Three checks, one answer
A genset has to pass three separate checks. First, the alternator must carry the steady load without overheating. Second, voltage must stay within limits when the biggest motor starts; connected directly to the supply, it draws six to seven times its running current for a moment, at a poor power factor. Third, the engine has to deliver the power that start demands without stalling or losing too much speed.
Each check yields a kVA figure; the largest wins and is rounded up to the next standard genset. The result also tells you which check decided, showing whether a soft starter or drive could justify a smaller machine.
Equations
Motor running kVA = motor kW ÷ (η × PF) Motor starting kVA = running kVA × starting-current multiple
Voltage dip ≈ x″d × S_start ÷ (S_gen + x″d × S_start) → S_gen ≥ x″d × S_start × (1 − dip) ÷ dip
Engine kW at start = S_start × starting PF + other running kW ≤ 1.1 × (S_gen × 0.8)
Starting-current multiples used by default: 6.5 DOL, 2.2 star-delta, 3.5 soft starter, 1.2 drive. A DOL induction motor starts at a low power factor, roughly 0.3–0.4, so the engine sees far fewer kW than the kVA suggests. For small and medium alternators, subtransient reactance x″d usually falls at 0.12–0.20 per unit.
Walk-through
Default inputs: 60 kW standby load, PF 0.85, 10% non-linear; a 15 kW motor on a direct-on-line start; 20% dip limit; 15% margin.
- Steady load: 60 ÷ 0.85 = 70.6 kVA; with margin and the non-linear allowance, 70.6 × 1.15 × 1.05 = 85 kVA.
- The motor draws 15 ÷ 0.78 = 19.2 kVA running and, at 6.5×, 125 kVA on starting.
- Dip check: 0.15 × 125 × 0.8 ÷ 0.2 = 75 kVA.
- Engine check: the motor takes 125 × 0.35 = 44 kW, other loads 45 kW, so about 89 kW in total. A 100 kVA (80 kW) engine with 10% transient headroom supplies only 88 kW, which pushes the answer up to 125 kVA.
Change the starter to a soft starter and starting kVA drops to about 67. The engine check then needs 82 kVA, so a 100 kVA set will do. With a drive the requirement falls to the 85 kVA steady-load figure, which is still a 100 kVA standard size. A soft starter costs far less than the larger generator it avoids, which is the typical trade-off.
Starting methods compared
| Method | Inrush current | Torque on start | Remarks |
|---|---|---|---|
| Direct-on-line (DOL) | 6–7.5 × FLC | 150–250% | Simplest option, toughest on the generator |
| Star-delta | 2–2.5 × FLC | ≈ 33% of DOL | A current spike occurs at changeover |
| Soft starter | 3–4 × FLC | adjustable | Suits pumps and fans |
| Variable-speed drive | 1–1.5 × FLC | up to 150% | Allows the smallest generator but adds harmonics |
North American motors carry a NEMA code letter on the nameplate that states locked-rotor kVA per horsepower, and a multiple can be calculated from it.
Interpreting the output
- Recommended generator: the standard kVA size passing all three checks, with a kW rating of 80% of that kVA.
- Dip on this set: what the selected generator really produces at motor start. On the bar chart, sizes that meet your limit are coloured.
- Load on the set while running ought to sit between 40% and 80%. Extended running under 30% risks wet-stacking.
- Diesel use is a rough figure at running load; for the complete fuel curve and cost per kWh, go to the generator fuel calculator.
Boundaries of the method
Treat this as a screening step. The real dip is set by the automatic voltage regulator, the excitation system (PMG or shunt), the engine governor and turbocharger response. Manufacturers’ sizing software represents these with tested motor-starting curves and ISO 8528-5 transient classes. Several motors starting together, lifts, X-ray equipment and large UPS loads deserve extra care. Both engine and alternator lose rating at altitude and in high ambient heat. Use the result to shortlist, then have the supplier confirm.
Method & assumptions
Follow four checks. (1) Steady load: kW ÷ PF gives kVA, which is lifted by the design margin, by 0–50% when loads are non-linear and by 1/0.8 for prime duty. (2) Starting a motor draws motor kW ÷ (η × PF) × starting current multiple, in kVA. (3) Supply sag: dip ≈ x″d Sstart ÷ (Sgen + x″d Sstart), so a permitted dip d demands Sgen ≥ x″d Sstart (1 − d) ÷ d. (4) Prime mover: the engine supplies Sstart × starting PF + other running kW at that instant, compared with kVA × 0.8 plus a tolerated 10% transient overload. Buy the nearest standard size that clears the toughest check.
Frequently asked questions
How do I choose the right generator size?
What generator will start my motor?
Standby rating or prime rating?
Why quote generators in kVA instead of kW?
Acceptable voltage dip on motor start?
Is it fine to run a generator lightly loaded?
Sources & references
- ISO 8528-1 and 8528-5 — Reciprocating engine driven generating sets: ratings and transient performance
- IEEE Std 446 (Orange Book) — Emergency and Standby Power Systems
- NEMA MG 1 — Motors and Generators (locked-rotor kVA code letters)
- Caterpillar — Generator set sizing and motor starting (Application & Installation Guide)
Embed this calculator
Free for bloggers, installers, schools and NGOs. Copy the snippet below and it stays current by itself.