Where the electricity goes
Around 70% of industrial electricity, and about half of all electricity worldwide, ends up in motors. In some sectors the IEA’s motor systems work suggests the share is higher still. A motor on two shifts may use three or four times its purchase price in energy per year. A few points of efficiency, or better control of flow, therefore often repay faster than any other plant upgrade.
You give the tool two motors, the one installed and a better candidate, and it assigns each the minimum efficiency of its IEC 60034-30-1 class. If a valve or damper currently chokes the flow of a fan or pump, a speed drive can be added to the comparison too. Results show yearly kWh, cost and CO₂ per step, and how soon the total spend returns.
How it is calculated
With a drive (fans, pumps): throttled shaft power ≈ P_design × (0.55 + 0.45 × Q) speed-controlled ≈ P_design × Q^n ÷ η_drive n = 2–3, η_drive = 0.97
Annual kWh = P_in × hours Saving = (kWh_old − kWh_new) × price Payback = installed cost ÷ annual saving
Class efficiencies come from interpolating the IEC 60034-30-1 values (4-pole, 50 Hz) at your rated power, and losses for IE5 are set 20% under those of IE4. A basic curve models valve or damper throttling; outlet dampers and bypass control deviate from it slightly.
Worked case: pump motor and drive
In the preset, an aging IE1 37 kW pump motor (75% load, 6,000 hours a year) gives way to an IE4 motor plus a drive. The pump seldom needs more than 70% of design flow.
| Step | Calculation | Result |
|---|---|---|
| Today | shaft 27.75 kW ÷ 0.912 | 30.4 kW drawn, 182,600 kWh a year, about 27,400 at 0.15/kWh |
| IE4 motor alone | 27.75 ÷ 0.952 | 29.1 kW, saving about 7,700 kWh (1,150) a year |
| Add the drive | design-point shaft 27.75 ÷ 0.865 = 32.1 kW; at 70% flow and exponent 2.5, 32.1 × 0.41 | 13.2 kW shaft, 14.2 kW at the meter |
| Outcome | whole year | 85,500 kWh, 53% lower, worth about 14,600 a year and 44 t of CO₂ at the world average grid intensity; the 9,500 outlay is back in roughly 8 months |
A few percent from the motor, tens of percent from fitting speed to the actual load: that split is common. Load the IE2 → IE3 preset for a conveyor at 4,000 hours with the drive off and payback exceeds 12 years, so that motor should simply be replaced when it fails.
Minimum efficiency by class (4-pole, 50 Hz)
| IE4 | IE3 | IE2 | IE1 | Rated power |
|---|---|---|---|---|
| 87.2% | 84.1% | 81.4% | 75.0% | 1.1 kW |
| 91.1% | 88.6% | 86.6% | 83.1% | 4 kW |
| 93.3% | 91.4% | 89.8% | 87.6% | 11 kW |
| 95.2% | 93.9% | 92.7% | 91.2% | 37 kW |
| 96.1% | 95.2% | 94.2% | 93.0% | 90 kW |
| 96.7% | 96.0% | 95.1% | 94.0% | 200 kW and above |
Motors built for 60 Hz in North America (NEMA Premium ≈ IE3) show somewhat higher values at equal power.
Practical steps
- Look at the duty before the motor. Throttled pumps and fans, oversized motors idling at 30–40% load, and equipment running with nothing to do waste more than the motor’s internal losses.
- Replace rather than rewind small and mid-size motors in heavy service. The premium of an IE3/IE4 unit over a rewind normally repays quickly.
- Check power factor. Part-loaded motors perform poorly on it; try the power factor correction calculator.
- Hunt compressed-air leaks. Compressed air frequently ranks as the priciest utility a motor can drive. Price your leaks with the compressed air leak calculator.
Limitations
| Limit | What it means |
|---|---|
| Class minimums, full load | Many real motors do better; efficiency falls steeply below about 50% load |
| Drive losses | A drive adds 2–4% losses plus harmonics, and saves nothing on constant-torque loads at full speed |
| Generic throttling model | A real drive study needs measured flow and pressure |
| CO₂ | Follows the average grid intensity of the country you select |
Method & assumptions
The motor draws shaft power ÷ motor efficiency, with shaft power = rated kW × load, and the efficiency is taken from the IEC 60034-30-1 class limits for its rating (log-interpolated). A drive turns a throttled operating point into a speed-controlled one: P ∝ Qn (affinity laws, n = 2–3), with 97% drive efficiency. ΔkWh × price is the saving, installed cost ÷ annual saving is the payback, and CO₂ follows the chosen grid's average intensity.
Frequently asked questions
What does an IE2-to-IE4 upgrade save in kWh?
Which efficiency classes exist for electric motors?
What savings do speed drives bring to pumps and fans?
Should a healthy old motor be replaced early?
Why is a motor's power bill larger than its price tag?
Does rewinding reduce motor efficiency?
Sources & references
- IEC 60034-30-1:2014 — Efficiency classes of line-operated AC motors (IE code)
- EU Commission Regulation 2019/1781 — Ecodesign requirements for electric motors and variable speed drives
- US DOE — Improving Motor and Drive System Performance: A Sourcebook for Industry
- IEA 4E Electric Motor Systems Platform (EMSA)