Why the chiller plant matters
Chilled water frequently drives 40–60% of the electricity bill in malls and office towers across Malaysia, Singapore or the Gulf. With the IEA’s Future of Cooling report expecting cooling demand to keep rising, efficient plants matter to owners and grids alike.
The yardstick is kW per ton of refrigeration (kW/TR): the lower it is, the less power you pay for each unit of cooling. Four inputs drive the tool (capacity, average load, annual hours, kW/TR). It prices your current chiller in kWh, money and CO₂, then repeats the exercise for a better one.
The formula
COP = 3.517 ÷ kW/TR EER (Btu/Wh) = 12 ÷ kW/TR 1 TR = 12,000 Btu/h = 3.517 kW
Saving = TR·h × (kW/TR_old − kW/TR_new) × price Payback = new chiller cost ÷ annual saving
Pumps for chilled and condenser water, plus the tower fans, make up the auxiliary term at 0.15–0.35 kW/TR combined. An air-cooled machine has no condenser pumps or tower, and its fans are already counted in the quoted kW/TR.
Worked example
The case: an office building with a 500 TR chiller built in the 1990s (0.85 kW/TR). Pumps and towers add 0.25 kW/TR. Average load is 65%, operation 4,500 hours a year, tariff 0.14/kWh.
| Step | Calculation | Result |
|---|---|---|
| Cooling delivered | 500 × 0.65 × 4,500 | 1.46 million ton-hours |
| Electricity | 1.46 million × (0.85 + 0.25) | 1.61 GWh, about 225,000 a year |
| Cost per ton-hour | 225,000 ÷ 1.46 million | 0.154 |
| COP, chiller alone | 3.517 ÷ 0.85 | 4.14 |
| COP, whole plant | 3.517 ÷ 1.10 | 3.2 |
A magnetic-bearing centrifugal rated 0.52 kW/TR would take 483,000 kWh off the meter, worth about 67,600 a year. Priced at 450 per TR installed (225,000), the project returns its cost in roughly 3.3 years. Carbon follows too: with Malaysia’s grid at about 600 g CO₂/kWh lifecycle, that is around 290 t CO₂ avoided each year.
Typical efficiencies
| Chiller type | Full-load kW/TR | Typical IPLV kW/TR | COP (full load) |
|---|---|---|---|
| Air-cooled scroll / screw | 1.0–1.3 | 0.75–1.0 | 2.7–3.5 |
| Water-cooled screw | 0.60–0.75 | 0.45–0.60 | 4.7–5.9 |
| Water-cooled centrifugal | 0.50–0.60 | 0.35–0.50 | 5.9–7.0 |
| Magnetic-bearing centrifugal | 0.50–0.58 | 0.30–0.40 | 6.1–7.0 |
| Centrifugal from the 1990s | 0.75–0.95 | 0.60–0.80 | 3.7–4.7 |
These ranges are a guide. For a specific model, look up its AHRI-certified rating. Each new edition of ASHRAE 90.1 raises the minimum efficiencies.
What each result means
| Output | What it tells you |
|---|---|
| Yearly electricity cost | The headline figure. A new chiller often costs roughly one year of this bill. |
| Plant kW/TR | Includes pumps and towers. Below 0.75 is efficient in the tropics; above 1.0 usually leaves plenty to save. |
| Cost per ton-hour | Useful for billing tenants or checking a district-cooling offer. |
| Doughnut chart | Splits chiller from pumps and towers. Variable-speed drives and better controls can shrink the auxiliary slice a great deal. |
Pump drives have a calculator of their own: motor energy savings.
Savings without buying a chiller
| Measure | Effect |
|---|---|
| Raise the chilled-water temperature, within comfort and dehumidification limits | About 2–3% better chiller efficiency per 1 °C |
| Maintain the towers and keep condenser tubes clean | Cooler condenser water |
| Variable-speed drives on pumps and tower fans; run only as many chillers as the load needs | Lower auxiliary power |
| Thermal storage under a time-of-use tariff | Moves cooling to cheap hours |
Storage economics are covered by the time-of-use savings calculator.
Limitations
One average kW/TR is a simplification. Real efficiency moves with load, condenser-water temperature and the chilled-water set point, so for a large investment use IPLV/NPLV, or even better an hourly simulation fed with measured loads. Peak demand charges are not counted here, yet a leaner plant lowers peak kW as well; put a number on that with the demand charge calculator. Left out too: refrigerant changes, maintenance savings, incentives.
Method & assumptions
Ton-hours of cooling = capacity (TR) × mean load × running hours. Power bought = ton-hours × (kW/TR of the chiller + kW/TR of auxiliaries). Converting the efficiency: COP = 3.517 ÷ kW/TR and EER = 12 ÷ kW/TR. A saving is ton-hours × (old − new kW/TR) × price, and payback is the new chiller's cost ÷ annual saving.
Frequently asked questions
Turning kW/TR into COP or EER
What counts as a good chiller efficiency?
Annual electricity of a 500-ton plant
Ton of refrigeration, explained
Replace the old chiller or keep running it?
IPLV in plain terms
Sources & references
Embed this calculator
Free for bloggers, installers, schools and NGOs. Copy the snippet below and it stays current by itself.