Each year the plant supplies 1,462,500 ton-hours of cooling and draws 1,608,750 kWh (1.1 kW/TR with auxiliaries included), which costs 225,225 €. Switching to a 0.52 kW/TR chiller would cut 67,568 € a year, with payback in 3.3 years.
Annual electricity cost
€225,225
1,608,750 kWh per year
Chiller COP
4.14
EER 14.1 Btu/Wh
Plant efficiency
1.1kW/TR
plant COP 3.2
Cooling capacity
1,758kW
500 TR
Average electrical demand
358kW
Cost per ton-hour
0.154€/TRh
Yearly saving from the new chiller
€67,568
482,625 kWh
Simple payback
3.3years
CO₂ per year
968t
291 t avoided by upgrading
Yearly cost by chiller efficiency (€)
Electricity use by component (kWh)

Efficiency conversions

kW/TRCOPEER (Btu/Wh)Cost per year (€)
0.457.8226.7143,325
0.57.0324153,563
0.556.3921.8163,800
0.65.8620174,038
0.75.0217.1194,513
0.84.415214,988
13.5212255,938
1.22.9310296,888
  • A single average kW/TR drives the result. In practice a chiller performs better at part load or when condenser water is cooler, so if you need precision, work from the IPLV/NPLV rating or an hourly load profile.
  • Emissions use the average lifecycle grid intensity of the chosen country (OWID/Ember).

Why the chiller plant matters

Chilled water frequently drives 40–60% of the electricity bill in malls and office towers across Malaysia, Singapore or the Gulf. With the IEA’s Future of Cooling report expecting cooling demand to keep rising, efficient plants matter to owners and grids alike.

The yardstick is kW per ton of refrigeration (kW/TR): the lower it is, the less power you pay for each unit of cooling. Four inputs drive the tool (capacity, average load, annual hours, kW/TR). It prices your current chiller in kWh, money and CO₂, then repeats the exercise for a better one.

The formula

Cooling delivered (TR·h) = capacity (TR) × average load × hours Electricity (kWh) = TR·h × (chiller kW/TR + auxiliary kW/TR)

COP = 3.517 ÷ kW/TR EER (Btu/Wh) = 12 ÷ kW/TR 1 TR = 12,000 Btu/h = 3.517 kW

Saving = TR·h × (kW/TR_old − kW/TR_new) × price Payback = new chiller cost ÷ annual saving

Pumps for chilled and condenser water, plus the tower fans, make up the auxiliary term at 0.15–0.35 kW/TR combined. An air-cooled machine has no condenser pumps or tower, and its fans are already counted in the quoted kW/TR.

Worked example

The case: an office building with a 500 TR chiller built in the 1990s (0.85 kW/TR). Pumps and towers add 0.25 kW/TR. Average load is 65%, operation 4,500 hours a year, tariff 0.14/kWh.

Step Calculation Result
Cooling delivered 500 × 0.65 × 4,500 1.46 million ton-hours
Electricity 1.46 million × (0.85 + 0.25) 1.61 GWh, about 225,000 a year
Cost per ton-hour 225,000 ÷ 1.46 million 0.154
COP, chiller alone 3.517 ÷ 0.85 4.14
COP, whole plant 3.517 ÷ 1.10 3.2

A magnetic-bearing centrifugal rated 0.52 kW/TR would take 483,000 kWh off the meter, worth about 67,600 a year. Priced at 450 per TR installed (225,000), the project returns its cost in roughly 3.3 years. Carbon follows too: with Malaysia’s grid at about 600 g CO₂/kWh lifecycle, that is around 290 t CO₂ avoided each year.

Typical efficiencies

Chiller type Full-load kW/TR Typical IPLV kW/TR COP (full load)
Air-cooled scroll / screw 1.0–1.3 0.75–1.0 2.7–3.5
Water-cooled screw 0.60–0.75 0.45–0.60 4.7–5.9
Water-cooled centrifugal 0.50–0.60 0.35–0.50 5.9–7.0
Magnetic-bearing centrifugal 0.50–0.58 0.30–0.40 6.1–7.0
Centrifugal from the 1990s 0.75–0.95 0.60–0.80 3.7–4.7

These ranges are a guide. For a specific model, look up its AHRI-certified rating. Each new edition of ASHRAE 90.1 raises the minimum efficiencies.

