. Operators then pick among curtailing renewables, throttling the stiff plant, exporting, storing or finding more demand. South Australia shows the extreme: on spring middays, rooftop and utility solar have sometimes exceeded 100% of state demand, and minimum operational demand has gone negative on certain days.
Dependable capacity still counts, because a cold, calm evening or a cloudy week must be covered. The change is in what is asked of it. The valuable resources can:
- swing quickly between low and high output,
- start and stop often without wear,
- stay viable at low capacity factors,
- move energy through time (storage),
- or adjust demand (Demand Response Explained).
So planners increasingly use the terms firm, flexible and variable.
Flexibility options
- Batteries: seconds to ~4 hours; fastest and getting cheaper, but short in duration.
- Pumped hydro: hours to days; large, tied to suitable sites (Hydropower Explained).
- Reservoir hydro: hours to seasons; excellent where it exists.
- Gas turbines and engines: minutes to weeks; flexible, but fossil and sensitive to gas prices.
- Interconnectors: minutes to seasons; they pool weather across regions.
- Demand response: minutes to hours; cheap if the programme is well built.
- Retrofitted thermal plants: hours; lower minimum loads, faster ramps.
Peninsular Malaysia
Coal and gas dominate here. Coal units carry much of the steady base while gas plants follow load. Grid System Operator data put recent peak demand at about 19–20 GW, up with economic growth and air conditioning, and usually reached on hot weekday afternoons. The national roadmap expands large-scale and rooftop solar. That will absorb part of the afternoon peak and push the strain into the early evening, the pattern California and Australia already show. Planned battery storage and flexible gas capacity respond to this. Background: the Malaysia electricity page and How Malaysia’s Electricity System Works.
Key points
- The three labels describe how many hours a plant is economic, not a fixed trait of its technology.
- Ramp rates and minimum loads decide how well thermal plants fit beside wind and solar.
- Dispatchable plants follow net load rather than demand, and its evening ramp is today’s design problem.
- Storage, hydro, interconnectors and demand flexibility now earn more than steady output.
Cost per MWh over each technology’s life is covered in LCOE Explained, and the LCOE calculator lets you compare.
Calculators related to this topic
Frequently asked questions
What does baseload power mean?
What is a peaker plant?
Will grids with plenty of wind and solar still need baseload plants?
What is the duck curve?
How quickly can power plants change output?
What is minimum stable load?
Sources & references
- IEA (2018). Status of Power System Transformation: Power plant flexibility
- Agora Energiewende (2017). Flexibility in thermal power plants
- CAISO: What the duck curve tells us about managing a green grid / Today's Outlook data
- OECD-NEA (2011). Technical and Economic Aspects of Load Following with Nuclear Power Plants
- Grid System Operator Malaysia: system data
The figures in this guide are typical ranges taken from the listed sources, and your own values will vary with location, prices and equipment. For estimates specific to your site, use the linked calculators.