IRR (Internal Rate of Return)
The discount rate that brings a project's net present value to zero; it expresses the project's effective yearly return.
The internal rate of return (IRR) condenses a project's cash flows into a single annual rate. It is the rate that sets NPV to zero, and it is usually found by trial and iteration.
When IRR beats the hurdle rate (typically the WACC or an investor's own target), the project adds value. There are two variants:
- Project (unlevered) IRR is calculated on total cash flows before debt service.
- Equity (levered) IRR uses cash flows to equity after debt service; it is higher than the project IRR when borrowing costs less than the project returns.
Typical targets in mature renewables markets, 2024 to 2025: contracted utility-scale solar and onshore wind earn equity IRRs of about 7 to 10% nominal; merchant or emerging-market projects aim for 10 to 15% or more; offshore wind for 8 to 12%. Regulated networks earn roughly 5 to 7%. A home PV system commonly shows 6 to 15%, depending on tariffs and how much power is self-consumed.
Weaknesses: the calculation implicitly reinvests interim cash at the IRR itself; it can produce more than one answer if cash flows switch sign repeatedly (a big mid-life repowering or decommissioning cost does this); and it takes no account of scale. The modified IRR (MIRR) corrects the reinvestment problem. If you must rank mutually exclusive options, use NPV.
Related terms
All terms →- NPV (Net Present Value)
Today's value of every future cash flow a project will generate, less what it costs to build; a result above zero means the project creates value.
- WACC
Weighted average cost of capital: the mix of returns lenders and shareholders require, used as the discount rate when valuing energy projects.
- Discount rate
A yearly percentage that converts future costs and income into today's value, capturing both the time value of money and investment risk.
- Payback period
How long it takes for an investment's accumulated savings or revenue to match what it cost.
- CAPEX
Short for capital expenditure: the money spent up front to build an energy asset, normally stated per kW (power plants) or per kWh (storage).
- LCOE (Levelized Cost of Electricity)
The flat price per MWh that would repay every lifetime cost of a power plant, once costs and output are both discounted to present value.