Electrical engineering calculator

Correct your power factor: capacitor size in kVAr and µF, and what it saves

Sizes the capacitor bank (kVAr and µF per phase) that takes a load from its current power factor to the target. Outputs: lower current and kVA, released transformer capacity, reduced cable losses, savings on kVA demand, kVArh or low-PF charges, and payback.

Editable share link Branded PDF report Free · no sign-up

Results

Correcting 250 kW from PF 0.78 to 0.95 takes 118.4 kVAr of capacitance, so fit a 125 kVAr bank. That cuts the line current from 463 A to 380 A and frees 57 kVA of capacity. Monthly tariff savings of around 786 € recover the bank cost within 4.8 months.
Capacitor required
118.4kVAr
closest standard bank size: 125 kVAr
Capacitance for each phase (delta)
785µF
2,355 µF per phase in star
Current before
463A
Current after
380A
−18%
Apparent power before
321kVA
Apparent power after
263kVA
Reactive power before
201kVAr
82 kVAr after
Cut in I²R losses
33%
Monthly tariff saving
€688
57.4 kVA of maximum demand removed
Loss saving per month
€97.76
Capacitor bank cost
€3,750
Simple payback
4.8months
9,432 € saved per year
kVAr required by target power factor
Current and kVA, before versus after

kVAr-per-kW factor (tan φ1 − tan φ2)

Present PFto 0.9to 0.92to 0.95to 0.98to 1
0.60.8490.9071.0051.131.333
0.650.6850.7430.840.9661.169
0.70.5360.5940.6920.8171.02
0.750.3980.4560.5530.6790.882
0.80.2660.3240.4210.5470.75
0.850.1350.1940.2910.4170.62
0.9—0.0580.1560.2810.484
  • Plants with many variable-speed drives, inverters or other sources of harmonics risk resonance with plain capacitors. Pick detuned banks with series reactors, or install active filters.
  • Aim for 0.95–0.98, not 1.0. At light load a fixed bank can drive PF leading and lift the voltage, whereas automatic stepped banks follow the load.

What a poor power factor costs you

Magnetising current does no work, yet motors, transformers and fluorescent ballasts all need it, and it shuttles back and forth in the wiring. This reactive part (kVAr) loads each cable, switchboard and transformer on the path from generator to machine. Power factor (PF) compares useful kW with apparent kVA, as a fraction. Take PF 0.78: the line carries 28% more current than a resistive load of equal kW would need.

There are three ways a utility can bill for it:

  • Peak demand measured in kVA rather than kW.
  • Reactive energy (kVArh), once consumption passes a free allowance.
  • A penalty surcharge if the monthly PF dips under a set limit, often 0.85 or 0.9.

A capacitor bank installed at the plant makes the reactive power on the spot, which keeps it away from the meter.

Equations

φ = arccos(PF) Q_c = P × (tan φ1 − tan φ2) (kVAr)

C per phase (delta) = Q_c ÷ (3 × 2πf × V_LL²) C per phase (star) = 3 × C_delta

S = P ÷ PF I = S ÷ (√3 × V_LL) Loss reduction = 1 − (PF1 ÷ PF2)²

A lookup table sits under the results. It lists the multiplier in kVAr per kW (tan φ1 − tan φ2) for common starting and target power factors, as capacitor catalogues do.

Example: a factory at PF 0.78

Start with a plant at 250 kW average and PF 0.78, 400 V, 50 Hz. Its monthly bill carries 12 per kVA of maximum demand.

Quantity Working Result
Capacitor size tan φ1 = 0.802, tan φ2 (PF 0.95) = 0.329, so 250 × 0.473 118 kVAr; next standard size is a 125 kVAr automatic bank
Delta capacitance 118,400 ÷ (3 × 314.2 × 400²) 785 µF per phase
Apparent power 321 kVA down to 263 kVA 57 kVA freed on the supply transformer
Current 463 A down to 380 A 83 A less
Demand charge 57.4 kVA × 12 688 a month saved
Loss saving 33% cut, 2% network losses, 0.15/kWh, 400 hours about 98 a month
Payback bank at 30 per kVAr costs 3,750 about five months

The two other presets bill differently. The first uses a reactive-energy tariff that allows tan φ = 0.4 free (a PF of about 0.93, a common European rule) and charges 500 kW at PF 0.82 for about 60,000 kVArh a month. The last applies a 1.5% surcharge on the bill for each 0.01 below PF 0.85, a scheme used by several Asian utilities, including TNB in Malaysia for many customer classes.

