Where power is made and where it is used seldom coincide. Dams sit in mountain valleys, the best wind is at sea, the strongest sunshine falls on deserts, and coal stations often stand beside the mine. High-voltage lines bridge that distance. They get little attention, and in many countries they are also the hardest piece of infrastructure to get built. This guide explains the physics of transmission, what causes losses, why engineers returned to direct current, and which projects are redrawing the map of grids from Europe to Southeast Asia.
Voltage levels along the chain
A generator delivers around 10–25 kV. Near the plant, a step-up transformer lifts that to line voltage. Closer to users, substations bring it down in stages, finishing at 230 V at the socket (120 V in North America).
| Region | Common transmission voltages | Distribution |
|---|---|---|
| Europe | 220 kV, 380–400 kV | 10–110 kV, 400/230 V |
| United States | 115–230 kV, 345 kV, 500 kV, 765 kV | 4–35 kV, 240/120 V |
| Peninsular Malaysia (TNB) | 132 kV, 275 kV, 500 kV | 11–33 kV, 400/230 V |
| China | 220 kV, 500 kV, 1,000 kV UHV AC, ±800/±1,100 kV UHVDC | 10–110 kV, 380/220 V |
The reason is elementary. Power is voltage times current (P = V × I), and a conductor dissipates I²R as heat. To deliver a fixed amount of power at higher voltage you need less current, and because loss depends on current squared, it drops fast.
Example: 1,000 MW over a line with R = 2.5 Ω per phase, cos φ = 1 At 220 kV: I ≈ 2,624 A → loss ≈ 3 × 2,624² × 2.5 ≈ 51.6 MW (5.2%) At 400 kV: I ≈ 1,443 A → loss ≈ 3 × 1,443² × 2.5 ≈ 15.6 MW (1.6%)
Corona discharge, transformer losses and reactive flows contribute too, but I²R is by far the largest term. The same logic at household scale is covered by the cable size and voltage drop calculator.
Losses in practice
Across the world, transmission and distribution waste roughly 8% of generated electricity, according to the World Bank, and the spread is wide: around 4–6% in Japan, South Korea, Germany and the Netherlands, against 15–25% reported by certain South Asian and sub-Saharan African networks. The higher numbers include “non-technical” losses, meaning theft and unmetered connections. Among the technical losses, distribution usually exceeds transmission, as thin low-voltage wires carry large currents over huge numbers of short lines.
Even a single percentage point is significant. On a system generating 100 TWh annually it amounts to 1 TWh, similar to what a 120 MW baseload gas plant produces in a year.
Why DC returned
In the 1880s Edison’s direct current lost out to alternating current for one reason: only AC could be stepped up to high voltage with a transformer. Power electronics removed that obstacle. Modern converter stations convert AC to high-voltage DC and reverse the process at the far end, bringing three benefits:
- Efficiency over distance. Skin effect and reactive power vanish, and two wires do the work of three. Expect roughly 3% loss per 1,000 km of overhead HVDC, plus 0.6–1% at every converter station.
- Cable capability. Think of an AC cable as one long capacitor: the longer it is, the more charging current it draws, and past about 50–80 km that current swallows most of its capacity. DC has no such problem, so almost all long subsea links use it.
- Joining asynchronous grids. DC ties together systems that do not run in step, like the Nordic grid and continental Europe, or the 50 Hz east and 60 Hz west of Japan.
Converter stations are the price, with each costing several hundred million dollars. That produces a break-even distance generally put at about 600–800 km overhead and 50–80 km for cables. Under it, AC is normally cheaper. The IEA’s 2023 grids report expects large volumes of both.
LCC versus VSC converters
| Feature | LCC (line-commutated) | VSC (voltage-source) |
|---|---|---|
| Switching device | Thyristors | IGBT transistors |
| Largest ratings | Up to about 12 GW per link | About 2–3 GW per link and rising |
| Needs strong AC grid | Yes | No |
| Reactive power control | Needs filters and compensation | Built in |
| Black start, offshore wind | No | Yes |
| Footprint | Large | Compact |
LCC carries China’s ultra-high-voltage corridors. Offshore wind connections, cross-border links and planned North Sea multi-terminal DC grids are mostly VSC territory.
