Heating & gas calculator

Ground source heat pump: how deep to drill, how big a loop, SCOP and cost

Tell the tool how much heat your building needs and it designs the ground loop: kW rating, borehole metres or horizontal collector area for the soil or rock you have (VDI 4640 rates), seasonal COP, and running and installed costs against air-source and gas.

Editable share link Branded PDF report Free · no sign-up

Results

Expect to drill about 140 m (2 × 70 m) for a 8 kW ground-source heat pump in “Average soil / rock (λ ≈ 2 W/mK)”, assuming ~47 W/m. SCOP is ≈ 4.23, and running costs fall by 141 €/yr against an air-source unit. A yearly energy limit of ~100 kWh per metre, not peak power, fixes the length so the ground is not drained of heat over the years.
Total borehole length
140m
2 boreholes × 70 m · 47 W/m
Heat pump size
8kW
design heat loss 7 kW at -9 °C
Seasonal COP (SCOP)
4.23
air-source equivalent 3.79
Running cost
€1,216
Yearly electricity draw: 4,342 kWh
Saving vs air source
€141
Saving vs gas boiler
€825
gas 2,041 €/yr at 90% efficiency
Estimated installed cost
€21,818
ground loop 9,818 + unit 12,000
Heat drawn from the soil
14,026kWh/yr
100 kWh per m of borehole
Full-load hours
2,296h/yr
Annual heat delivered
18,368kWh
CO₂ per year
1.52t
vs 3.73 t with gas
Ground temperature
11.4°C
Berlin, Germany
Electricity per month, ground-source against air-source
Required borehole depth for each ground type

Ground types and their VDI 4640 guide extraction rates

GroundBorehole W/m (1,800 h)W/m (2,400 h)Horizontal W/m² (1,800 h)Borehole needed (m)Loop area (m²)
Dry gravel / sand252012293642
Moist clay / loam453528166265
Gravel / sand saturated with water706038140234
Limestone (massive)625230140244
Sandstone726030140244
Granite / gneiss756330140244
Basalt524530140244
Average soil / rock (λ ≈ 2 W/mK)554525140293
  • The extraction rates come from VDI 4640 guide values, which suit small installations (< 30 kW) with no groundwater movement. For a final design, rely on a thermal response test plus an EED/GLHEPro-style simulation, or on the MCS MIS 3005 tables.
  • The borehole length you see is whichever is greater: the figure from the peak-power rule (W/m) or the one from a yearly energy cap of 100 kWh/m (60 kWh/m² for horizontal loops). Keep boreholes at least 6 m apart as a rule. A horizontal loop wants free land of about 1.5–2× the heated floor area.
  • Climate used: Berlin, Germany. During the heating season the brine circulates roughly 4–8 K colder than the undisturbed ground.

Sizing logic

Brine circulates in a closed plastic loop, either in vertical boreholes or in horizontal collectors under the garden, and carries low-grade heat from the earth to the heat pump, which lifts it to heating temperature. Three linked questions drive the design: what capacity is needed, how much heat is drawn from the soil, and how long a loop keeps the ground from cooling over the years. The calculator follows this sequence:

  1. Heat demand. Calculated from floor area, insulation (or an annual kWh figure you already have) and hot water, month by month, with temperature bins matched to your climate. Same engine as the air-source heat pump calculator.
  2. Brine and COP. Unless you supply a value, ground temperature is the annual mean air temperature + 1.5 K. During heating, brine is 4–8 K colder than that, and more so in the coldest months. COP follows from brine and flow temperatures.
  3. Capacity is set at the design-day heat loss for the location plus a 10% allowance for hot-water recovery.
  4. Ground extraction. The power drawn from soil is heat output × (1 − 1/SCOP). Next, divide by the specific extraction rate that VDI 4640 gives for your ground type, interpolated to your full-load hours; the quotient is the borehole length or collector area. A cap on yearly energy, 100 kWh per metre per year (60 kWh/m² for horizontal loops), is then applied, and the larger result wins.
  5. Costs: drilling or trenching, the unit itself, running cost, plus a comparison with air-source heat pumps and gas boilers.

Equations

P_extract = P_hp × (1 − 1/SCOP) L_borehole = max( P_extract / q_W/m , E_extract / 100 kWh/m·yr ) A_horizontal = max( P_extract / q_W/m² , E_extract / 60 kWh/m²·yr ) E_extract = heat delivered − electricity used COP = η × T_cond / (T_cond − T_brine + 3 K) T_brine = T_ground − 4 K − 4 K × (monthly load / peak load)

Case: 180 m² house, Berlin

The default building is a 180 m² Berlin home, average insulation, underfloor heating at 35 °C flow, four people’s hot water. It needs about 18,370 kWh a year and has a design heat loss of 7.0 kW at −9 °C, which leads the tool to choose an 8 kW ground source unit.

With ground at an estimated 11.4 °C, seasonal COP reaches 4.23; an air-source unit in that house would manage about 3.79. Electricity use is about 4,340 kWh, ≈ 1,216 € a year at 0.28 €/kWh. Savings: roughly 141 € yearly versus air source and about 825 € versus a 90% gas boiler (which would cost 2,041 € at 0.10 €/kWh).

