Electricity & grids guide

HVDC and Power Transmission: How Electricity Travels Far

High-voltage lines explained: what causes losses, the distance at which HVDC overtakes AC, and major links from China's UHVDC to Viking Link and ASEAN.

Updated 6 min read 1,265 words

Where power is made and where it is used seldom coincide. Dams sit in mountain valleys, the best wind is at sea, the strongest sunshine falls on deserts, and coal stations often stand beside the mine. High-voltage lines bridge that distance. They get little attention, and in many countries they are also the hardest piece of infrastructure to get built. This guide explains the physics of transmission, what causes losses, why engineers returned to direct current, and which projects are redrawing the map of grids from Europe to Southeast Asia.

Voltage levels along the chain

A generator delivers around 10–25 kV. Near the plant, a step-up transformer lifts that to line voltage. Closer to users, substations bring it down in stages, finishing at 230 V at the socket (120 V in North America).

Region Common transmission voltages Distribution
Europe 220 kV, 380–400 kV 10–110 kV, 400/230 V
United States 115–230 kV, 345 kV, 500 kV, 765 kV 4–35 kV, 240/120 V
Peninsular Malaysia (TNB) 132 kV, 275 kV, 500 kV 11–33 kV, 400/230 V
China 220 kV, 500 kV, 1,000 kV UHV AC, ±800/±1,100 kV UHVDC 10–110 kV, 380/220 V

The reason is elementary. Power is voltage times current (P = V × I), and a conductor dissipates I²R as heat. To deliver a fixed amount of power at higher voltage you need less current, and because loss depends on current squared, it drops fast.

Line loss = I² × R, with I = P / (√3 × V × cos φ) for a three-phase line

Example: 1,000 MW over a line with R = 2.5 Ω per phase, cos φ = 1 At 220 kV: I ≈ 2,624 A → loss ≈ 3 × 2,624² × 2.5 ≈ 51.6 MW (5.2%) At 400 kV: I ≈ 1,443 A → loss ≈ 3 × 1,443² × 2.5 ≈ 15.6 MW (1.6%)

Corona discharge, transformer losses and reactive flows contribute too, but I²R is by far the largest term. The same logic at household scale is covered by the cable size and voltage drop calculator.

Losses in practice

Across the world, transmission and distribution waste roughly 8% of generated electricity, according to the World Bank, and the spread is wide: around 4–6% in Japan, South Korea, Germany and the Netherlands, against 15–25% reported by certain South Asian and sub-Saharan African networks. The higher numbers include “non-technical” losses, meaning theft and unmetered connections. Among the technical losses, distribution usually exceeds transmission, as thin low-voltage wires carry large currents over huge numbers of short lines.

Even a single percentage point is significant. On a system generating 100 TWh annually it amounts to 1 TWh, similar to what a 120 MW baseload gas plant produces in a year.

Why DC returned

In the 1880s Edison’s direct current lost out to alternating current for one reason: only AC could be stepped up to high voltage with a transformer. Power electronics removed that obstacle. Modern converter stations convert AC to high-voltage DC and reverse the process at the far end, bringing three benefits:

  1. Efficiency over distance. Skin effect and reactive power vanish, and two wires do the work of three. Expect roughly 3% loss per 1,000 km of overhead HVDC, plus 0.6–1% at every converter station.
  2. Cable capability. Think of an AC cable as one long capacitor: the longer it is, the more charging current it draws, and past about 50–80 km that current swallows most of its capacity. DC has no such problem, so almost all long subsea links use it.
  3. Joining asynchronous grids. DC ties together systems that do not run in step, like the Nordic grid and continental Europe, or the 50 Hz east and 60 Hz west of Japan.

Converter stations are the price, with each costing several hundred million dollars. That produces a break-even distance generally put at about 600–800 km overhead and 50–80 km for cables. Under it, AC is normally cheaper. The IEA’s 2023 grids report expects large volumes of both.

LCC versus VSC converters

Feature LCC (line-commutated) VSC (voltage-source)
Switching device Thyristors IGBT transistors
Largest ratings Up to about 12 GW per link About 2–3 GW per link and rising
Needs strong AC grid Yes No
Reactive power control Needs filters and compensation Built in
Black start, offshore wind No Yes
Footprint Large Compact

LCC carries China’s ultra-high-voltage corridors. Offshore wind connections, cross-border links and planned North Sea multi-terminal DC grids are mostly VSC territory.

Notable HVDC projects

Link Route and year Rating and length Notes
Changji–Guquan China, 2019 ±1,100 kV, up to 12 GW, about 3,300 km (Xinjiang to Anhui) One of dozens of UHV lines carrying coal, hydro, wind and solar power from the west and north to the coast
NordLink Norway–Germany, 2021 1,400 MW, about 620 km German wind surplus flows north, Norwegian hydropower south
North Sea Link Norway–UK, 2021 1,400 MW, about 720 km
Viking Link Denmark–UK, 2023 1,400 MW, about 765 km Longest land and subsea interconnector in the world when it opened in December 2023
SunZia USA (planned) 3 GW, roughly 880 km New Mexico wind to Arizona and California; over a decade in permitting before construction began in 2023

Many of these are interconnectors, letting adjacent markets exchange energy, pool reserves and cushion weather swings.

