Electrical engineering calculator

Pick the generator kVA that handles your running load and motor starting

Match a diesel or gas genset to your site by running load and largest motor. Compare running kVA, starting kVA by method (DOL, star-delta, soft-starter, VFD), voltage dip per standard size, and the standby or prime rating to buy.

Editable share link Branded PDF report Free · no sign-up

Results

Suggested size: 125 kVA, standby-rated duty (100 kW at PF 0.8). Running load calls for 85 kVA with margin. Starting the 15 kW motor pulls about 125 kVA and gives a 13% voltage dip on this generator, so engine load during the start sets the size.
Recommended generator
125kVA
100 kW at PF 0.8, standby
Running load
71kVA
60 kW at PF 0.85
Needed for the running load
85kVA
includes margin, non-linear loads and duty
Motor starting kVA
125kVA
6.5 × 19.2 kVA running
Needed to limit the voltage dip
75kVA
dip limit 20%
Voltage dip on this set
13%
Engine loading while starting
89kW
needs at least 101 kVA
Running load on the set
56%
Diesel burnt at running load
23L/h
Voltage dip at motor start for each generator size
What sets the size (kVA)

Ways of starting this motor

MethodStarting currentStarting kVAGenerator size to stay within the dip limit (kVA)
Direct-on-line (DOL)6.5 × FLC125100
Star-delta2.2 × FLC42100
Soft starter3.5 × FLC67100
Variable-speed drive (VFD)1.2 × FLC23100
  • Use this as a screening check only. The voltage-dip formula is built on the alternator subtransient reactance and takes no account of the voltage regulator's response or engine speed dip. Verify with the manufacturer's sizing software (motor starting curves, transient response class from ISO 8528-5).
  • When several motors might start together, enter their combined kW as the largest motor. Staggering the starts, or using soft starters or drives, often lets you pick a much smaller generator.

Three checks, one answer

A genset has to pass three separate checks. First, the alternator must carry the steady load without overheating. Second, voltage must stay within limits when the biggest motor starts; connected directly to the supply, it draws six to seven times its running current for a moment, at a poor power factor. Third, the engine has to deliver the power that start demands without stalling or losing too much speed.

Each check yields a kVA figure; the largest wins and is rounded up to the next standard genset. The result also tells you which check decided, showing whether a soft starter or drive could justify a smaller machine.

Equations

Running kVA = kW ÷ PF Required (running) = running kVA × (1 + margin) × (1 + 0.5 × non-linear share) ÷ duty factor duty factor = 1 for standby, 0.8 for prime

Motor running kVA = motor kW ÷ (η × PF) Motor starting kVA = running kVA × starting-current multiple

Voltage dip ≈ x″d × S_start ÷ (S_gen + x″d × S_start) → S_gen ≥ x″d × S_start × (1 − dip) ÷ dip

Engine kW at start = S_start × starting PF + other running kW ≤ 1.1 × (S_gen × 0.8)

Starting-current multiples used by default: 6.5 DOL, 2.2 star-delta, 3.5 soft starter, 1.2 drive. A DOL induction motor starts at a low power factor, roughly 0.3–0.4, so the engine sees far fewer kW than the kVA suggests. For small and medium alternators, subtransient reactance x″d usually falls at 0.12–0.20 per unit.

Walk-through

Default inputs: 60 kW standby load, PF 0.85, 10% non-linear; a 15 kW motor on a direct-on-line start; 20% dip limit; 15% margin.

  1. Steady load: 60 ÷ 0.85 = 70.6 kVA; with margin and the non-linear allowance, 70.6 × 1.15 × 1.05 = 85 kVA.
  2. The motor draws 15 ÷ 0.78 = 19.2 kVA running and, at 6.5×, 125 kVA on starting.
  3. Dip check: 0.15 × 125 × 0.8 ÷ 0.2 = 75 kVA.
  4. Engine check: the motor takes 125 × 0.35 = 44 kW, other loads 45 kW, so about 89 kW in total. A 100 kVA (80 kW) engine with 10% transient headroom supplies only 88 kW, which pushes the answer up to 125 kVA.

Change the starter to a soft starter and starting kVA drops to about 67. The engine check then needs 82 kVA, so a 100 kVA set will do. With a drive the requirement falls to the 85 kVA steady-load figure, which is still a 100 kVA standard size. A soft starter costs far less than the larger generator it avoids, which is the typical trade-off.