The ground supplies about 14,030 kWh yearly. Ground of average conductivity (λ ≈ 2 W/mK) would need about 130 m at roughly 47 W/m on the power criterion alone. The 100 kWh/m yearly cap pushes this to 140 m, e.g. two 70 m boreholes. Drilling at 70 €/m plus 12,000 € for the unit brings installed cost to about 21,800 €. A horizontal collector would instead occupy roughly 290 m². Emissions: about 1.5 t of CO₂ a year at 350 g/kWh grid intensity, versus 3.7 t using gas.

Interpreting the screen

  • Borehole length or collector area drives cost; the verdict names whether the energy cap or the power criterion set it.
  • Full-load hours above ~2,400 h indicate long seasons (cold climate, heavy hot-water use) and call for lower W/m rates.
  • Saving versus air source is what the ground loop’s extra price buys; divide that extra cost by it for rough payback.
  • Ground types table gives lengths per geology. A site survey or local drilling records show which applies.

Typical rates by ground (VDI 4640, small systems under 30 kW)

Geology W/m, borehole, 1,800 h W/m, borehole, 2,400 h W/m², horizontal, 1,800 h
Dry gravel / sand < 25 < 20 10–15
Moist clay / loam 35–50 30–40 25–30
Gravel or sand, saturated with water 65–80 55–65 35–40
Limestone (massive) 55–70 45–60 —
Sandstone 65–80 55–65 —
Granite, gneiss 65–85 55–70 —
Basalt 40–65 35–55 —

Practical pointers

  • Request a thermal response test above ~30 kW or when drilling several holes. Measuring real ground conductivity can trim or extend the field by 20–30%.
  • Space holes 6 m apart or more, since closer ones steal each other’s heat.
  • Hold flow temperature down. Ground source excels with 35 °C underfloor heating; with 55 °C radiators, its advantage over air source shrinks.
  • Think about passive cooling. In summer, circulating brine through the floor cools almost for free and partly restores the ground temperature.
  • Lower demand before sizing. The insulation savings calculator helps, and a smaller unit means a shorter, cheaper borehole.

Boundaries

The rates are only a guide: they presume little groundwater movement (which can raise them considerably) and standard single-U or double-U probe construction. Proper simulation (EED, GLHEPro or the MCS MIS 3005 tables) is needed when borehole fields lie close together, operating hours are very long, there are cooling loads, or the system is large. Drilling normally needs a permit, especially past 100 m or inside water-protection zones. Local quotes belong in the advanced settings, as cost varies greatly with country and site access.

Method & assumptions

The model runs each month with temperature bins for space heating and hot water; brine enters the heat pump at Tground − 4 K − 4 K × (monthly load ÷ peak load). Size the unit at design heat loss + 10%. Heat taken from the ground = heat-pump output × (1 − 1/SCOP). The borehole length is that extraction power ÷ the specific extraction rate (W/m) for the ground type, interpolated between the VDI 4640 values for 1,800 h and 2,400 h of full load. Horizontal collector area follows the same logic with W/m².

Frequently asked questions

What borehole depth does a ground-source system need?
Assume 15–25 m of borehole for each kW of heat-pump output in average ground. A 6–10 kW home thus needs 100–200 m, normally drilled as one or two holes of 60–150 m. Granite or sandstone, which conduct heat well, shorten this; dry sand or gravel stretches it to two or three times as much.
What land area does a horizontal ground loop take?
Allow 1.5–2.5 times the heated floor area, with the pipe buried 1.2–1.5 m. An 8 kW unit in moist loamy soil therefore wants 250–400 m² of open, unshaded land. In dry sandy soil, considerably more.
Ground source or air source, which is better?
Ground source is more efficient, reaching a typical SCOP of 4–5 against 3–3.5, because soil holds 8–12 °C all winter while air may fall below −10 °C. It is quiet outdoors and never needs defrosting. The catch: the ground loop raises installed cost by 6,000–15,000, so payback against air source tends to be long unless heat demand is high.
What does a ground source system cost to install?
European homes typically pay about 18,000–35,000 € installed. Of that, 8,000–15,000 € goes on the unit and its installation, and 50–100 € per metre on the borehole (10–25 € per m² for a horizontal loop). Subsidies, for example the UK Boiler Upgrade Scheme (£7,500) or German BEG funding, may cover much of it.
What does specific heat extraction rate mean?
It states how many watts one metre of borehole can pull from the ground over the long term. VDI 4640 puts it near 20 W/m for dry gravel and 70–85 W/m for granite or gneiss, assuming 1,800 operating hours per year; more hours lower the rate.
Could the loop cool the ground too far?
It can if the field is undersized: the soil nearby grows colder each year, the brine gets colder too and COP falls. To prevent this, designers also limit yearly extraction to about 100–120 kWh per metre for boreholes. The calculator checks the power criterion and the energy criterion together.

Sources & references

  1. VDI 4640 Part 2 — Thermal use of the underground: ground source heat pump systems
  2. MCS MIS 3005-D — Heat pump design standard (UK Microgeneration Certification Scheme)
  3. IEA Heat Pumping Technologies TCP
  4. US DOE — Geothermal heat pumps

Embed this calculator

Free for bloggers, installers, schools and NGOs. Copy the snippet below and it stays current by itself.