How the sizing works
Transformers are rated in kVA because winding temperature follows current, whatever the load’s power factor. The calculator therefore divides your peak kW by the power factor, applies a growth margin and rounds up to a catalogue size. Around that size it reports loading, currents on each side, losses, efficiency, the yearly cost of the losses and a first guess at the secondary fault current.
Loss figures come from the EU Ecodesign Tier 2 limits for liquid-immersed distribution transformers (mandatory since July 2021) unless you change them. Compliant units on the European market are no worse. Nameplate data you hold can replace these defaults in the advanced section.
Equations
Full-load current I_n = S_n ÷ (√3 × V) Loading x = S_load ÷ S_n Losses P_loss = P0 + x² × Pk Efficiency η = x·S_n·PF ÷ (x·S_n·PF + P_loss) Maximum η at x = √(P0 ÷ Pk)
Secondary short-circuit current (infinite source) I_k ≈ I_n ÷ u_k
P0 = no-load loss, Pk = load loss at rated current, u_k = impedance voltage (usually 4% to 630 kVA, 6% beyond that on 11–20 kV units).
Walk-through with the preset values
The preset site peaks at 420 kW, PF 0.9, allows 20% growth, averages half of peak, takes 11 kV in and delivers 400 V.
- Peak demand is 467 kVA (420 ÷ 0.9); with the margin it becomes 560 kVA, and the nearest standard size up is 630 kVA.
- The transformer then runs at 74% of rating on the peak and 37% on an average day.
- On the 400 V side it passes 909 A (630,000 ÷ (1.732 × 400)); on the primary, 33 A.
- For 630 kVA, Tier 2 allows P0 = 540 W and Pk = 4,600 W. Load loss at 37% is 0.37² × 4,600 = 631 W, giving roughly 1.17 kW overall.
- Over a year that is about 10,260 kWh, around 1,540 at 0.15/kWh. Average-load efficiency is 99.45%, only a little under the best point, which falls at 34% loading.
- A fault on the LV side, fed from an infinite source, could reach 909 ÷ 0.04 = 22.7 kA. Main-board breakers must be able to break at least this. For a result that counts source impedance and cables, go to the short-circuit current calculator.
Tier 2 data by size
| Rating | No-load loss P0 | Load loss Pk | 400 V full-load current |
|---|---|---|---|
| 100 kVA | 130 W | 1,250 W | 144 A |
| 250 kVA | 270 W | 2,350 W | 361 A |
| 400 kVA | 387 W | 3,250 W | 577 A |
| 630 kVA | 540 W | 4,600 W | 909 A |
| 1,000 kVA | 693 W | 7,600 W | 1,443 A |
| 1,600 kVA | 1,080 W | 12,000 W | 2,309 A |
| 2,500 kVA | 1,575 W | 18,500 W | 3,608 A |
Transformers from before roughly 2015 frequently lose 50–100% more in the core. With 8,760 running hours a year, that gap can be reason enough to swap one out.
Growth margin and overload
Plan 20–25% extra where a commercial or industrial site is likely to expand, and more if EV charging, heat pumps or new lines are on the way. Brief overloads are allowed by IEEE C57.91 and IEC 60076-7 when the ambient was cool and the earlier load light. A normal peak at 70–85% of nameplate keeps hot-spot temperature and ageing modest.
Where solar or batteries export power, base the size on the inverter’s top kVA output, including reactive capability, not on typical flows.
Interpreting the numbers
- Recommended rating: the smallest catalogue size that still clears peak load with the margin on top.
- Peak loading over 85% leaves a thin reserve; under 40% hints at an oversized unit.
- Yearly loss cost is the operating bill of the transformer itself. Across 25–30 years it can outweigh the purchase price, so utilities score bids on capitalised losses.
- Candidate ratings list the sizes either side, to balance price against losses.
Caveats
A flat average load understates losses for spiky real profiles. Harmonics from drives and electronics raise load loss (derating: IEEE C57.110). Heat, thin air at altitude and a poorly ventilated enclosure all lower what the unit can carry continuously. The fault-current figure disregards upstream impedance and motor contribution, which makes it a cautious first pass.
Method & assumptions
Choose the size first. The required rating is S = P ÷ PF × (1 + margin), moved up to the next IEC standard step, and the full-load current it draws is I = S ÷ (√3 × V). Then check how hard the unit is worked, using the loading x = Sload ÷ Sn. Total loss at that loading is Ploss = P0 + x² × Pk. Efficiency follows from the load and that loss, η = x Sn PF ÷ (x Sn PF + Ploss), and its best point is at x = √(P0 ÷ Pk). Finally, expect a secondary short-circuit current of In ÷ uk when the source is infinite.
Frequently asked questions
How do I work out what size transformer I need?
Which kVA ratings are standard for transformers?
How much current does a 1,000 kVA transformer carry at full load?
What are no-load and load losses?
Which load level gives a transformer its best efficiency?
Is oversizing a transformer a mistake?
Sources & references
Embed this calculator
Free for bloggers, installers, schools and NGOs. Copy the snippet below and it stays current by itself.