Power factors of common loads

Load Typical PF
Induction motor, full load 0.80–0.90
Induction motor, 50% load 0.65–0.80
Induction motor, idling 0.10–0.30
Welding transformer 0.40–0.60
Variable-speed drive (input) 0.92–0.97 displacement, lower true PF with harmonics
LED lighting with good driver 0.90–0.98
Resistive heating 1.0

Oversized, lightly loaded motors are the chief cause of poor PF in plants, so fitting motor size to the load helps as much as capacitors do. The motor energy savings calculator is the place for that.

Reading the results

  • Capacitor required: the reactive power, in kVAr, that your average load calls for. The automatic bank you buy needs steps covering your lightest and heaviest load.
  • Current after: the relief for cables and switchgear, which at times is enough to put off a transformer upgrade. Test it in the transformer sizing calculator.
  • Tariff saving: set wholly by your billing method. If your bill has no kVA, kVArh or PF item, only the saving from lower losses is left.
  • Simple payback: often below two years when you are charged for reactive power.

Model limits

The tool treats your plant as one average load. In practice load changes through the day, and the reactive charge follows integrated kVArh or peak kVA across the billing period. There is no harmonic model: where drives and inverters are many, plain capacitors may resonate, and the fix is a detuned bank or an active filter. Follow IEC 60831 or the local code for capacitor voltage rating, discharge resistors and protection. A plain kVA to kW conversion is quicker in kVA to kW.

Method & assumptions

Start from the reactive power to remove: Qc = P × (tan φ1 − tan φ2), with φ = arccos(PF). A delta-connected three-phase bank needs C = Qc ÷ (3 × 2πf × VLL²) per phase, and wiring the same bank in star calls for three times that capacitance. Line current is I = P ÷ (√3 × V × PF). Since losses track I², the saving in losses is 1 − (PF1/PF2)². What you save on the tariff then follows the billing method you choose.

Frequently asked questions

How do I find the kVAr needed to correct power factor?
The size of the bank follows from two tangents: Qc = kW × (tan φ1 − tan φ2), with φ taken as arccos(PF), multiplied by your real power. For a 250 kW load going from PF 0.78 to 0.95 the sum is 250 × (0.802 − 0.329) = 118 kVAr, so you would order a 125 kVAr bank.
How can I convert kVAr into microfarads?
A three-phase delta bank needs C per phase = Q ÷ (3 × 2πf × V²), Q being in VAr and V the line voltage. For the 118 kVAr example at 400 V and 50 Hz, that comes to roughly 785 µF in each phase. Wire the same bank in star and each phase needs three times the capacitance, though its voltage rating can be lower.
Will power factor correction lower my power bill?
Look at the tariff first. Commercial and industrial ones usually bill reactive power or kVA demand, or add a low-PF surcharge, and there correction pays. A home is billed on kWh only, so a capacitor leaves a household bill untouched. Your own cables do lose a little less to I²R heating, but the gain is small.
Which power factor is the right target?
Between 0.95 and 0.98 for most sites. Chasing exactly 1.0 needs extra kVAr for almost no gain, and when load drops the power factor can swing leading. Automatic stepped banks avoid that by adding and removing capacitors as the load moves.
By how much does correction reduce current?
For a fixed kW load, current scales as 1 ÷ PF, so raising PF from 0.78 to 0.95 takes 18% off the current. Heating losses scale with current squared, which is why cables and transformers shed about a third of their I²R loss.
At what point is a detuned capacitor bank required?
When variable-speed drives, UPS units, LED drivers and rectifiers together exceed roughly 15–25% of the load. Without the reactor, resonance between capacitors and supply transformer at a harmonic can destroy the capacitors early. A detuned bank puts a series reactor in front, commonly tuned to 189 Hz (7%) on a 50 Hz system.

Sources & references

  1. IEC 60831-1 — Shunt power capacitors of the self-healing type for AC systems up to 1,000 V
  2. IEEE Std 1036 — Guide for the Application of Shunt Power Capacitors
  3. US DOE — Reducing Power Factor Cost (Motor Systems Tip Sheet #8)
  4. Schneider Electric — Electrical Installation Guide, chapter L: Power factor correction