ASEAN Power Grid: where Malaysia fits

Since the late 1990s Southeast Asia has discussed a regional grid, and it has grown link by link. Peninsular Malaysia connects with southern Thailand and, across the Johor Strait, with Singapore. Sarawak has supplied West Kalimantan (Indonesia) over a 275 kV line from 2016. The region’s first multilateral electricity trade began in June 2022, when the Lao PDR–Thailand–Malaysia–Singapore Power Integration Project started sending up to 100 MW of Lao hydropower across four countries.

Bigger schemes are proposed. A subsea HVDC cable could bring Sarawak hydropower to Peninsular Malaysia and perhaps on to Singapore, and Singapore wants to import about 6 GW of low-carbon electricity by 2035, having issued conditional licences to projects in Indonesia, Cambodia, Vietnam and Australia. The most daring is Sun Cable’s Australia–Asia PowerLink: a subsea cable of roughly 4,300 km from the Northern Territory. Sun Cable entered administration in 2023, then passed to a new investor group and received Australian environmental approval in 2024, but the timeline is unclear. The ASEAN page and Energy in Southeast Asia cover the wider region.

Permits, not steel, hold lines back

Hardware is not what delays new lines; approvals are. Germany’s 700 km SuedLink, designed to carry northern wind power southward, was redesigned as underground cable after local opposition, and is now expected around 2028, years later than first planned. In the US, Lawrence Berkeley National Laboratory’s “Queued Up” data showed about 2,600 GW of generation and storage waiting for a grid connection at the end of 2023, with typical projects spending around five years in the queue. The IEA estimated in 2023 that adding or refurbishing about 80 million km of lines by 2040 is needed, which is roughly the whole of today’s global grid.

Takeaways

  • Higher voltage means lower current, and loss follows current squared.
  • Advanced grids lose 4–8% typically; where theft is common the number is far larger.
  • HVDC is worthwhile for long overhead routes, long cables and links between unsynchronised grids.
  • VSC converters open the door to offshore grids and meshed DC networks.
  • Planning and permits, rather than technology, determine how soon new lines appear.

On the power plants map you can see where big stations lie relative to demand. Once the power arrives, Grid Frequency and Balancing explains how frequency stays stable.

Calculators related to this topic

Frequently asked questions

Why do power lines run at such high voltage?
Current is the enemy: heat in a conductor rises with its square. Double the voltage for a given power and current halves, which leaves a quarter of the losses. For that reason long-distance bulk power uses 132–765 kV and transformers lower it again near customers.
What share of electricity disappears between power plant and customer?
World Bank data point to roughly 8% globally. Europe, Japan and Korea manage around 4–7% on well-run networks, while some South Asian, African and Latin American systems waste 15–20% or more, in part through theft and unbilled use.
In which cases does HVDC make more sense than AC?
Three situations favour it: overhead lines longer than roughly 600–800 km, cables under the sea or ground beyond about 50–80 km, and connections between grids that are not synchronised, including those at different frequencies. Under those distances, paying for two converter stations normally makes AC cheaper.
Which HVDC line is the longest?
The Changji–Guquan line in China, commissioned in 2019. It stretches about 3,300 km from Xinjiang to Anhui, operates at ±1,100 kV and transmits up to 12 GW, making it the top HVDC link for both voltage and distance.
What separates LCC from VSC HVDC?
LCC (line-commutated converters) use thyristors. They are proven for the largest power ratings but depend on a strong AC grid at both terminals. VSC (voltage-source converters) use IGBT transistors and can regulate reactive power, tie in weak grids and offshore wind farms, black-start a dead grid and form multi-terminal networks.
Are the ASEAN countries linked by a common grid?
Partially. The ASEAN Power Grid has been planned for years as a set of bilateral interconnections, and some are working, for example Malaysia to Thailand and to Singapore. Since 2022 hydropower of up to 100 MW has flowed between four countries under the Lao PDR–Thailand–Malaysia–Singapore project.

Sources & references

  1. World Bank: Electric power transmission and distribution losses (% of output)
  2. IEA (2023). Electricity Grids and Secure Energy Transitions
  3. Lawrence Berkeley National Laboratory: Queued Up: interconnection queue data
  4. ASEAN Centre for Energy: ASEAN Power Grid
  5. National Grid: Viking Link interconnector

The figures in this guide are typical ranges taken from the listed sources, and your own values will vary with location, prices and equipment. For estimates specific to your site, use the linked calculators.