What each result means

Output What it tells you
Yearly electricity cost The headline figure. A new chiller often costs roughly one year of this bill.
Plant kW/TR Includes pumps and towers. Below 0.75 is efficient in the tropics; above 1.0 usually leaves plenty to save.
Cost per ton-hour Useful for billing tenants or checking a district-cooling offer.
Doughnut chart Splits chiller from pumps and towers. Variable-speed drives and better controls can shrink the auxiliary slice a great deal.

Pump drives have a calculator of their own: motor energy savings.

Savings without buying a chiller

Measure Effect
Raise the chilled-water temperature, within comfort and dehumidification limits About 2–3% better chiller efficiency per 1 °C
Maintain the towers and keep condenser tubes clean Cooler condenser water
Variable-speed drives on pumps and tower fans; run only as many chillers as the load needs Lower auxiliary power
Thermal storage under a time-of-use tariff Moves cooling to cheap hours

Storage economics are covered by the time-of-use savings calculator.

Limitations

One average kW/TR is a simplification. Real efficiency moves with load, condenser-water temperature and the chilled-water set point, so for a large investment use IPLV/NPLV, or even better an hourly simulation fed with measured loads. Peak demand charges are not counted here, yet a leaner plant lowers peak kW as well; put a number on that with the demand charge calculator. Left out too: refrigerant changes, maintenance savings, incentives.

Method & assumptions

Ton-hours of cooling = capacity (TR) × mean load × running hours. Power bought = ton-hours × (kW/TR of the chiller + kW/TR of auxiliaries). Converting the efficiency: COP = 3.517 ÷ kW/TR and EER = 12 ÷ kW/TR. A saving is ton-hours × (old − new kW/TR) × price, and payback is the new chiller's cost ÷ annual saving.

Frequently asked questions

Turning kW/TR into COP or EER
COP is 3.517 divided by kW/TR, since 1 ton of refrigeration delivers 3.517 kW of cooling. Plug in 0.6 and you get 5.86; plug in 1.2 and you get 2.93. EER (Btu/Wh) comes from 12 divided by kW/TR.
What counts as a good chiller efficiency?
For a water-cooled centrifugal, 0.50–0.60 kW/TR at full load is good. Part-load figures (IPLV) drop to 0.35–0.45 for magnetic-bearing and variable-speed designs. Screw chillers cooled by water land around 0.6–0.75, air-cooled ones around 1.0–1.3. Pumps and towers push a whole-plant number up by another 0.15–0.35.
Annual electricity of a 500-ton plant
At 0.6 kW/TR and full load the compressors pull about 300 kW, and pumps plus towers add 100–150 kW more. Run a plant of 0.85 + 0.25 kW/TR for 4,500 h at a 65% average load and the meter shows roughly 1.6 GWh per year.
Ton of refrigeration, explained
Picture the heat removed to freeze one short ton of water at 0 °C within a day: 12,000 Btu/h, or 3.517 kW. The unit has no link to the machine's weight.
Replace the old chiller or keep running it?
Hours of operation decide. A 1990s unit at 0.85 kW/TR swapped for a 0.52 kW/TR model uses about 40% less chiller energy. Hot climates and 24-hour buildings often recover the cost in 3–6 years; offices in mild climates can wait more than 10.
IPLV in plain terms
It averages efficiency measured at 100%, 75%, 50% and 25% load, using AHRI 550/590 test conditions. Because most operating hours fall at part load, this single number tracks annual energy more closely than full-load kW/TR. NPLV is the version for non-standard conditions.

Sources & references

  1. AHRI Standard 550/590 — Performance rating of water-chilling and heat pump water-heating packages
  2. ASHRAE Standard 90.1 — Energy Standard for Sites and Buildings (chiller minimum efficiencies)
  3. US DOE FEMP — Purchasing energy-efficient water-cooled chillers
  4. IEA — The Future of Cooling

Embed this calculator

Free for bloggers, installers, schools and NGOs. Copy the snippet below and it stays current by itself.