Notable HVDC projects
| Link | Route and year | Rating and length | Notes |
|---|---|---|---|
| Changji–Guquan | China, 2019 | ±1,100 kV, up to 12 GW, about 3,300 km (Xinjiang to Anhui) | One of dozens of UHV lines carrying coal, hydro, wind and solar power from the west and north to the coast |
| NordLink | Norway–Germany, 2021 | 1,400 MW, about 620 km | German wind surplus flows north, Norwegian hydropower south |
| North Sea Link | Norway–UK, 2021 | 1,400 MW, about 720 km | |
| Viking Link | Denmark–UK, 2023 | 1,400 MW, about 765 km | Longest land and subsea interconnector in the world when it opened in December 2023 |
| SunZia | USA (planned) | 3 GW, roughly 880 km | New Mexico wind to Arizona and California; over a decade in permitting before construction began in 2023 |
Many of these are interconnectors, letting adjacent markets exchange energy, pool reserves and cushion weather swings.
ASEAN Power Grid: where Malaysia fits
Since the late 1990s Southeast Asia has discussed a regional grid, and it has grown link by link. Peninsular Malaysia connects with southern Thailand and, across the Johor Strait, with Singapore. Sarawak has supplied West Kalimantan (Indonesia) over a 275 kV line from 2016. The region’s first multilateral electricity trade began in June 2022, when the Lao PDR–Thailand–Malaysia–Singapore Power Integration Project started sending up to 100 MW of Lao hydropower across four countries.
Bigger schemes are proposed. A subsea HVDC cable could bring Sarawak hydropower to Peninsular Malaysia and perhaps on to Singapore, and Singapore wants to import about 6 GW of low-carbon electricity by 2035, having issued conditional licences to projects in Indonesia, Cambodia, Vietnam and Australia. The most daring is Sun Cable’s Australia–Asia PowerLink: a subsea cable of roughly 4,300 km from the Northern Territory. Sun Cable entered administration in 2023, then passed to a new investor group and received Australian environmental approval in 2024, but the timeline is unclear. The ASEAN page and Energy in Southeast Asia cover the wider region.
Permits, not steel, hold lines back
Hardware is not what delays new lines; approvals are. Germany’s 700 km SuedLink, designed to carry northern wind power southward, was redesigned as underground cable after local opposition, and is now expected around 2028, years later than first planned. In the US, Lawrence Berkeley National Laboratory’s “Queued Up” data showed about 2,600 GW of generation and storage waiting for a grid connection at the end of 2023, with typical projects spending around five years in the queue. The IEA estimated in 2023 that adding or refurbishing about 80 million km of lines by 2040 is needed, which is roughly the whole of today’s global grid.
Takeaways
- Higher voltage means lower current, and loss follows current squared.
- Advanced grids lose 4–8% typically; where theft is common the number is far larger.
- HVDC is worthwhile for long overhead routes, long cables and links between unsynchronised grids.
- VSC converters open the door to offshore grids and meshed DC networks.
- Planning and permits, rather than technology, determine how soon new lines appear.
On the power plants map you can see where big stations lie relative to demand. Once the power arrives, Grid Frequency and Balancing explains how frequency stays stable.
Calculators related to this topic
Frequently asked questions
Why do power lines run at such high voltage?
What share of electricity disappears between power plant and customer?
In which cases does HVDC make more sense than AC?
Which HVDC line is the longest?
What separates LCC from VSC HVDC?
Are the ASEAN countries linked by a common grid?
Sources & references
The figures in this guide are typical ranges taken from the listed sources, and your own values will vary with location, prices and equipment. For estimates specific to your site, use the linked calculators.