Starting methods compared

Method Inrush current Torque on start Remarks
Direct-on-line (DOL) 6–7.5 × FLC 150–250% Simplest option, toughest on the generator
Star-delta 2–2.5 × FLC ≈ 33% of DOL A current spike occurs at changeover
Soft starter 3–4 × FLC adjustable Suits pumps and fans
Variable-speed drive 1–1.5 × FLC up to 150% Allows the smallest generator but adds harmonics

North American motors carry a NEMA code letter on the nameplate that states locked-rotor kVA per horsepower, and a multiple can be calculated from it.

Interpreting the output

  • Recommended generator: the standard kVA size passing all three checks, with a kW rating of 80% of that kVA.
  • Dip on this set: what the selected generator really produces at motor start. On the bar chart, sizes that meet your limit are coloured.
  • Load on the set while running ought to sit between 40% and 80%. Extended running under 30% risks wet-stacking.
  • Diesel use is a rough figure at running load; for the complete fuel curve and cost per kWh, go to the generator fuel calculator.

Boundaries of the method

Treat this as a screening step. The real dip is set by the automatic voltage regulator, the excitation system (PMG or shunt), the engine governor and turbocharger response. Manufacturers’ sizing software represents these with tested motor-starting curves and ISO 8528-5 transient classes. Several motors starting together, lifts, X-ray equipment and large UPS loads deserve extra care. Both engine and alternator lose rating at altitude and in high ambient heat. Use the result to shortlist, then have the supplier confirm.

Method & assumptions

Follow four checks. (1) Steady load: kW ÷ PF gives kVA, which is lifted by the design margin, by 0–50% when loads are non-linear and by 1/0.8 for prime duty. (2) Starting a motor draws motor kW ÷ (η × PF) × starting current multiple, in kVA. (3) Supply sag: dip ≈ x″d Sstart ÷ (Sgen + x″d Sstart), so a permitted dip d demands Sgen ≥ x″d Sstart (1 − d) ÷ d. (4) Prime mover: the engine supplies Sstart × starting PF + other running kW at that instant, compared with kVA × 0.8 plus a tolerated 10% transient overload. Buy the nearest standard size that clears the toughest check.

Frequently asked questions

How do I choose the right generator size?
Total the kW of all loads running together, divide by power factor to get kVA, then add 10–25% margin. Then test the largest motor. Started direct-on-line, it often demands 6–7 times its running kVA, which must neither produce an unacceptable voltage dip nor overload the engine. Take the greater of the two results and round up to a standard size.
What generator will start my motor?
With nothing else on the supply, a direct-on-line motor roughly needs a generator 3–5 times its kW rating. Star-delta or soft starting reduces the multiple, and a variable-speed drive brings it down to about 1.2–1.5. The calculator derives the result from starting kVA, the permitted voltage dip and what the engine can take.
Standby rating or prime rating?
Standby (ISO 8528 ESP) covers emergencies during a grid outage: few hours per year, average load about 70% of rating. Prime (PRP) allows unlimited hours where no grid exists, with 10% overload for 1 hour in 12. Typically a set's prime rating is about 90% of standby, and many designers keep prime sets' average load below 70–80%.
Why quote generators in kVA instead of kW?
Current (heating) caps the alternator; kW caps the engine. Makers rate kVA at 0.8 power factor, so 100 kVA means 80 kW. If the load's power factor is below 0.8, the alternator can overload before the engine reaches full power.
Acceptable voltage dip on motor start?
Around 15% if sensitive electronics, lifts or lighting share the supply, and 20–30% for motors alone. At roughly 30–35% and beyond, contactors may drop out and the motor may fail to accelerate. A larger alternator, a soft starter or a drive each reduces it.
Is it fine to run a generator lightly loaded?
Not for long. A diesel below about 30% load for extended periods wet-stacks, collecting unburnt fuel and soot in the exhaust. Do not oversize heavily just for motor starting; a soft starter or drive often costs less than a much larger set.

Sources & references

  1. ISO 8528-1 and 8528-5 — Reciprocating engine driven generating sets: ratings and transient performance
  2. IEEE Std 446 (Orange Book) — Emergency and Standby Power Systems
  3. NEMA MG 1 — Motors and Generators (locked-rotor kVA code letters)
  4. Caterpillar — Generator set sizing and motor starting (Application & Installation Guide)